X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616052108005

Well Details

Well ID: 0616052108005
Loading map...
Location: 00/08-21-061-05W6/5
Location Alias: 00/08-21-61-05 W6M
Location Alias 2: 00/08-21-061-05 W6/05
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA CHIME 8-21-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0376365
License Date: 2007-04-09
License Status: Issued
Spud Date: 2007-06-02
Final Drill Date: 2007-06-26
Well Total Depth: 3377.00 m
Surface Hole Latitude: 54.292155
Surface Hole Longitude: -118.688088

For data sources see[1][2]

Well History

Date Event
2007-04-09 Obtained License
2007-06-02 Direction Drilling Operation Performed - Deviate
2007-06-05 Surface Casing Operation Performed
2007-06-14 Well Log Performed
2007-06-16 Intermediate Casing Operation Performed
2007-06-26 Finished Drilling
2007-06-26 Well Mode changed to Drilled and Cased
2007-06-27 Well Log Performed
2007-06-28 Production Casing Operation Performed
2007-06-28 Rig Released
2007-07-04 Well Log Performed
2007-07-05 Perforation Treatment Performed - Jet Perforation
2007-07-05 Well Log Performed
2007-07-06 Perforation Treatment Performed - Fractured
2007-07-07 Well Log Performed
2007-07-08 Perforation Treatment Performed - Jet Perforation
2007-07-08 Well Log Performed
2007-07-09 Perforation Treatment Performed - Fractured
2007-07-11 Perforation Treatment Performed - Jet Perforation
2007-07-11 Well Log Performed
2007-07-12 Perforation Treatment Performed - Fractured
2007-07-13 Perforation Treatment Performed - Jet Perforation
2007-07-14 Well Log Performed
2007-07-16 Perforation Treatment Performed - Fractured
2007-07-16 Well Fluid changed to Gas
2007-07-16 Well Mode changed to Testing
2007-07-18 Perforation Treatment Performed - Fractured
2007-07-18 Perforation Treatment Performed - Jet Perforation
2007-07-18 Well Log Performed
2007-07-19 Well Log Performed
2007-07-20 Perforation Treatment Performed - Jet Perforation
2007-07-20 Well Log Performed
2007-07-21 Perforation Treatment Performed - Fractured
2007-07-26 Well Log Performed
2007-08-02 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2007-06-02 150.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-07-05 Perforation 3319.00 3319.50 10
2007-07-08 Perforation 3147.00 3148.00 10
2007-07-08 Perforation 3141.00 3141.50 10
2007-07-08 Perforation 3114.00 3114.50 10
2007-07-09 Fracture 3163.50 3173.00 0
2007-07-11 Perforation 3043.50 3044.00 10
2007-07-11 Perforation 3038.50 3039.00 10
2007-07-11 Perforation 3033.00 3033.50 10
2007-07-11 Perforation 2961.80 2962.30 10
2007-07-12 Fracture 3033.00 3157.00 0
2007-07-12 Fracture 2961.80 2962.30 0
2007-07-05 Perforation 3314.50 3315.00 10
2007-07-13 Perforation 2906.50 2941.50 10
2007-07-13 Perforation 2901.50 2902.00 10
2007-07-13 Perforation 2897.50 2898.00 10
2007-07-13 Perforation 2894.50 2895.00 10
2007-07-16 Fracture 2894.50 2941.50 0
2007-07-18 Perforation 2894.50 2895.00 10
2007-07-18 Perforation 2897.50 2898.00 10
2007-07-18 Perforation 2901.50 2902.00 10
2007-07-18 Perforation 2906.50 2907.00 10
2007-07-18 Fracture 2894.50 2907.00 0
2007-07-05 Perforation 3293.00 3294.00 10
2007-07-20 Perforation 2694.00 2694.50 10
2007-07-20 Perforation 2688.50 2689.00 10
2007-07-20 Perforation 2685.00 2685.30 10
2007-07-20 Perforation 2679.00 2679.50 10
2007-07-20 Perforation 2675.00 2675.50 10
2007-07-20 Perforation 2659.00 2659.50 10
2007-07-20 Perforation 2180.00 2181.00 10
2007-07-20 Perforation 2175.00 2175.50 10
2007-07-20 Perforation 2157.50 2158.00 10
2007-07-21 Fracture 2659.00 2694.50 0
2007-07-05 Perforation 3272.00 3272.50 10
2007-07-21 Fracture 2157.50 2181.00 0
2007-07-05 Perforation 3267.50 3268.00 10
2007-07-06 Fracture 3267.50 3319.50 0
2007-07-08 Perforation 3172.50 3173.00 10
2007-07-08 Perforation 3163.50 3164.00 10
2007-07-08 Perforation 3156.50 3157.00 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 20 0.0 0.0 0.0

For data sources see[6]

References