If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616052601023 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.3015,"lon":-118.611348,"icon":""}]} |
| Location: 02/01-26-061-05W6/3 | |
| Location Alias: 02/01-26-61-05 W6M | |
| Location Alias 2: 02/01-26-061-05 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 26 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ECA ECOG KAKWA 1-26-61-5 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0407349 | |
| License Date: 2009-01-06 | |
| License Status: Amended | |
| Spud Date: 2009-05-20 | |
| Final Drill Date: 2009-06-07 | |
| Well Total Depth: 3399.00 m | |
| Surface Hole Latitude: 54.301500 | |
| Surface Hole Longitude: -118.611348 |
| Date | Event |
|---|---|
| 2009-01-06 | Obtained License |
| 2009-05-22 | Direction Drilling Operation Performed - Deviate |
| 2009-05-25 | Surface Casing Operation Performed |
| 2009-06-03 | Intermediate Casing Operation Performed |
| 2009-06-07 | Finished Drilling |
| 2009-06-07 | Well Mode changed to Drilled and Cased |
| 2009-06-08 | Well Log Performed |
| 2009-06-10 | Production Casing Operation Performed |
| 2009-06-10 | Rig Released |
| 2010-01-31 | Perforation Treatment Performed - Jet Perforation |
| 2010-01-31 | Well Log Performed |
| 2010-02-01 | Perforation Treatment Performed - Fractured |
| 2010-02-02 | Well Log Performed |
| 2010-02-03 | Perforation Treatment Performed - Fractured |
| 2010-02-03 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-04 | Well Log Performed |
| 2010-02-07 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-07 | Well Log Performed |
| 2010-02-08 | Perforation Treatment Performed - Fractured |
| 2010-02-08 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-09 | Perforation Treatment Performed - Fractured |
| 2010-02-10 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-12 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-12 | Well Log Performed |
| 2010-02-13 | Perforation Treatment Performed - Fractured |
| 2010-02-27 | Well Structure changed to Commingled |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2009-05-22 | 148.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2010-01-31 | Perforation | 3186.00 | 3187.00 | 10 |
| 2010-02-07 | Perforation | 3048.00 | 3050.00 | 10 |
| 2010-02-08 | Perforation | 2949.00 | 2950.00 | 10 |
| 2010-02-08 | Perforation | 2942.00 | 2944.00 | 10 |
| 2010-02-08 | Fracture | 3048.00 | 3050.00 | 0 |
| 2010-02-08 | Perforation | 2954.00 | 2955.00 | 10 |
| 2010-02-09 | Fracture | 2942.00 | 2955.00 | 0 |
| 2010-02-10 | Perforation | 2739.00 | 2740.00 | 10 |
| 2010-02-12 | Perforation | 2704.00 | 2705.00 | 10 |
| 2010-02-12 | Perforation | 2719.00 | 2720.00 | 10 |
| 2010-02-12 | Perforation | 2724.00 | 2724.50 | 10 |
| 2010-01-31 | Perforation | 3178.00 | 3180.00 | 10 |
| 2010-02-13 | Fracture | 2704.00 | 2740.00 | 0 |
| 2010-01-31 | Perforation | 3200.00 | 3201.00 | 10 |
| 2010-02-01 | Fracture | 3178.00 | 3187.00 | 0 |
| 2010-02-01 | Fracture | 3200.00 | 3201.00 | 0 |
| 2010-02-03 | Perforation | 3074.00 | 3075.00 | 10 |
| 2010-02-03 | Fracture | 3074.00 | 3102.00 | 0 |
| 2010-02-03 | Perforation | 3101.00 | 3102.00 | 10 |
| 2010-02-03 | Perforation | 3090.50 | 3092.50 | 10 |
For data sources see[5]