If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0616043113003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.322685,"lon":-118.587566,"icon":""}]} |
| Location: 00/13-31-061-04W6/3 | |
| Location Alias: 00/13-31-61-04 W6M | |
| Location Alias 2: 00/13-31-061-04 W6/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 6 | |
| Range: 04 | |
| Section: 31 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: ECA ECOG KAKWA 13-31-61-4 | |
| Operator Name: Jupiter Resources Inc. | |
| License Number: 0354005 | |
| License Date: 2006-03-14 | |
| License Status: Issued | |
| Spud Date: 2006-05-05 | |
| Final Drill Date: 2006-06-07 | |
| Well Total Depth: 3230.00 m | |
| Surface Hole Latitude: 54.322685 | |
| Surface Hole Longitude: -118.587566 |
| Date | Event |
|---|---|
| 2006-03-14 | Obtained License |
| 2006-05-05 | Direction Drilling Operation Performed - Deviate |
| 2006-05-07 | Surface Casing Operation Performed |
| 2006-05-26 | Well Log Performed |
| 2006-05-27 | Intermediate Casing Operation Performed |
| 2006-06-07 | Finished Drilling |
| 2006-06-07 | Well Log Performed |
| 2006-06-07 | Well Mode changed to Drilled and Cased |
| 2006-06-09 | Production Casing Operation Performed |
| 2006-06-10 | Rig Released |
| 2006-08-20 | Well Log Performed |
| 2006-08-22 | Perforation Treatment Performed - Jet Perforation |
| 2006-08-22 | Well Log Performed |
| 2006-08-23 | Perforation Treatment Performed - Fractured |
| 2006-08-27 | Perforation Treatment Performed - Jet Perforation |
| 2006-08-27 | Well Log Performed |
| 2006-08-28 | Perforation Treatment Performed - Fractured |
| 2006-08-29 | Well Log Performed |
| 2006-08-30 | Perforation Treatment Performed - Jet Perforation |
| 2006-08-30 | Well Fluid changed to Gas |
| 2006-08-30 | Well Log Performed |
| 2006-08-30 | Well Mode changed to Testing |
| 2006-08-31 | Perforation Treatment Performed - Fractured |
| 2006-09-01 | Perforation Treatment Performed - Jet Perforation |
| 2006-09-01 | Well Log Performed |
| 2006-09-02 | Perforation Treatment Performed - Fractured |
| 2006-09-10 | Perforation Treatment Performed - Jet Perforation |
| 2006-09-10 | Well Log Performed |
| 2006-09-11 | Perforation Treatment Performed - Fractured |
| 2006-09-12 | Well Log Performed |
| 2006-09-16 | Well Log Performed |
| 2006-09-25 | Well Structure changed to Commingled |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2006-05-05 | 162.50 | Deviate (5 - 79 degrees) |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2006-08-22 | Perforation | 3080.50 | 3082.00 | 17 |
| 2006-09-01 | Perforation | 2824.00 | 2826.00 | 17 |
| 2006-09-02 | Fracture | 2824.00 | 2826.00 | 0 |
| 2006-09-10 | Perforation | 2555.00 | 2556.00 | 17 |
| 2006-09-10 | Perforation | 2552.00 | 2553.00 | 17 |
| 2006-09-10 | Perforation | 2536.50 | 2538.00 | 17 |
| 2006-09-10 | Perforation | 2531.50 | 2532.50 | 17 |
| 2006-09-10 | Perforation | 2514.00 | 2515.00 | 17 |
| 2006-09-10 | Perforation | 2509.00 | 2510.00 | 17 |
| 2006-09-11 | Fracture | 2509.00 | 2556.00 | 0 |
| 2006-08-23 | Fracture | 3080.50 | 3082.00 | 0 |
| 2006-08-27 | Perforation | 2998.00 | 3001.00 | 17 |
| 2006-08-27 | Perforation | 2990.00 | 2992.00 | 17 |
| 2006-08-28 | Fracture | 2990.00 | 3001.00 | 0 |
| 2006-08-30 | Perforation | 2908.00 | 2913.50 | 17 |
| 2006-08-30 | Perforation | 2904.00 | 2906.00 | 17 |
| 2006-08-30 | Perforation | 2897.00 | 2902.00 | 17 |
| 2006-08-31 | Fracture | 2897.00 | 2913.50 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 9 | 0.0 | 0.0 | 0.0 |
For data sources see[6]