If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616052615003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.31315,"lon":-118.616161,"icon":""}]} |
Location: 00/15-26-061-05W6/3 | |
Location Alias: 00/15-26-61-05 W6M | |
Location Alias 2: 00/15-26-061-05 W6/03 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 05 | |
Section: 26 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG KAKWA 15-26-61-5 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0404943 | |
License Date: 2008-11-27 | |
License Status: Amended | |
Spud Date: 2009-07-08 | |
Final Drill Date: 2009-07-24 | |
Well Total Depth: 3444.00 m | |
Surface Hole Latitude: 54.313150 | |
Surface Hole Longitude: -118.616161 |
Date | Event |
---|---|
2008-11-27 | Obtained License |
2009-07-08 | Direction Drilling Operation Performed - Deviate |
2009-07-11 | Surface Casing Operation Performed |
2009-07-19 | Intermediate Casing Operation Performed |
2009-07-24 | Finished Drilling |
2009-07-24 | Well Mode changed to Drilled and Cased |
2009-07-25 | Well Log Performed |
2009-07-27 | Production Casing Operation Performed |
2009-07-27 | Rig Released |
2009-08-03 | Well Log Performed |
2009-10-01 | Well Log Performed |
2009-10-06 | Well Log Performed |
2009-10-08 | Perforation Treatment Performed - Jet Perforation |
2009-10-08 | Well Log Performed |
2009-10-21 | Perforation Treatment Performed - Fractured |
2009-10-22 | Perforation Treatment Performed - Jet Perforation |
2009-10-22 | Well Log Performed |
2009-10-26 | Perforation Treatment Performed - Fractured |
2009-10-26 | Perforation Treatment Performed - Jet Perforation |
2009-10-26 | Well Log Performed |
2009-10-27 | Perforation Treatment Performed - Fractured |
2009-10-27 | Perforation Treatment Performed - Jet Perforation |
2009-10-27 | Well Log Performed |
2009-10-28 | Perforation Treatment Performed - Fractured |
2009-10-29 | Well Log Performed |
2009-10-30 | Perforation Treatment Performed - Fractured |
2009-10-30 | Perforation Treatment Performed - Jet Perforation |
2009-10-30 | Well Log Performed |
2009-10-31 | Perforation Treatment Performed - Fractured |
2009-10-31 | Well Log Performed |
2009-11-01 | Perforation Treatment Performed - Jet Perforation |
2009-11-01 | Well Log Performed |
2009-11-04 | Perforation Treatment Performed - Fractured |
2009-11-04 | Perforation Treatment Performed - Jet Perforation |
2009-11-18 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-07-08 | 140.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2009-10-08 | Perforation | 3332.00 | 3333.00 | 10 |
2009-10-26 | Fracture | 3229.50 | 3230.50 | 0 |
2009-10-26 | Fracture | 3208.00 | 3218.50 | 0 |
2009-10-27 | Perforation | 3119.00 | 3121.00 | 10 |
2009-10-27 | Perforation | 3109.50 | 3110.50 | 10 |
2009-10-27 | Perforation | 3132.50 | 3133.00 | 10 |
2009-10-27 | Fracture | 3154.50 | 3196.00 | 0 |
2009-10-27 | Perforation | 3137.00 | 3137.50 | 10 |
2009-10-28 | Fracture | 3109.50 | 3137.50 | 0 |
2009-10-30 | Fracture | 3031.50 | 3032.50 | 0 |
2009-10-30 | Perforation | 2982.50 | 2984.50 | 10 |
2009-10-08 | Perforation | 3337.50 | 3339.50 | 10 |
2009-10-30 | Perforation | 2974.00 | 2976.00 | 10 |
2009-10-30 | Perforation | 3031.50 | 3032.50 | 10 |
2009-10-30 | Perforation | 3078.50 | 3080.00 | 10 |
2009-10-30 | Perforation | 3054.00 | 3055.50 | 10 |
2009-10-30 | Fracture | 3054.00 | 3080.00 | 0 |
2009-10-31 | Fracture | 2974.00 | 2984.50 | 0 |
2009-11-01 | Perforation | 2777.00 | 2778.00 | 10 |
2009-11-04 | Perforation | 2736.50 | 2737.00 | 10 |
2009-11-04 | Fracture | 2736.50 | 2778.00 | 0 |
2009-11-04 | Perforation | 2742.50 | 2743.50 | 10 |
2009-10-21 | Fracture | 3332.00 | 3339.50 | 0 |
2009-11-04 | Perforation | 2760.50 | 2761.00 | 10 |
2009-11-04 | Perforation | 2757.00 | 2758.00 | 10 |
2009-10-22 | Perforation | 3217.00 | 3218.50 | 10 |
2009-10-22 | Perforation | 3208.00 | 3209.50 | 10 |
2009-10-22 | Perforation | 3229.50 | 3230.50 | 10 |
2009-10-26 | Perforation | 3174.50 | 3175.50 | 10 |
2009-10-26 | Perforation | 3154.50 | 3155.50 | 10 |
2009-10-26 | Perforation | 3194.00 | 3196.00 | 10 |
For data sources see[5]