X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616052507003

Well Details

Well ID: 0616052507003
Loading map...
Location: 00/07-25-061-05W6/3
Location Alias: 00/07-25-61-05 W6M
Location Alias 2: 00/07-25-061-05 W6/03
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 25
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG KAKWA 7-25-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0368893
License Date: 2006-12-14
License Status: Issued
Spud Date: 2007-01-23
Final Drill Date: 2007-02-13
Well Total Depth: 3179.00 m
Surface Hole Latitude: 54.301179
Surface Hole Longitude: -118.612086

For data sources see[1][2]

Well History

Date Event
2006-12-14 Obtained License
2007-01-30 Surface Casing Operation Performed
2007-02-01 Direction Drilling Operation Performed - Deviate
2007-02-06 Well Log Performed
2007-02-07 Intermediate Casing Operation Performed
2007-02-13 Finished Drilling
2007-02-13 Well Mode changed to Drilled and Cased
2007-02-14 Well Log Performed
2007-02-15 Production Casing Operation Performed
2007-02-16 Rig Released
2007-03-01 Well Log Performed
2007-03-03 Perforation Treatment Performed - Jet Perforation
2007-03-03 Well Log Performed
2007-03-04 Perforation Treatment Performed - Fractured
2007-03-06 Perforation Treatment Performed - Jet Perforation
2007-03-06 Well Log Performed
2007-03-07 Perforation Treatment Performed - Fractured
2007-03-09 Perforation Treatment Performed - Jet Perforation
2007-03-09 Well Log Performed
2007-03-10 Perforation Treatment Performed - Fractured
2007-03-11 Well Log Performed
2007-04-09 Perforation Treatment Performed - Jet Perforation
2007-04-09 Well Log Performed
2007-04-12 Perforation Treatment Performed - Fractured
2007-04-18 Well Log Performed
2007-04-27 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-02-01 561.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-03-03 Perforation 2922.50 2923.50 10
2007-03-09 Perforation 2447.00 2448.00 10
2007-03-10 Fracture 2482.00 2483.00 0
2007-03-10 Fracture 2447.00 2448.00 0
2007-04-09 Perforation 1985.50 1987.50 10
2007-04-12 Fracture 1985.50 1987.50 0
2007-03-03 Perforation 2915.50 2916.00 10
2007-03-04 Fracture 2915.50 2923.50 0
2007-03-06 Perforation 2819.50 2820.50 10
2007-03-06 Perforation 2809.00 2809.50 10
2007-03-06 Perforation 2746.00 2746.50 10
2007-03-07 Fracture 2809.00 2820.50 0
2007-03-07 Fracture 2746.00 2746.50 0
2007-03-09 Perforation 2482.00 2483.00 10

For data sources see[5]



References