X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616051511020

Well Details

Well ID: 0616051511020
Loading map...
Location: 02/11-15-061-05W6/0
Location Alias: 02/11-15-61-05 W6M
Location Alias 2: 02/11-15-061-05 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 05
Section: 15
County/Municipality: Municipal District of Greenview No. 16
Well Name: JUPITER 102 KAKWA 11-15-61-5
Operator Name: Jupiter Resources Inc.
License Number: 0394923
License Date: 2008-02-28
License Status: Issued
Spud Date: 2008-04-04
Final Drill Date: 2008-04-26
Well Total Depth: 3715.00 m
Surface Hole Latitude: 54.286120
Surface Hole Longitude: -118.655335

For data sources see[1][2]

Well History

Date Event
2008-02-28 Obtained License
2008-04-05 Direction Drilling Operation Performed - Deviate
2008-04-08 Surface Casing Operation Performed
2008-04-18 Intermediate Casing Operation Performed
2008-04-26 Finished Drilling
2008-04-26 Well Mode changed to Drilled and Cased
2008-04-27 Well Log Performed
2008-04-28 Production Casing Operation Performed
2008-04-28 Rig Released
2008-05-05 Well Log Performed
2008-05-07 Perforation Treatment Performed - Jet Perforation
2008-05-07 Well Log Performed
2008-05-08 Well Log Performed
2008-05-10 Perforation Treatment Performed - Fractured
2008-05-10 Perforation Treatment Performed - Jet Perforation
2008-05-11 Perforation Treatment Performed - Fractured
2008-05-11 Perforation Treatment Performed - Jet Perforation
2008-05-11 Well Log Performed
2008-05-12 Perforation Treatment Performed - Fractured
2008-05-12 Perforation Treatment Performed - Jet Perforation
2008-05-12 Well Log Performed
2008-05-13 Perforation Treatment Performed - Fractured
2008-05-13 Perforation Treatment Performed - Jet Perforation
2008-05-13 Well Log Performed
2008-05-14 Perforation Treatment Performed - Fractured
2008-05-14 Perforation Treatment Performed - Jet Perforation
2008-05-14 Well Log Performed
2008-05-15 Perforation Treatment Performed - Jet Perforation
2008-05-16 Perforation Treatment Performed - Fractured
2008-05-18 Well Fluid changed to Gas
2008-05-18 Well Mode changed to Testing
2008-05-25 Well Began Production
2008-05-25 Well Fluid changed to Gas
2008-05-25 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-04-05 150.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-05-07 Perforation 3692.00 3693.00 10
2008-05-11 Perforation 3483.00 3483.50 10
2008-05-11 Perforation 3477.00 3478.00 10
2008-05-11 Perforation 3470.00 3471.00 10
2008-05-11 Fracture 3470.00 3488.50 0
2008-05-12 Perforation 3410.00 3410.50 10
2008-05-12 Perforation 3395.50 3396.00 10
2008-05-12 Perforation 3385.00 3385.50 10
2008-05-12 Perforation 3349.50 3350.00 10
2008-05-12 Perforation 3337.50 3338.00 10
2008-05-12 Perforation 3322.50 3323.00 10
2008-05-07 Perforation 3690.50 3691.00 10
2008-05-12 Perforation 3318.50 3319.00 10
2008-05-12 Fracture 3318.50 3410.50 0
2008-05-13 Perforation 3293.00 3295.00 10
2008-05-13 Fracture 3293.00 3295.00 0
2008-05-13 Perforation 3251.50 3252.00 10
2008-05-13 Perforation 3246.00 3246.50 10
2008-05-14 Perforation 3243.50 3244.00 10
2008-05-14 Perforation 3238.00 3239.00 10
2008-05-14 Perforation 3234.50 3235.50 10
2008-05-14 Perforation 3231.00 3231.50 10
2008-05-07 Perforation 3683.50 3684.50 10
2008-05-14 Fracture 3231.00 3252.00 0
2008-05-14 Perforation 3040.00 3040.50 10
2008-05-15 Perforation 3038.50 3039.00 10
2008-05-15 Perforation 3033.50 3034.00 10
2008-05-15 Perforation 3030.50 3031.00 10
2008-05-15 Perforation 3018.50 3019.00 10
2008-05-15 Perforation 3014.50 3015.00 10
2008-05-15 Perforation 3000.50 3001.00 10
2008-05-15 Perforation 2995.00 2995.50 10
2008-05-15 Perforation 2532.00 2533.00 10
2008-05-07 Perforation 3637.50 3638.50 10
2008-05-15 Perforation 2527.00 2528.00 10
2008-05-15 Perforation 2504.50 2505.50 10
2008-05-16 Fracture 2995.00 3040.50 0
2008-05-16 Fracture 2504.50 2533.00 0
2008-05-07 Perforation 3562.00 3562.50 10
2008-05-10 Fracture 3690.50 3693.00 0
2008-05-10 Fracture 3637.50 3684.50 0
2008-05-10 Fracture 3562.00 3562.50 0
2008-05-10 Perforation 3487.50 3488.50 10

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 4563 0.0 0.0 0.0
2009 8011 0.0 0.0 0.0
2010 7038 0.0 0.0 0.0
2011 8413 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8496 0.0 0.0 0.0
2014 8592 0.0 0.0 0.0
2015 8650 0.0 0.0 0.0
2016 7041 0.0 0.0 0.0
2017 6222 0.0 0.0 0.0
2018 8033 0.0 0.0 0.0
2019 8494 0.0 0.0 0.0
2020 1932 0.0 0.0 0.0

For data sources see[6]

References