X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616043114000

Well Details

Well ID: 0616043114000
Loading map...
Location: 00/14-31-061-04W6/0
Location Alias: 00/14-31-61-04 W6M
Location Alias 2: 00/14-31-061-04 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 04
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG KAKWA 14-31-61-4
Operator Name: Jupiter Resources Inc.
License Number: 0394617
License Date: 2008-02-22
License Status: Issued
Spud Date: 2008-12-24
Final Drill Date: 2009-01-16
Well Total Depth: 3169.00 m
Surface Hole Latitude: 54.322746
Surface Hole Longitude: -118.587770

For data sources see[1][2]

Well History

Date Event
2008-02-22 Obtained License
2008-12-26 Direction Drilling Operation Performed - Deviate
2008-12-30 Surface Casing Operation Performed
2009-01-07 Well Log Performed
2009-01-08 Intermediate Casing Operation Performed
2009-01-16 Finished Drilling
2009-01-16 Well Mode changed to Drilled and Cased
2009-01-17 Well Log Performed
2009-01-18 Production Casing Operation Performed
2009-01-19 Rig Released
2009-01-23 Well Log Performed
2009-01-25 Well Log Performed
2009-01-26 Perforation Treatment Performed - Jet Perforation
2009-01-28 Well Log Performed
2009-01-30 Perforation Treatment Performed - Fractured
2009-01-31 Perforation Treatment Performed - Jet Perforation
2009-01-31 Well Log Performed
2009-02-01 Perforation Treatment Performed - Fractured
2009-02-01 Perforation Treatment Performed - Jet Perforation
2009-02-01 Well Log Performed
2009-02-02 Perforation Treatment Performed - Fractured
2009-02-03 Well Fluid changed to Gas
2009-02-03 Well Mode changed to Testing
2009-02-04 Well Log Performed
2009-02-05 Perforation Treatment Performed - Fractured
2009-02-05 Perforation Treatment Performed - Jet Perforation
2009-02-05 Well Log Performed
2009-02-06 Perforation Treatment Performed - Fractured
2009-02-06 Perforation Treatment Performed - Jet Perforation
2009-02-06 Well Log Performed
2009-02-07 Perforation Treatment Performed - Fractured
2009-02-07 Perforation Treatment Performed - Jet Perforation
2009-02-07 Well Log Performed
2009-02-08 Perforation Treatment Performed - Fractured
2009-02-13 Well Began Production
2009-02-13 Well Fluid changed to Gas
2009-02-13 Well Mode changed to Flowing
2014-10-01 Well Fluid changed to Gas
2014-10-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-12-26 90.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-01-26 Perforation 3027.50 3028.50 20
2009-02-01 Perforation 2941.50 2942.00 10
2009-02-01 Perforation 2939.00 2939.50 10
2009-02-02 Fracture 2852.00 2854.00 0
2009-02-05 Perforation 2707.50 2708.00 10
2009-02-05 Perforation 2710.00 2710.50 10
2009-02-05 Perforation 2695.00 2695.50 10
2009-02-05 Perforation 2701.00 2701.50 10
2009-02-05 Fracture 2772.00 2774.00 0
2009-02-05 Perforation 2772.00 2774.00 10
2009-02-05 Perforation 2715.50 2716.00 10
2009-01-30 Fracture 3027.50 3028.50 0
2009-02-05 Perforation 2723.00 2723.50 10
2009-02-06 Perforation 2485.00 2485.50 10
2009-02-06 Perforation 2489.00 2489.50 10
2009-02-06 Perforation 2464.50 2465.00 10
2009-02-06 Perforation 2469.50 2470.00 10
2009-02-06 Fracture 2695.00 2695.50 0
2009-02-06 Fracture 2701.00 2723.50 0
2009-02-06 Perforation 2505.00 2505.50 10
2009-02-06 Perforation 2507.50 2508.00 10
2009-02-07 Perforation 2022.00 2023.00 10
2009-01-31 Perforation 2944.50 2945.50 10
2009-02-07 Perforation 2018.00 2019.00 10
2009-02-07 Fracture 2464.50 2508.00 0
2009-02-07 Perforation 2032.50 2033.50 10
2009-02-08 Fracture 2018.00 2033.50 0
2009-01-31 Perforation 2959.50 2960.00 10
2009-02-01 Perforation 2897.00 2897.50 6
2009-02-01 Fracture 2897.00 2945.50 0
2009-02-01 Perforation 2852.00 2854.00 10
2009-02-01 Perforation 2906.50 2907.00 6
2009-02-01 Fracture 2959.00 2960.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 7332 0.0 0.0 0.0
2010 8609 0.0 0.0 0.0
2011 8171 0.0 0.0 0.0
2012 8483 0.0 0.0 0.0
2013 8602 0.0 0.0 0.0
2014 7725 0.0 0.0 0.0
2015 8461 0.0 0.0 0.0
2016 8712 0.0 0.0 0.0
2017 8137 0.0 0.0 0.0
2018 7320 0.0 0.0 0.0
2019 8206 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References