X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616053501000

Well Details

Well ID: 0616053501000
Loading map...
Location: 00/01-35-061-05W6/0
Location Alias: 00/01-35-61-05 W6M
Location Alias 2: 00/01-35-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 35
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG CHIME 1-35-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0316560
License Date: 2004-10-13
License Status: Amended
Spud Date: 2005-03-22
Final Drill Date: 2005-05-08
Well Total Depth: 3275.00 m
Surface Hole Latitude: 54.311156
Surface Hole Longitude: -118.622530

For data sources see[1][2]

Well History

Date Event
2004-10-13 Obtained License
2005-03-25 Surface Casing Operation Performed
2005-04-01 Direction Drilling Operation Performed - Deviate
2005-04-08 Well Log Performed
2005-04-09 Intermediate Casing Operation Performed
2005-04-26 Liner Casing Operation Performed
2005-04-26 Well Log Performed
2005-05-08 Finished Drilling
2005-05-08 Well Mode changed to Drilled and Cased
2005-05-09 Rig Released
2005-05-09 Well Log Performed
2005-07-11 Well Log Performed
2005-07-20 Well Log Performed
2005-07-22 Well Log Performed
2005-07-23 Perforation Treatment Performed - Jet Perforation
2005-07-23 Well Log Performed
2005-07-24 Perforation Treatment Performed - Cement Squeeze
2005-07-25 Perforation Treatment Performed - Jet Perforation
2005-07-25 Well Log Performed
2005-07-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-26 Perforation Treatment Performed - Jet Perforation
2005-07-26 Well Log Performed
2005-07-27 Well Log Performed
2005-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-28 Perforation Treatment Performed - Cement Squeeze
2005-07-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-29 Perforation Treatment Performed - Cement Squeeze
2005-07-29 Perforation Treatment Performed - Jet Perforation
2005-07-29 Well Log Performed
2005-07-30 Perforation Treatment Performed - Jet Perforation
2005-07-30 Well Log Performed
2005-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-07-31 Perforation Treatment Performed - Cement Squeeze
2005-07-31 Perforation Treatment Performed - Jet Perforation
2005-07-31 Well Log Performed
2005-08-01 Perforation Treatment Performed - Cement Squeeze
2005-08-01 Perforation Treatment Performed - Jet Perforation
2005-08-01 Well Log Performed
2005-08-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-02 Perforation Treatment Performed - Cement Squeeze
2005-08-02 Perforation Treatment Performed - Jet Perforation
2005-08-02 Well Log Performed
2005-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-08-03 Perforation Treatment Performed - Cement Squeeze
2005-08-03 Plug Back Performed
2005-08-03 Well Mode changed to Abandoned and Whipstocked
2007-07-11 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2005-04-01 552.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-07-23 Perforation 3234.00 3235.00 17
2005-07-29 Perforation 3052.00 3053.00 17
2005-07-29 Cement Squeeze 3052.00 3116.00 0
2005-07-29 Packing Device Capped w/Cement 2985.00 3105.00 0
2005-07-30 Perforation 2960.00 2961.00 17
2005-07-30 Perforation 2800.00 2801.00 17
2005-07-31 Cement Squeeze 2960.00 2961.00 0
2005-07-31 Packing Device Capped w/Cement 2947.00 2955.00 0
2005-07-31 Perforation 2824.00 2825.00 17
2005-08-01 Cement Squeeze 2800.00 2825.00 0
2005-08-01 Perforation 2744.00 2745.00 17
2005-07-24 Cement Squeeze 3234.00 3235.00 0
2005-08-02 Cement Squeeze 2744.00 2745.00 0
2005-08-02 Packing Device Capped w/Cement 2727.00 2735.00 0
2005-08-02 Perforation 2676.00 2677.00 17
2005-08-03 Cement Squeeze 2676.00 2677.00 0
2005-08-03 Packing Device Capped w/Cement 2553.00 2668.00 0
2005-07-25 Perforation 3192.00 3193.00 17
2005-07-25 Perforation 3142.00 3143.00 17
2005-07-26 Packing Device Capped w/Cement 3174.00 3182.00 0
2005-07-26 Perforation 3168.00 3169.00 17
2005-07-28 Cement Squeeze 3142.00 3169.00 0
2005-07-28 Packing Device Capped w/Cement 3135.00 3155.00 0
2005-07-29 Perforation 3115.00 3116.00 17

For data sources see[5]



References