If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616052112005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.290165,"lon":-118.706999,"icon":""}]} |
Location: 00/12-21-061-05W6/5 | |
Location Alias: 00/12-21-61-05 W6M | |
Location Alias 2: 00/12-21-061-05 W6/05 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 05 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG CHIME 12-21-61-5 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0408849 | |
License Date: 2009-01-30 | |
License Status: Issued | |
Spud Date: 2009-10-02 | |
Final Drill Date: 2009-10-21 | |
Well Total Depth: 3511.00 m | |
Surface Hole Latitude: 54.290165 | |
Surface Hole Longitude: -118.706999 |
Date | Event |
---|---|
2009-01-30 | Obtained License |
2009-10-02 | Lost Circulation Occurred |
2009-10-03 | Direction Drilling Operation Performed - Deviate |
2009-10-08 | Surface Casing Operation Performed |
2009-10-15 | Intermediate Casing Operation Performed |
2009-10-21 | Finished Drilling |
2009-10-21 | Well Mode changed to Drilled and Cased |
2009-10-22 | Well Log Performed |
2009-10-23 | Production Casing Operation Performed |
2009-10-23 | Rig Released |
2010-03-15 | Perforation Treatment Performed - Jet Perforation |
2010-03-15 | Well Log Performed |
2010-03-23 | Perforation Treatment Performed - Fractured |
2010-03-25 | Well Log Performed |
2010-03-26 | Perforation Treatment Performed - Fractured |
2010-03-26 | Perforation Treatment Performed - Jet Perforation |
2010-03-27 | Perforation Treatment Performed - Jet Perforation |
2010-03-27 | Well Log Performed |
2010-03-28 | Perforation Treatment Performed - Fractured |
2010-03-28 | Perforation Treatment Performed - Jet Perforation |
2010-03-28 | Well Log Performed |
2010-03-29 | Perforation Treatment Performed - Fractured |
2010-03-29 | Well Log Performed |
2010-03-30 | Perforation Treatment Performed - Fractured |
2010-03-30 | Perforation Treatment Performed - Jet Perforation |
2010-03-30 | Well Log Performed |
2010-03-31 | Perforation Treatment Performed - Fractured |
2010-04-07 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-10-03 | 140.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-03-15 | Perforation | 3275.50 | 3277.00 | 10 |
2010-03-27 | Perforation | 3020.50 | 3021.00 | 10 |
2010-03-27 | Perforation | 3025.00 | 3026.50 | 10 |
2010-03-27 | Perforation | 3038.00 | 3039.00 | 10 |
2010-03-28 | Perforation | 2811.50 | 2812.50 | 10 |
2010-03-28 | Perforation | 2807.50 | 2808.00 | 10 |
2010-03-28 | Perforation | 2801.00 | 2802.50 | 10 |
2010-03-28 | Fracture | 3025.00 | 3039.00 | 0 |
2010-03-28 | Fracture | 3020.50 | 3021.00 | 0 |
2010-03-28 | Perforation | 2817.00 | 2817.50 | 10 |
2010-03-29 | Fracture | 2801.00 | 2817.50 | 0 |
2010-03-15 | Perforation | 3264.00 | 3266.00 | 10 |
2010-03-30 | Fracture | 2771.50 | 2786.50 | 0 |
2010-03-30 | Perforation | 2301.00 | 2304.00 | 10 |
2010-03-30 | Perforation | 2281.00 | 2282.00 | 10 |
2010-03-30 | Perforation | 2784.50 | 2786.50 | 10 |
2010-03-30 | Perforation | 2776.50 | 2777.50 | 10 |
2010-03-30 | Perforation | 2771.50 | 2772.00 | 10 |
2010-03-31 | Fracture | 2281.00 | 2304.00 | 0 |
2010-03-15 | Perforation | 3286.00 | 3286.50 | 10 |
2010-03-23 | Fracture | 3264.00 | 3277.00 | 0 |
2010-03-23 | Fracture | 3286.00 | 3286.50 | 0 |
2010-03-26 | Perforation | 3148.00 | 3149.50 | 10 |
2010-03-26 | Fracture | 3148.00 | 3162.00 | 0 |
2010-03-26 | Perforation | 3161.50 | 3162.00 | 10 |
2010-03-26 | Perforation | 3156.50 | 3158.00 | 10 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2009-10-02 | Lost Circulation | 61.00 | 190.00 |
For data sources see[6]