If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616053314006 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.32631,"lon":-118.686555,"icon":""}]} |
Location: 00/14-33-061-05W6/6 | |
Location Alias: 00/14-33-61-05 W6M | |
Location Alias 2: 00/14-33-061-05 W6/06 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 05 | |
Section: 33 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA KAKWA 14-33-61-5 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0215954 | |
License Date: 1998-06-17 | |
License Status: Amended | |
Spud Date: 1998-07-27 | |
Final Drill Date: 1999-03-25 | |
Well Total Depth: 4325.00 m | |
Surface Hole Latitude: 54.326310 | |
Surface Hole Longitude: -118.686555 |
Date | Event |
---|---|
1998-06-17 | Obtained License |
1998-08-02 | Surface Casing Operation Performed |
1998-08-27 | Direction Drilling Operation Performed - Deviate |
1998-09-18 | Intermediate Casing Operation Performed |
1999-02-26 | Direction Drilling Operation Performed - Deviate |
1999-03-19 | Liner Casing Operation Performed |
1999-03-25 | Finished Drilling |
1999-03-25 | Perforation Treatment Performed - Open-Hole Completion |
1999-03-25 | Well Mode changed to Drilled and Cased |
1999-05-26 | Perforation Treatment Performed - Acid Wash - No Pressure |
1999-05-27 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1999-06-01 | Rig Released |
2005-01-15 | Perforation Treatment Performed - Jet Perforation |
2005-01-20 | Perforation Treatment Performed - Fractured |
2005-01-29 | Perforation Treatment Performed - Jet Perforation |
2005-01-29 | Well Log Performed |
2005-02-02 | Perforation Treatment Performed - Fractured |
2007-08-01 | Perforation Treatment Performed - Jet Perforation |
2007-08-02 | Perforation Treatment Performed - Jet Perforation |
2007-08-07 | Perforation Treatment Performed - Fractured |
2007-08-10 | Perforation Treatment Performed - Jet Perforation |
2007-08-11 | Perforation Treatment Performed - Fractured |
2007-08-24 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1998-08-27 | 3350.00 | Deviate (5 - 79 degrees) |
1999-02-26 | 3979.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-03-25 | Open Hole/Barefoot Completion | 4225.00 | 4325.00 | 0 |
2007-08-02 | Perforation | 2940.50 | 2941.00 | 7 |
2007-08-02 | Perforation | 2849.50 | 2850.00 | 7 |
2007-08-02 | Perforation | 2847.50 | 2848.00 | 7 |
2007-08-02 | Perforation | 2809.00 | 2809.50 | 7 |
2007-08-02 | Perforation | 3124.50 | 3125.00 | 7 |
2007-08-02 | Perforation | 3119.00 | 3119.50 | 7 |
2007-08-02 | Perforation | 3110.00 | 3110.50 | 7 |
2007-08-02 | Perforation | 3104.50 | 3105.00 | 7 |
2007-08-02 | Perforation | 3035.50 | 3036.00 | 7 |
2007-08-02 | Perforation | 2973.00 | 2973.50 | 7 |
1999-05-26 | Acid Wash | 4225.00 | 4325.00 | 0 |
2007-08-02 | Perforation | 2969.50 | 2970.00 | 7 |
2007-08-07 | Fracture | 2809.00 | 2941.00 | 0 |
2007-08-07 | Fracture | 3104.50 | 3140.00 | 0 |
2007-08-07 | Fracture | 3035.50 | 3036.00 | 0 |
2007-08-07 | Fracture | 2969.50 | 2973.50 | 0 |
2007-08-10 | Perforation | 2494.50 | 2495.00 | 7 |
2007-08-10 | Perforation | 2491.00 | 2491.50 | 7 |
2007-08-10 | Perforation | 2485.50 | 2486.00 | 7 |
2007-08-10 | Perforation | 2483.00 | 2484.00 | 7 |
2007-08-10 | Perforation | 2475.00 | 2475.50 | 7 |
1999-05-27 | Acid Treatment | 4225.00 | 4325.00 | 0 |
2007-08-10 | Perforation | 2458.50 | 2459.00 | 7 |
2007-08-10 | Perforation | 2453.50 | 2454.00 | 7 |
2007-08-10 | Perforation | 1976.50 | 1977.00 | 7 |
2007-08-11 | Fracture | 2453.50 | 2495.00 | 0 |
2007-08-11 | Fracture | 1976.50 | 1977.00 | 0 |
2005-01-15 | Perforation | 3228.00 | 3235.50 | 17 |
2005-01-20 | Fracture | 3228.00 | 3235.50 | 0 |
2005-01-29 | Perforation | 2946.00 | 2950.00 | 17 |
2005-02-02 | Fracture | 2946.00 | 2950.00 | 0 |
2007-08-01 | Perforation | 3139.50 | 3140.00 | 7 |
2007-08-01 | Perforation | 3129.50 | 3130.00 | 7 |
For data sources see[5]