If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616052106005 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.292114,"lon":-118.688602,"icon":""}]} |
Location: 00/06-21-061-05W6/5 | |
Location Alias: 00/06-21-61-05 W6M | |
Location Alias 2: 00/06-21-061-05 W6/05 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 05 | |
Section: 21 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: ECA ECOG CHIME 6-21-61-5 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0394395 | |
License Date: 2008-02-19 | |
License Status: Issued | |
Spud Date: 2008-03-23 | |
Final Drill Date: 2008-04-14 | |
Well Total Depth: 3279.00 m | |
Surface Hole Latitude: 54.292114 | |
Surface Hole Longitude: -118.688602 |
Date | Event |
---|---|
2008-02-19 | Obtained License |
2008-03-26 | Surface Casing Operation Performed |
2008-03-27 | Direction Drilling Operation Performed - Deviate |
2008-04-03 | Intermediate Casing Operation Performed |
2008-04-14 | Finished Drilling |
2008-04-14 | Well Mode changed to Drilled and Cased |
2008-04-15 | Well Log Performed |
2008-04-16 | Production Casing Operation Performed |
2008-04-16 | Rig Released |
2008-04-19 | Well Log Performed |
2008-04-20 | Perforation Treatment Performed - Jet Perforation |
2008-04-20 | Well Log Performed |
2008-04-21 | Perforation Treatment Performed - Fractured |
2008-04-21 | Perforation Treatment Performed - Jet Perforation |
2008-04-21 | Well Log Performed |
2008-04-22 | Perforation Treatment Performed - Fractured |
2008-04-22 | Perforation Treatment Performed - Jet Perforation |
2008-04-22 | Well Log Performed |
2008-04-25 | Perforation Treatment Performed - Fractured |
2008-04-25 | Perforation Treatment Performed - Jet Perforation |
2008-04-25 | Well Log Performed |
2008-04-26 | Perforation Treatment Performed - Fractured |
2008-04-26 | Perforation Treatment Performed - Jet Perforation |
2008-04-26 | Well Log Performed |
2008-05-01 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-03-27 | 622.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-04-20 | Perforation | 3260.40 | 3261.40 | 10 |
2008-04-21 | Perforation | 3028.50 | 3029.00 | 10 |
2008-04-21 | Perforation | 3009.50 | 3010.00 | 10 |
2008-04-21 | Perforation | 3002.50 | 3003.00 | 10 |
2008-04-22 | Fracture | 3059.50 | 3066.00 | 0 |
2008-04-22 | Fracture | 3002.50 | 3051.00 | 0 |
2008-04-22 | Perforation | 2952.50 | 2953.00 | 10 |
2008-04-22 | Perforation | 2948.00 | 2948.50 | 10 |
2008-04-22 | Perforation | 2939.00 | 2940.00 | 10 |
2008-04-22 | Perforation | 2935.50 | 2936.00 | 10 |
2008-04-22 | Perforation | 2929.50 | 2930.00 | 10 |
2008-04-20 | Perforation | 3133.50 | 3134.00 | 10 |
2008-04-25 | Fracture | 2929.50 | 2953.00 | 0 |
2008-04-25 | Perforation | 2803.50 | 2804.00 | 10 |
2008-04-25 | Perforation | 2796.00 | 2797.00 | 10 |
2008-04-25 | Perforation | 2793.00 | 2794.00 | 10 |
2008-04-25 | Fracture | 2793.00 | 2804.00 | 0 |
2008-04-26 | Perforation | 2595.00 | 2595.50 | 10 |
2008-04-26 | Perforation | 2590.50 | 2591.50 | 10 |
2008-04-26 | Perforation | 2577.00 | 2577.50 | 10 |
2008-04-26 | Perforation | 2573.00 | 2573.50 | 10 |
2008-04-26 | Perforation | 2560.00 | 2560.50 | 10 |
2008-04-21 | Fracture | 3260.40 | 3261.40 | 0 |
2008-04-26 | Perforation | 2556.00 | 2556.50 | 10 |
2008-04-26 | Perforation | 2550.50 | 2551.00 | 10 |
2008-04-26 | Fracture | 2550.50 | 2595.50 | 0 |
2008-04-26 | Perforation | 2077.00 | 2077.50 | 10 |
2008-04-26 | Perforation | 2074.50 | 2075.50 | 10 |
2008-04-26 | Fracture | 2074.50 | 2077.50 | 0 |
2008-04-21 | Fracture | 3133.50 | 3134.00 | 0 |
2008-04-21 | Perforation | 3065.50 | 3066.00 | 10 |
2008-04-21 | Perforation | 3059.50 | 3060.00 | 10 |
2008-04-21 | Perforation | 3050.50 | 3051.00 | 10 |
2008-04-21 | Perforation | 3041.00 | 3041.50 | 10 |
2008-04-21 | Perforation | 3039.00 | 3039.50 | 10 |
For data sources see[5]