X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616052512000

Well Details

Well ID: 0616052512000
Loading map...
Location: 00/12-25-061-05W6/0
Location Alias: 00/12-25-61-05 W6M
Location Alias 2: 00/12-25-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG KAKWA 12-25-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0404903
License Date: 2008-11-27
License Status: Amended
Spud Date: 2009-05-25
Final Drill Date: 2009-06-11
Well Total Depth: 3279.00 m
Surface Hole Latitude: 54.312923
Surface Hole Longitude: -118.616038

For data sources see[1][2]

Well History

Date Event
2008-11-27 Obtained License
2009-05-23 Surface Casing Operation Performed
2009-05-25 Direction Drilling Operation Performed - Deviate
2009-06-05 Intermediate Casing Operation Performed
2009-06-11 Finished Drilling
2009-06-11 Well Mode changed to Drilled and Cased
2009-06-13 Production Casing Operation Performed
2009-06-13 Rig Released
2009-07-12 Well Log Performed
2009-07-15 Well Log Performed
2009-09-25 Perforation Treatment Performed - Jet Perforation
2009-09-25 Well Log Performed
2009-09-26 Perforation Treatment Performed - Fractured
2009-09-26 Well Log Performed
2009-09-27 Perforation Treatment Performed - Fractured
2009-09-27 Perforation Treatment Performed - Jet Perforation
2009-09-27 Well Log Performed
2009-09-28 Perforation Treatment Performed - Fractured
2009-09-28 Perforation Treatment Performed - Jet Perforation
2009-09-28 Well Log Performed
2009-09-29 Perforation Treatment Performed - Fractured
2009-09-29 Perforation Treatment Performed - Jet Perforation
2009-09-29 Well Log Performed
2009-09-30 Perforation Treatment Performed - Fractured
2009-09-30 Perforation Treatment Performed - Jet Perforation
2009-09-30 Well Log Performed
2009-10-01 Perforation Treatment Performed - Fractured
2009-10-01 Perforation Treatment Performed - Jet Perforation
2009-10-01 Well Log Performed
2009-10-02 Perforation Treatment Performed - Fractured
2009-10-02 Perforation Treatment Performed - Jet Perforation
2009-10-02 Well Log Performed
2009-10-03 Perforation Treatment Performed - Fractured
2009-10-04 Well Fluid changed to Gas
2009-10-04 Well Mode changed to Testing
2009-10-06 Well Log Performed
2009-10-11 Well Began Production
2009-10-11 Well Fluid changed to Gas
2009-10-11 Well Mode changed to Flowing
2010-09-25 Well Log Performed
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2009-05-25 142.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-09-25 Perforation 3246.50 3248.50 20
2009-09-27 Perforation 3067.00 3068.00 10
2009-09-27 Perforation 3059.00 3061.00 10
2009-09-28 Perforation 2971.00 2972.00 10
2009-09-28 Perforation 2984.00 2985.00 10
2009-09-28 Perforation 2962.00 2963.00 10
2009-09-28 Fracture 2996.00 3046.00 0
2009-09-28 Perforation 2953.00 2954.00 10
2009-09-29 Perforation 2886.00 2887.00 20
2009-09-29 Perforation 2901.00 2903.00 20
2009-09-29 Fracture 2953.00 2985.00 0
2009-09-26 Fracture 3246.50 3248.50 0
2009-09-30 Perforation 2835.00 2836.00 10
2009-09-30 Perforation 2842.00 2843.00 10
2009-09-30 Perforation 2825.00 2827.00 10
2009-09-30 Fracture 2901.00 2903.00 0
2009-09-30 Fracture 2886.00 2887.00 0
2009-10-01 Perforation 2607.00 2607.50 10
2009-10-01 Perforation 2611.50 2612.00 10
2009-10-01 Perforation 2617.50 2618.00 10
2009-10-01 Fracture 2825.00 2843.00 0
2009-10-01 Perforation 2587.50 2588.00 10
2009-09-27 Perforation 3003.00 3004.00 10
2009-10-01 Perforation 2592.50 2593.50 10
2009-10-02 Perforation 2135.00 2136.00 10
2009-10-02 Perforation 2140.00 2141.00 10
2009-10-02 Fracture 2587.50 2618.00 0
2009-10-02 Perforation 2127.00 2129.00 10
2009-10-03 Fracture 2127.00 2141.00 0
2009-09-27 Perforation 2996.00 2997.00 10
2009-09-27 Perforation 3045.00 3046.00 10
2009-09-27 Perforation 3019.00 3020.00 10
2009-09-27 Fracture 3059.00 3068.00 0
2009-09-27 Fracture 3081.00 3082.00 0
2009-09-27 Perforation 3081.00 3082.00 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 748 0.0 0.0 0.0
2010 8473 0.0 0.0 0.0
2011 7505 0.0 0.0 0.0
2012 8181 0.0 0.0 0.0
2013 8543 0.0 0.0 0.0
2014 8471 0.0 0.0 0.0
2015 8627 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 5493 0.0 0.0 0.0
2018 7935 0.0 0.0 0.0
2019 8365 0.0 0.0 0.0
2020 2040 0.0 0.0 0.0

For data sources see[6]

References