X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616061404000

Well Details

Well ID: 0616061404000
Loading map...
Location: 00/04-14-061-06W6/0
Location Alias: 00/04-14-61-06 W6M
Location Alias 2: 00/04-14-061-06 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 06
Section: 14
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA KAKWA 4-14-61-6
Operator Name: Jupiter Resources Inc.
License Number: 0420453
License Date: 2010-05-17
License Status: Issued
Spud Date: 2010-12-17
Final Drill Date: 2011-01-06
Well Total Depth: 3720.00 m
Surface Hole Latitude: 54.263790
Surface Hole Longitude: -118.807904

For data sources see[1][2]

Well History

Date Event
2010-05-17 Obtained License
2010-12-18 Direction Drilling Operation Performed - Deviate
2010-12-20 Surface Casing Operation Performed
2010-12-29 Well Log Performed
2010-12-31 Intermediate Casing Operation Performed
2011-01-06 Finished Drilling
2011-01-06 Well Mode changed to Drilled and Cased
2011-01-07 Well Log Performed
2011-01-08 Production Casing Operation Performed
2011-01-09 Rig Released
2011-01-24 Well Log Performed
2011-01-25 Perforation Treatment Performed - Jet Perforation
2011-01-25 Well Log Performed
2011-02-01 Perforation Treatment Performed - Fractured
2011-02-02 Well Fluid changed to Gas
2011-02-02 Well Mode changed to Testing
2011-02-03 Perforation Treatment Performed - Fractured
2011-02-03 Perforation Treatment Performed - Jet Perforation
2011-02-04 Perforation Treatment Performed - Fractured
2011-02-06 Perforation Treatment Performed - Jet Perforation
2011-02-07 Perforation Treatment Performed - Fractured
2011-02-07 Perforation Treatment Performed - Jet Perforation
2011-02-08 Perforation Treatment Performed - Fractured
2011-02-09 Well Log Performed
2011-02-10 Perforation Treatment Performed - Fractured
2011-02-10 Perforation Treatment Performed - Jet Perforation
2011-02-10 Well Log Performed
2011-02-11 Perforation Treatment Performed - Fractured
2011-02-11 Perforation Treatment Performed - Jet Perforation
2011-02-12 Perforation Treatment Performed - Fractured
2011-02-13 Perforation Treatment Performed - Jet Perforation
2011-02-14 Perforation Treatment Performed - Fractured
2011-03-16 Well Began Production
2011-03-16 Well Fluid changed to Gas
2011-03-16 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-12-18 155.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-25 Perforation 3680.00 3682.00 20
2011-02-04 Fracture 3454.00 3469.00 0
2011-02-06 Perforation 3439.00 3440.00 10
2011-02-06 Perforation 3432.00 3433.00 10
2011-02-06 Perforation 3416.00 3417.00 10
2011-02-07 Perforation 3375.00 3375.50 10
2011-02-07 Perforation 3358.00 3361.00 10
2011-02-07 Fracture 3416.00 3440.00 0
2011-02-08 Fracture 3358.00 3375.50 0
2011-02-10 Perforation 3323.00 3324.00 10
2011-02-10 Perforation 3307.00 3307.50 10
2011-02-01 Fracture 3680.00 3682.00 0
2011-02-10 Perforation 3241.00 3242.00 10
2011-02-10 Perforation 3217.00 3219.00 10
2011-02-10 Perforation 3205.00 3207.00 10
2011-02-10 Fracture 3241.00 3324.00 0
2011-02-10 Fracture 3241.00 3242.00 0
2011-02-11 Perforation 2994.00 2996.00 10
2011-02-11 Fracture 3205.00 3219.00 0
2011-02-12 Fracture 2994.00 2996.00 0
2011-02-13 Perforation 2974.00 2974.50 10
2011-02-13 Perforation 2966.00 2966.50 10
2011-02-03 Perforation 3566.00 3566.50 10
2011-02-13 Perforation 2921.00 2921.50 10
2011-02-13 Perforation 2908.00 2908.50 10
2011-02-13 Perforation 2874.00 2874.50 10
2011-02-14 Fracture 2874.00 2974.50 0
2011-02-14 Fracture 2874.00 2921.50 0
2011-02-03 Perforation 3552.00 3554.00 10
2011-02-03 Perforation 3476.00 3477.00 10
2011-02-03 Perforation 3468.00 3469.00 10
2011-02-03 Perforation 3454.00 3456.00 10
2011-02-03 Fracture 3552.00 3566.50 0
2011-02-04 Fracture 3454.00 3477.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6807 0.0 0.0 0.0
2012 7534 0.0 0.0 0.0
2013 6573 0.0 0.0 0.0
2014 8714 0.0 0.0 0.0
2015 8732 0.0 0.0 0.0
2016 4516 0.0 0.0 0.0
2017 4190 0.0 0.0 0.0
2018 7104 0.0 0.0 0.0
2019 6480 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References