If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616051305000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.277603,"lon":-118.596822,"icon":""}]} |
Location: 00/05-13-061-05W6/0 | |
Location Alias: 00/05-13-61-05 W6M | |
Location Alias 2: 00/05-13-061-05 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 05 | |
Section: 13 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: TOURMALINE HZ KAKWA 5-13-61-5 | |
Operator Name: Tourmaline Oil Corp. | |
License Number: 0491754 | |
License Date: 2018-11-02 | |
License Status: Amended | |
Spud Date: 2019-07-05 | |
Final Drill Date: 2019-07-21 | |
Well Total Depth: 4513.00 m | |
Surface Hole Latitude: 54.277603 | |
Surface Hole Longitude: -118.596822 |
Date | Event |
---|---|
2018-11-02 | Obtained License |
2019-07-05 | Drill To LD |
2019-07-06 | Surface Casing Operation Performed |
2019-07-09 | Intermediate Casing Operation Performed |
2019-07-11 | Direction Drilling Operation Performed - Deviate |
2019-07-15 | Direction Drilling Operation Performed - Horizontal |
2019-07-16 | Well Log Performed |
2019-07-21 | Finished Drilling |
2019-07-21 | Well Log Performed |
2019-07-21 | Well Mode changed to Drilled and Cased |
2019-07-22 | Well Log Performed |
2019-07-23 | Production Casing Operation Performed |
2019-07-24 | Rig Released |
2019-10-04 | Well Log Performed |
2019-10-09 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2019-10-11 | Well Began Production |
2019-10-11 | Well Fluid changed to Gas |
2019-10-11 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2019-07-05 | Precision Drilling Corporation | 531 | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2019-07-11 | 1979.60 | Deviate (5 - 79 degrees) |
2019-07-15 | 3184.50 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2019-10-09 | Multi-Stage Fracture | 4481.40 | 4481.50 | 0 |
2019-10-09 | Multi-Stage Fracture | 4016.00 | 4016.10 | 0 |
2019-10-09 | Multi-Stage Fracture | 3963.10 | 3963.20 | 0 |
2019-10-09 | Multi-Stage Fracture | 3910.10 | 3910.20 | 0 |
2019-10-09 | Multi-Stage Fracture | 3857.20 | 3857.30 | 0 |
2019-10-10 | Multi-Stage Fracture | 3804.30 | 3804.40 | 0 |
2019-10-10 | Multi-Stage Fracture | 3751.30 | 3751.40 | 0 |
2019-10-10 | Multi-Stage Fracture | 3698.40 | 3698.50 | 0 |
2019-10-10 | Multi-Stage Fracture | 3645.50 | 3645.60 | 0 |
2019-10-10 | Multi-Stage Fracture | 3592.70 | 3592.80 | 0 |
2019-10-10 | Multi-Stage Fracture | 3539.80 | 3539.90 | 0 |
2019-10-09 | Multi-Stage Fracture | 4439.60 | 4439.70 | 0 |
2019-10-10 | Multi-Stage Fracture | 3486.80 | 3486.90 | 0 |
2019-10-10 | Multi-Stage Fracture | 3433.90 | 3434.00 | 0 |
2019-10-10 | Multi-Stage Fracture | 3381.00 | 3381.10 | 0 |
2019-10-10 | Multi-Stage Fracture | 3328.10 | 3328.20 | 0 |
2019-10-10 | Multi-Stage Fracture | 3275.60 | 3275.70 | 0 |
2019-10-09 | Multi-Stage Fracture | 4386.70 | 4386.80 | 0 |
2019-10-09 | Multi-Stage Fracture | 4333.70 | 4333.80 | 0 |
2019-10-09 | Multi-Stage Fracture | 4280.80 | 4280.90 | 0 |
2019-10-09 | Multi-Stage Fracture | 4227.80 | 4227.90 | 0 |
2019-10-09 | Multi-Stage Fracture | 4174.80 | 4174.90 | 0 |
2019-10-09 | Multi-Stage Fracture | 4121.90 | 4122.00 | 0 |
2019-10-09 | Multi-Stage Fracture | 4069.00 | 4069.10 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2019-10-09 | 2019-10-10 | 3,079 | 5,903 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 82.7807 | N/A | |||
Prime Plus 40/70 | Trican | hexamethylenetetramine | 100-97-0 | 100 | 3.3958 | N/A | ||
silica crystalline | 14808-60-7 | 100 | 3.3958 | N/A | ||||
Sand - Tier 1 40/70 | Trican | silica crystalline | 14808-60-7 | 100 | 11.9136 | N/A | ||
Sand - Tier 2 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 1.7259 | N/A | ||
Aqucar DB20 Biocide | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0094 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0094 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0094 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0094 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0094 | N/A | ||||
CC-7 Clay Stabilizer | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.0881 | N/A | |
water | Not Available | 100 | 0.0881 | N/A | ||||
FR-22 Concentrated Friction Reducer | Trican | Friction Reducer | distillates (petroleum). hydrotreated light naphthenic | 64742-53-6 | 100 | 0.046 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.046 | N/A | ||||
S-17X Surfactant | Trican | Surfactant | 1-hexanol. 2-ethyl-. manuf. of. by-products from. distn. residues |
68609-68-7 | 100 | 0.0401 | N/A | |
benzenesulfonic acid. dodecyl-. compd. with 2-aminoethanol | 26836-07-7 | 100 | 0.0401 | N/A | ||||
methanol | 67-56-1 | 100 | 0.0401 | N/A | ||||
methyloxirane polymer with oxirane | 11/6/9003 | 100 | 0.0401 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0401 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2019-10-09 | 2019-10-10 | Recycled Fracturing Water (treated at well site) | 3755 |
2019-10-09 | 2019-10-10 | Recycled Fracturing Water (treated at well site) | 2148 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2019 | 1795 | 0.0 | 0.0 | 0.0 |
2020 | 2179 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-07-21 | No Incident Encountered | 0.00 | 0.00 |
2019-10-24 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]