If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616052613005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.318524,"lon":-118.64513,"icon":""}]} |
| Location: 00/13-26-061-05W6/5 | |
| Location Alias: 00/13-26-61-05 W6M | |
| Location Alias 2: 00/13-26-061-05 W6/05 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 26 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ECA ECOG CHIME 13-26-61-5 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0352290 | |
| License Date: 2006-02-17 | |
| License Status: Issued | |
| Spud Date: 2006-03-18 | |
| Final Drill Date: 2006-04-22 | |
| Well Total Depth: 3352.00 m | |
| Surface Hole Latitude: 54.318524 | |
| Surface Hole Longitude: -118.645130 |
| Date | Event |
|---|---|
| 2006-02-17 | Obtained License |
| 2006-03-18 | Direction Drilling Operation Performed - Deviate |
| 2006-03-22 | Surface Casing Operation Performed |
| 2006-04-08 | Well Log Performed |
| 2006-04-09 | Intermediate Casing Operation Performed |
| 2006-04-22 | Finished Drilling |
| 2006-04-22 | Well Mode changed to Drilled and Cased |
| 2006-04-24 | Well Log Performed |
| 2006-04-25 | Production Casing Operation Performed |
| 2006-04-26 | Rig Released |
| 2006-05-04 | Well Log Performed |
| 2006-05-06 | Perforation Treatment Performed - Jet Perforation |
| 2006-05-06 | Well Log Performed |
| 2006-05-09 | Perforation Treatment Performed - Fractured |
| 2006-05-12 | Well Log Performed |
| 2006-05-13 | Perforation Treatment Performed - Jet Perforation |
| 2006-05-13 | Well Log Performed |
| 2006-05-21 | Perforation Treatment Performed - Jet Perforation |
| 2006-05-21 | Well Log Performed |
| 2006-05-22 | Perforation Treatment Performed - Jet Perforation |
| 2006-05-23 | Perforation Treatment Performed - Fractured |
| 2006-05-25 | Perforation Treatment Performed - Jet Perforation |
| 2006-05-25 | Well Log Performed |
| 2006-05-29 | Perforation Treatment Performed - Fractured |
| 2006-05-30 | Perforation Treatment Performed - Jet Perforation |
| 2006-05-30 | Well Log Performed |
| 2006-05-31 | Perforation Treatment Performed - Fractured |
| 2006-06-04 | Perforation Treatment Performed - Jet Perforation |
| 2006-06-04 | Well Fluid changed to Gas |
| 2006-06-04 | Well Log Performed |
| 2006-06-04 | Well Mode changed to Testing |
| 2006-06-05 | Perforation Treatment Performed - Fractured |
| 2006-06-15 | Well Log Performed |
| 2006-06-16 | Well Log Performed |
| 2006-09-06 | Well Structure changed to Commingled |
| 2009-01-27 | Well Log Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2006-03-18 | 570.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-05-06 | Perforation | 3307.00 | 3312.00 | 17 |
| 2006-05-25 | Perforation | 2970.00 | 2972.00 | 17 |
| 2006-05-29 | Fracture | 2970.00 | 2983.00 | 0 |
| 2006-05-30 | Perforation | 2630.50 | 2634.00 | 17 |
| 2006-05-31 | Fracture | 2630.50 | 2634.00 | 0 |
| 2006-06-04 | Perforation | 2610.00 | 2612.00 | 17 |
| 2006-06-04 | Perforation | 2593.00 | 2595.00 | 17 |
| 2006-06-05 | Fracture | 2593.00 | 2612.00 | 0 |
| 2006-05-09 | Fracture | 3307.00 | 3312.00 | 0 |
| 2006-05-13 | Perforation | 3109.00 | 3111.00 | 17 |
| 2006-05-21 | Perforation | 3100.00 | 3102.00 | 17 |
| 2006-05-21 | Perforation | 3092.00 | 3094.00 | 17 |
| 2006-05-22 | Perforation | 3087.00 | 3089.00 | 17 |
| 2006-05-23 | Fracture | 3087.00 | 3111.00 | 0 |
| 2006-05-25 | Perforation | 2981.00 | 2983.00 | 17 |
| 2006-05-25 | Perforation | 2975.00 | 2977.00 | 17 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 2 | 0.0 | 0.0 | 0.0 |
For data sources see[6]