If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616053516004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.321378,"lon":-118.620059,"icon":""}]} |
Location: 00/16-35-061-05W6/4 | |
Location Alias: 00/16-35-61-05 W6M | |
Location Alias 2: 00/16-35-061-05 W6/04 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 05 | |
Section: 35 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG KAKWA 16-35-61-5 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0354002 | |
License Date: 2006-03-14 | |
License Status: Issued | |
Spud Date: 2006-04-25 | |
Final Drill Date: 2006-05-23 | |
Well Total Depth: 3240.00 m | |
Surface Hole Latitude: 54.321378 | |
Surface Hole Longitude: -118.620059 |
Date | Event |
---|---|
2006-03-14 | Obtained License |
2006-04-25 | Direction Drilling Operation Performed - Deviate |
2006-04-27 | Surface Casing Operation Performed |
2006-05-09 | Well Log Performed |
2006-05-11 | Intermediate Casing Operation Performed |
2006-05-23 | Finished Drilling |
2006-05-23 | Well Mode changed to Drilled and Cased |
2006-05-24 | Well Log Performed |
2006-05-25 | Production Casing Operation Performed |
2006-05-25 | Rig Released |
2006-05-25 | Well Log Performed |
2006-06-23 | Well Log Performed |
2006-06-25 | Perforation Treatment Performed - Jet Perforation |
2006-06-25 | Well Log Performed |
2006-06-27 | Perforation Treatment Performed - Fractured |
2006-06-30 | Perforation Treatment Performed - Jet Perforation |
2006-06-30 | Well Log Performed |
2006-07-12 | Perforation Treatment Performed - Fractured |
2006-07-13 | Well Log Performed |
2006-07-14 | Perforation Treatment Performed - Jet Perforation |
2006-07-15 | Perforation Treatment Performed - Fractured |
2006-07-16 | Perforation Treatment Performed - Jet Perforation |
2006-07-16 | Well Fluid changed to Gas |
2006-07-16 | Well Log Performed |
2006-07-16 | Well Mode changed to Testing |
2006-07-18 | Perforation Treatment Performed - Fractured |
2006-07-19 | Perforation Treatment Performed - Jet Perforation |
2006-07-19 | Well Log Performed |
2006-07-20 | Perforation Treatment Performed - Jet Perforation |
2006-07-26 | Perforation Treatment Performed - Fractured |
2006-08-01 | Well Log Performed |
2006-08-02 | Perforation Treatment Performed - Jet Perforation |
2006-08-03 | Perforation Treatment Performed - Fractured |
2006-08-11 | Well Log Performed |
2006-08-22 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2006-04-25 | 550.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-06-25 | Perforation | 3089.00 | 3093.50 | 17 |
2006-07-15 | Fracture | 2967.00 | 2988.00 | 0 |
2006-07-16 | Perforation | 2865.00 | 2867.00 | 17 |
2006-07-18 | Fracture | 2865.00 | 2867.00 | 0 |
2006-07-19 | Perforation | 2789.00 | 2791.00 | 17 |
2006-07-20 | Perforation | 2519.00 | 2523.00 | 17 |
2006-07-26 | Fracture | 2519.00 | 2523.00 | 0 |
2006-08-02 | Perforation | 2504.00 | 2505.00 | 17 |
2006-08-02 | Perforation | 2500.00 | 2501.00 | 17 |
2006-08-02 | Perforation | 2484.00 | 2485.50 | 17 |
2006-08-02 | Perforation | 2476.00 | 2478.00 | 17 |
2006-06-25 | Perforation | 3082.00 | 3084.00 | 17 |
2006-08-03 | Fracture | 2476.00 | 2505.00 | 0 |
2006-06-27 | Fracture | 3082.00 | 3093.50 | 0 |
2006-06-30 | Perforation | 3057.00 | 3059.00 | 17 |
2006-07-12 | Fracture | 3057.00 | 3059.00 | 0 |
2006-07-14 | Perforation | 2985.50 | 2988.00 | 17 |
2006-07-14 | Perforation | 2975.00 | 2977.00 | 17 |
2006-07-14 | Perforation | 2973.00 | 2974.00 | 17 |
2006-07-14 | Perforation | 2967.00 | 2969.00 | 17 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 11 | 0.0 | 0.0 | 0.0 |
For data sources see[6]