If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616052503009 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.301249,"lon":-118.611894,"icon":""}]} |
Location: 00/03-25-061-05W6/9 | |
Location Alias: 00/03-25-61-05 W6M | |
Location Alias 2: 00/03-25-061-05 W6/09 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 05 | |
Section: 25 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG KAKWA 3-25-61-5 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0388899 | |
License Date: 2007-12-18 | |
License Status: Issued | |
Spud Date: 2008-05-29 | |
Final Drill Date: 2008-06-14 | |
Well Total Depth: 3157.00 m | |
Surface Hole Latitude: 54.301249 | |
Surface Hole Longitude: -118.611894 |
Date | Event |
---|---|
2007-12-18 | Obtained License |
2008-05-30 | Direction Drilling Operation Performed - Deviate |
2008-06-02 | Surface Casing Operation Performed |
2008-06-07 | Intermediate Casing Operation Performed |
2008-06-14 | Finished Drilling |
2008-06-14 | Well Mode changed to Drilled and Cased |
2008-06-15 | Well Log Performed |
2008-06-16 | Production Casing Operation Performed |
2008-06-16 | Rig Released |
2008-06-28 | Well Log Performed |
2008-07-24 | Perforation Treatment Performed - Jet Perforation |
2008-07-24 | Well Log Performed |
2008-07-25 | Perforation Treatment Performed - Fractured |
2008-07-26 | Perforation Treatment Performed - Fractured |
2008-07-26 | Perforation Treatment Performed - Jet Perforation |
2008-07-26 | Well Log Performed |
2008-07-27 | Perforation Treatment Performed - Jet Perforation |
2008-07-27 | Well Log Performed |
2008-07-28 | Perforation Treatment Performed - Fractured |
2008-07-29 | Perforation Treatment Performed - Fractured |
2008-07-29 | Perforation Treatment Performed - Jet Perforation |
2008-07-29 | Well Log Performed |
2008-07-30 | Perforation Treatment Performed - Fractured |
2008-07-30 | Perforation Treatment Performed - Jet Perforation |
2008-07-30 | Well Log Performed |
2008-07-31 | Perforation Treatment Performed - Fractured |
2008-07-31 | Perforation Treatment Performed - Jet Perforation |
2008-07-31 | Well Log Performed |
2008-08-01 | Perforation Treatment Performed - Fractured |
2008-08-01 | Perforation Treatment Performed - Jet Perforation |
2008-08-02 | Perforation Treatment Performed - Jet Perforation |
2008-08-02 | Well Log Performed |
2008-08-04 | Perforation Treatment Performed - Fractured |
2008-08-17 | Well Fluid changed to Gas |
2008-08-17 | Well Mode changed to Testing |
2008-08-18 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-05-30 | 180.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-07-24 | Perforation | 3040.00 | 3042.00 | 10 |
2008-07-26 | Fracture | 2856.00 | 2857.00 | 0 |
2008-07-27 | Perforation | 2823.00 | 2823.50 | 10 |
2008-07-27 | Perforation | 2821.00 | 2821.50 | 10 |
2008-07-27 | Perforation | 2819.00 | 2819.50 | 10 |
2008-07-27 | Perforation | 2815.00 | 2815.50 | 10 |
2008-07-27 | Perforation | 2807.00 | 2807.50 | 10 |
2008-07-28 | Fracture | 2807.00 | 2823.50 | 0 |
2008-07-29 | Perforation | 2741.00 | 2742.50 | 10 |
2008-07-29 | Fracture | 2741.00 | 2742.50 | 0 |
2008-07-30 | Perforation | 2696.50 | 2697.00 | 10 |
2008-07-25 | Fracture | 3040.00 | 3042.00 | 0 |
2008-07-30 | Perforation | 2690.50 | 2691.00 | 10 |
2008-07-30 | Perforation | 2686.50 | 2687.00 | 10 |
2008-07-30 | Perforation | 2683.50 | 2684.00 | 10 |
2008-07-30 | Perforation | 2680.00 | 2680.50 | 10 |
2008-07-30 | Perforation | 2677.00 | 2677.50 | 10 |
2008-07-30 | Perforation | 2674.50 | 2675.00 | 10 |
2008-07-30 | Fracture | 2674.50 | 2697.00 | 0 |
2008-07-31 | Perforation | 2480.50 | 2481.00 | 10 |
2008-07-31 | Perforation | 2478.50 | 2479.00 | 10 |
2008-07-31 | Perforation | 2473.00 | 2473.50 | 10 |
2008-07-26 | Perforation | 2932.50 | 2933.00 | 10 |
2008-07-31 | Fracture | 2473.00 | 2481.00 | 0 |
2008-08-01 | Perforation | 2471.00 | 2471.50 | 10 |
2008-08-01 | Perforation | 2466.50 | 2467.00 | 10 |
2008-08-01 | Perforation | 2463.00 | 2463.50 | 10 |
2008-08-01 | Perforation | 2458.50 | 2459.00 | 10 |
2008-08-01 | Fracture | 2458.50 | 2471.50 | 0 |
2008-08-02 | Perforation | 2444.00 | 2445.00 | 10 |
2008-08-04 | Fracture | 2444.00 | 2445.00 | 0 |
2008-07-26 | Fracture | 2932.50 | 2933.00 | 0 |
2008-07-26 | Perforation | 2920.00 | 2921.00 | 10 |
2008-07-26 | Perforation | 2915.00 | 2915.50 | 10 |
2008-07-26 | Perforation | 2911.00 | 2912.00 | 10 |
2008-07-26 | Fracture | 2911.00 | 2921.00 | 0 |
2008-07-26 | Perforation | 2856.00 | 2857.00 | 10 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 96 | 0.0 | 0.0 | 0.0 |
For data sources see[6]