X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616053604002

Well Details

Well ID: 0616053604002
Loading map...
Location: 00/04-36-061-05W6/2
Location Alias: 00/04-36-61-05 W6M
Location Alias 2: 00/04-36-061-05 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 36
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG KAKWA 4-36-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0392331
License Date: 2008-01-18
License Status: Amended
Spud Date: 2008-02-18
Final Drill Date: 2008-03-07
Well Total Depth: 3209.00 m
Surface Hole Latitude: 54.312828
Surface Hole Longitude: -118.615986

For data sources see[1][2]

Well History

Date Event
2008-01-18 Obtained License
2008-02-21 Surface Casing Operation Performed
2008-02-22 Direction Drilling Operation Performed - Deviate
2008-02-29 Intermediate Casing Operation Performed
2008-03-07 Finished Drilling
2008-03-07 Well Mode changed to Drilled and Cased
2008-03-08 Well Log Performed
2008-03-09 Production Casing Operation Performed
2008-03-09 Rig Released
2008-04-03 Well Log Performed
2008-04-04 Perforation Treatment Performed - Jet Perforation
2008-04-04 Well Log Performed
2008-04-05 Perforation Treatment Performed - Fractured
2008-04-06 Perforation Treatment Performed - Fractured
2008-04-06 Perforation Treatment Performed - Jet Perforation
2008-04-06 Well Log Performed
2008-04-07 Perforation Treatment Performed - Jet Perforation
2008-04-07 Well Log Performed
2008-04-08 Perforation Treatment Performed - Fractured
2008-04-08 Perforation Treatment Performed - Jet Perforation
2008-04-08 Well Log Performed
2008-04-09 Perforation Treatment Performed - Fractured
2008-04-14 Perforation Treatment Performed - Jet Perforation
2008-04-14 Well Log Performed
2008-04-15 Perforation Treatment Performed - Fractured
2008-04-21 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-02-22 637.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-04-04 Perforation 3167.00 3167.50 10
2008-04-06 Perforation 2980.50 2981.00 10
2008-04-06 Perforation 2974.50 2975.00 10
2008-04-06 Fracture 2974.50 2989.00 0
2008-04-07 Perforation 2891.50 2892.00 10
2008-04-07 Perforation 2887.50 2888.00 10
2008-04-07 Perforation 2881.00 2881.50 10
2008-04-07 Perforation 2877.50 2878.00 10
2008-04-07 Perforation 2873.00 2873.50 10
2008-04-07 Perforation 2869.00 2869.50 10
2008-04-08 Fracture 2869.00 2892.00 0
2008-04-04 Perforation 3161.00 3161.50 10
2008-04-08 Perforation 2805.00 2807.00 10
2008-04-09 Fracture 2805.00 2807.00 0
2008-04-14 Perforation 2753.50 2754.00 10
2008-04-14 Perforation 2747.00 2747.50 10
2008-04-14 Perforation 2743.00 2743.50 10
2008-04-14 Perforation 2739.00 2739.50 10
2008-04-15 Fracture 2739.00 2754.00 0
2008-04-04 Perforation 3070.50 3071.00 10
2008-04-05 Fracture 3161.00 3167.50 0
2008-04-05 Fracture 3070.50 3071.00 0
2008-04-06 Perforation 2999.00 2999.50 10
2008-04-06 Fracture 2999.00 2999.50 0
2008-04-06 Perforation 2988.50 2989.00 10
2008-04-06 Perforation 2983.00 2983.50 10

For data sources see[5]



References