X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616052106005

Well Details

Well ID: 0616052106005
Loading map...
Location: 00/06-21-061-05W6/5
Location Alias: 00/06-21-61-05 W6M
Location Alias 2: 00/06-21-061-05 W6/05
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG CHIME 6-21-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0394395
License Date: 2008-02-19
License Status: Issued
Spud Date: 2008-03-23
Final Drill Date: 2008-04-14
Well Total Depth: 3279.00 m
Surface Hole Latitude: 54.292114
Surface Hole Longitude: -118.688602

For data sources see[1][2]

Well History

Date Event
2008-02-19 Obtained License
2008-03-26 Surface Casing Operation Performed
2008-03-27 Direction Drilling Operation Performed - Deviate
2008-04-03 Intermediate Casing Operation Performed
2008-04-14 Finished Drilling
2008-04-14 Well Mode changed to Drilled and Cased
2008-04-15 Well Log Performed
2008-04-16 Production Casing Operation Performed
2008-04-16 Rig Released
2008-04-19 Well Log Performed
2008-04-20 Perforation Treatment Performed - Jet Perforation
2008-04-20 Well Log Performed
2008-04-21 Perforation Treatment Performed - Fractured
2008-04-21 Perforation Treatment Performed - Jet Perforation
2008-04-21 Well Log Performed
2008-04-22 Perforation Treatment Performed - Fractured
2008-04-22 Perforation Treatment Performed - Jet Perforation
2008-04-22 Well Log Performed
2008-04-25 Perforation Treatment Performed - Fractured
2008-04-25 Perforation Treatment Performed - Jet Perforation
2008-04-25 Well Log Performed
2008-04-26 Perforation Treatment Performed - Fractured
2008-04-26 Perforation Treatment Performed - Jet Perforation
2008-04-26 Well Log Performed
2008-05-01 Well Structure changed to Commingled

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-03-27 622.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-04-20 Perforation 3260.40 3261.40 10
2008-04-21 Perforation 3028.50 3029.00 10
2008-04-21 Perforation 3009.50 3010.00 10
2008-04-21 Perforation 3002.50 3003.00 10
2008-04-22 Fracture 3059.50 3066.00 0
2008-04-22 Fracture 3002.50 3051.00 0
2008-04-22 Perforation 2952.50 2953.00 10
2008-04-22 Perforation 2948.00 2948.50 10
2008-04-22 Perforation 2939.00 2940.00 10
2008-04-22 Perforation 2935.50 2936.00 10
2008-04-22 Perforation 2929.50 2930.00 10
2008-04-20 Perforation 3133.50 3134.00 10
2008-04-25 Fracture 2929.50 2953.00 0
2008-04-25 Perforation 2803.50 2804.00 10
2008-04-25 Perforation 2796.00 2797.00 10
2008-04-25 Perforation 2793.00 2794.00 10
2008-04-25 Fracture 2793.00 2804.00 0
2008-04-26 Perforation 2595.00 2595.50 10
2008-04-26 Perforation 2590.50 2591.50 10
2008-04-26 Perforation 2577.00 2577.50 10
2008-04-26 Perforation 2573.00 2573.50 10
2008-04-26 Perforation 2560.00 2560.50 10
2008-04-21 Fracture 3260.40 3261.40 0
2008-04-26 Perforation 2556.00 2556.50 10
2008-04-26 Perforation 2550.50 2551.00 10
2008-04-26 Fracture 2550.50 2595.50 0
2008-04-26 Perforation 2077.00 2077.50 10
2008-04-26 Perforation 2074.50 2075.50 10
2008-04-26 Fracture 2074.50 2077.50 0
2008-04-21 Fracture 3133.50 3134.00 0
2008-04-21 Perforation 3065.50 3066.00 10
2008-04-21 Perforation 3059.50 3060.00 10
2008-04-21 Perforation 3050.50 3051.00 10
2008-04-21 Perforation 3041.00 3041.50 10
2008-04-21 Perforation 3039.00 3039.50 10

For data sources see[5]



References