If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616052110003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.292281,"lon":-118.687307,"icon":""}]} |
| Location: 00/10-21-061-05W6/3 | |
| Location Alias: 00/10-21-61-05 W6M | |
| Location Alias 2: 00/10-21-061-05 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 05 | |
| Section: 21 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ECA CHIME 10-21-61-5 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0338009 | |
| License Date: 2005-09-12 | |
| License Status: Amended | |
| Spud Date: 2005-12-29 | |
| Final Drill Date: 2006-02-06 | |
| Well Total Depth: 3208.00 m | |
| Surface Hole Latitude: 54.292281 | |
| Surface Hole Longitude: -118.687307 |
| Date | Event |
|---|---|
| 2005-09-12 | Obtained License |
| 2006-01-03 | Surface Casing Operation Performed |
| 2006-01-21 | Well Log Performed |
| 2006-01-22 | Intermediate Casing Operation Performed |
| 2006-02-06 | Finished Drilling |
| 2006-02-06 | Well Mode changed to Drilled and Cased |
| 2006-02-07 | Well Log Performed |
| 2006-02-08 | Production Casing Operation Performed |
| 2006-02-09 | Rig Released |
| 2006-02-19 | Well Log Performed |
| 2006-02-28 | Perforation Treatment Performed - Jet Perforation |
| 2006-02-28 | Well Log Performed |
| 2006-03-04 | Perforation Treatment Performed - Fractured |
| 2006-03-14 | Well Log Performed |
| 2006-03-16 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-16 | Well Log Performed |
| 2006-03-20 | Perforation Treatment Performed - Fractured |
| 2006-03-22 | Perforation Treatment Performed - Jet Perforation |
| 2006-03-22 | Well Log Performed |
| 2006-11-24 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-24 | Well Log Performed |
| 2006-11-26 | Perforation Treatment Performed - Fractured |
| 2006-11-26 | Well Fluid changed to Gas |
| 2006-11-26 | Well Mode changed to Testing |
| 2006-11-27 | Well Log Performed |
| 2006-11-29 | Perforation Treatment Performed - Jet Perforation |
| 2006-11-29 | Well Log Performed |
| 2006-11-30 | Perforation Treatment Performed - Fractured |
| 2006-12-07 | Well Log Performed |
| 2006-12-15 | Well Structure changed to Commingled |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-02-28 | Perforation | 3143.00 | 3145.50 | 17 |
| 2006-11-29 | Perforation | 2520.50 | 2521.00 | 17 |
| 2006-11-29 | Perforation | 2513.00 | 2514.00 | 17 |
| 2006-11-29 | Perforation | 2500.00 | 2500.50 | 17 |
| 2006-11-29 | Perforation | 2492.00 | 2493.00 | 17 |
| 2006-11-29 | Perforation | 2490.00 | 2491.00 | 17 |
| 2006-11-29 | Perforation | 2480.00 | 2480.50 | 17 |
| 2006-11-30 | Fracture | 2480.00 | 2521.00 | 0 |
| 2006-03-04 | Fracture | 3143.00 | 3145.50 | 0 |
| 2006-03-16 | Perforation | 2984.50 | 2986.50 | 17 |
| 2006-03-20 | Fracture | 2984.50 | 2986.50 | 0 |
| 2006-03-22 | Perforation | 2869.00 | 2871.00 | 17 |
| 2006-11-24 | Perforation | 2863.50 | 2864.50 | 17 |
| 2006-11-24 | Perforation | 2859.00 | 2860.50 | 17 |
| 2006-11-24 | Perforation | 2854.50 | 2855.50 | 17 |
| 2006-11-26 | Fracture | 2854.50 | 2871.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 13 | 0.0 | 0.0 | 0.0 |
For data sources see[5]