X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616051612000

Well Details

Well ID: 0616051612000
Loading map...
Location: 00/12-16-061-05W6/0
Location Alias: 00/12-16-61-05 W6M
Location Alias 2: 00/12-16-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA HZ KAKWA 12-16-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0454688
License Date: 2013-02-07
License Status: Issued
Spud Date: 2013-03-10
Final Drill Date: 2013-04-07
Well Total Depth: 5385.00 m
Surface Hole Latitude: 54.287385
Surface Hole Longitude: -118.726100

For data sources see[1][2]

Well History

Date Event
2013-02-07 Obtained License
2013-03-11 Surface Casing Operation Performed
2013-03-18 Direction Drilling Operation Performed - Deviate
2013-03-23 Intermediate Casing Operation Performed
2013-03-26 Direction Drilling Operation Performed - Horizontal
2013-04-07 Finished Drilling
2013-04-07 Well Log Performed
2013-04-07 Well Mode changed to Drilled and Cased
2013-04-12 Liner Casing Operation Performed
2013-04-12 Perforation Treatment Performed - Open-Hole Completion
2013-04-12 Well Log Performed
2013-04-13 Rig Released
2013-08-06 Well Log Performed
2013-08-13 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-14 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-15 Perforation Treatment Performed - Multi-Stage Fracture
2013-08-19 Perforation Treatment Performed - Jet Perforation
2013-08-19 Well Log Performed
2013-08-21 Well Began Production
2013-08-21 Well Fluid changed to Gas
2013-08-21 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-03-10 Ensign Drilling Inc. 133 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-03-18 2648.00 Deviate (5 - 79 degrees)
2013-03-26 3215.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-04-12 Open Hole/Barefoot Completion 5371.50 5385.00 0
2013-08-14 Multi-Stage Fracture 4198.60 4199.80 0
2013-08-14 Multi-Stage Fracture 4065.30 4066.50 0
2013-08-15 Multi-Stage Fracture 3918.20 3919.40 0
2013-08-15 Multi-Stage Fracture 3784.10 3785.30 0
2013-08-15 Multi-Stage Fracture 3648.50 3649.70 0
2013-08-15 Multi-Stage Fracture 3517.10 3518.30 0
2013-08-15 Multi-Stage Fracture 3369.10 3370.40 0
2013-08-15 Multi-Stage Fracture 3237.10 3238.30 0
2013-08-19 Perforation 2711.00 2712.00 13
2013-08-13 Multi-Stage Fracture 5292.70 5307.80 0
2013-08-13 Multi-Stage Fracture 5157.00 5158.20 0
2013-08-13 Multi-Stage Fracture 5023.00 5024.30 0
2013-08-13 Multi-Stage Fracture 4882.10 4883.30 0
2013-08-13 Multi-Stage Fracture 4741.40 4742.60 0
2013-08-13 Multi-Stage Fracture 4602.50 4603.80 0
2013-08-14 Multi-Stage Fracture 4468.40 4469.60 0
2013-08-14 Multi-Stage Fracture 4333.50 4334.70 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-13 2013-08-15 3,067 6,920 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.0548 N/A
100 Mesh Preferred Sands Crystalline Silica 14808-60-7 100 2.8973 N/A
40/70 Southwest Sands Crystalline Silica 14808-60-7 100 11.9982 N/A
ASPEN-FR-27 Aspen Polymers Friction Reducer Ethylene Glycol 107-21-1 100 0.0015 N/A
Non-Hazardous Not Available 100 0.0509 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-08-01 2013-08-01 Surface Water - Runoff 185
2013-08-10 2013-08-15 Surface Water - Runoff 7584

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 3126 0.0 0.0 0.0
2014 8281 0.0 0.0 0.0
2015 8682 0.0 0.0 0.0
2016 8592 0.0 0.0 0.0
2017 7275 0.0 0.0 0.0
2018 8195 0.0 0.0 0.0
2019 8538 0.0 0.0 0.0
2020 2140 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-04-13 No Incident Encountered 0.00 0.00
2013-08-21 No Incident Encountered 0.00 0.00

For data sources see[10]

References