X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616052511002

Well Details

Well ID: 0616052511002
Loading map...
Location: 00/11-25-061-05W6/2
Location Alias: 00/11-25-61-05 W6M
Location Alias 2: 00/11-25-061-05 W6/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG KAKWA 11-25-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0392332
License Date: 2008-01-18
License Status: Issued
Spud Date: 2008-03-10
Final Drill Date: 2008-03-29
Well Total Depth: 3282.00 m
Surface Hole Latitude: 54.312733
Surface Hole Longitude: -118.615694

For data sources see[1][2]

Well History

Date Event
2008-01-18 Obtained License
2008-03-11 Direction Drilling Operation Performed - Deviate
2008-03-14 Surface Casing Operation Performed
2008-03-22 Intermediate Casing Operation Performed
2008-03-28 Well Log Performed
2008-03-29 Finished Drilling
2008-03-29 Well Log Performed
2008-03-29 Well Mode changed to Drilled and Cased
2008-03-31 Production Casing Operation Performed
2008-03-31 Rig Released
2008-04-04 Perforation Treatment Performed - Jet Perforation
2008-04-04 Well Log Performed
2008-04-05 Perforation Treatment Performed - Fractured
2008-04-05 Perforation Treatment Performed - Jet Perforation
2008-04-05 Well Log Performed
2008-04-06 Perforation Treatment Performed - Fractured
2008-04-06 Perforation Treatment Performed - Jet Perforation
2008-04-06 Well Log Performed
2008-04-07 Perforation Treatment Performed - Fractured
2008-04-07 Perforation Treatment Performed - Jet Perforation
2008-04-07 Well Log Performed
2008-04-08 Perforation Treatment Performed - Fractured
2008-04-10 Perforation Treatment Performed - Jet Perforation
2008-04-10 Well Log Performed
2008-04-11 Perforation Treatment Performed - Fractured
2008-04-19 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-03-11 150.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-04-04 Perforation 3069.50 3070.00 10
2008-04-05 Perforation 2963.50 2964.00 10
2008-04-05 Perforation 2959.00 2959.50 10
2008-04-05 Perforation 2949.00 2949.50 10
2008-04-06 Fracture 2949.00 2966.00 0
2008-04-06 Perforation 2832.50 2833.00 10
2008-04-06 Perforation 2825.50 2826.00 10
2008-04-06 Perforation 2821.50 2822.00 10
2008-04-06 Perforation 2819.00 2819.50 10
2008-04-07 Fracture 2819.00 2833.00 0
2008-04-07 Perforation 2624.00 2624.50 10
2008-04-04 Perforation 3063.00 3063.50 10
2008-04-07 Perforation 2623.00 2623.50 10
2008-04-07 Perforation 2616.50 2617.00 10
2008-04-07 Perforation 2612.50 2613.00 10
2008-04-07 Perforation 2609.50 2610.00 10
2008-04-07 Perforation 2604.00 2604.50 10
2008-04-08 Fracture 2604.00 2624.50 0
2008-04-10 Perforation 2591.50 2592.00 10
2008-04-10 Perforation 2590.50 2591.00 10
2008-04-11 Fracture 2590.50 2592.00 0
2008-04-04 Perforation 3058.00 3058.50 10
2008-04-05 Perforation 3043.00 3043.50 10
2008-04-05 Perforation 3040.00 3040.50 10
2008-04-05 Perforation 3035.50 3036.00 10
2008-04-05 Perforation 3017.50 3018.00 10
2008-04-05 Fracture 3017.50 3070.00 0
2008-04-05 Perforation 2965.50 2966.00 10

For data sources see[5]



References