X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0616033413000

Well Details

Well ID: 0616033413000
Loading map...
Location: 00/13-34-061-03W6/0
Location Alias: 00/13-34-61-03 W6M
Location Alias 2: 00/13-34-061-03 W6/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 6
Range: 03
Section: 34
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH HZ KAKWA 13-34-61-3
Operator Name: Strath Resources Ltd.
License Number: 0448972
License Date: 2012-10-03
License Status: Issued
Spud Date: 2012-10-18
Final Drill Date: 2012-11-22
Well Total Depth: 4335.00 m
Surface Hole Latitude: 54.309485
Surface Hole Longitude: -118.370095

For data sources see[1][2]

Well History

Date Event
2012-10-03 Obtained License
2012-10-22 Surface Casing Operation Performed
2012-10-26 Direction Drilling Operation Performed - Horizontal
2012-11-13 Intermediate Casing Operation Performed
2012-11-22 Finished Drilling
2012-11-22 Well Log Performed
2012-11-22 Well Mode changed to Drilled and Cased
2012-11-26 Liner Casing Operation Performed
2012-11-28 Rig Released
2012-12-09 Well Log Performed
2012-12-10 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-11 Perforation Treatment Performed - Multi-Stage Fracture
2013-04-08 Well Began Production
2013-04-08 Well Fluid changed to Crude Oil
2013-04-08 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-18 Savanna Drilling Corp. 637 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-26 2270.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-12-10 Multi-Stage Fracture 4308.20 4309.50 0
2012-12-10 Multi-Stage Fracture 3695.60 3696.40 0
2012-12-10 Multi-Stage Fracture 3637.10 3637.90 0
2012-12-10 Multi-Stage Fracture 3564.90 3565.70 0
2012-12-11 Multi-Stage Fracture 3506.10 3506.90 0
2012-12-11 Multi-Stage Fracture 3436.60 3437.40 0
2012-12-11 Multi-Stage Fracture 3364.60 3365.40 0
2012-12-11 Multi-Stage Fracture 3306.10 3306.90 0
2012-12-11 Multi-Stage Fracture 3233.90 3234.70 0
2012-12-11 Multi-Stage Fracture 3161.60 3162.40 0
2012-12-11 Multi-Stage Fracture 3102.90 3103.70 0
2012-12-10 Multi-Stage Fracture 4229.90 4230.70 0
2012-12-11 Multi-Stage Fracture 3031.70 3032.20 0
2012-12-11 Multi-Stage Fracture 2927.90 2973.70 0
2012-12-11 Multi-Stage Fracture 2901.10 2901.90 0
2012-12-10 Multi-Stage Fracture 4171.10 4171.90 0
2012-12-10 Multi-Stage Fracture 4098.90 4099.70 0
2012-12-10 Multi-Stage Fracture 4040.10 4040.90 0
2012-12-10 Multi-Stage Fracture 3968.10 3968.90 0
2012-12-10 Multi-Stage Fracture 3895.90 3896.70 0
2012-12-10 Multi-Stage Fracture 3837.20 3838.00 0
2012-12-10 Multi-Stage Fracture 3767.50 3768.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 5238 0.0 0.0 0.0
2014 5235 0.0 0.0 0.0
2015 5320 0.0 0.0 0.0
2016 2272 0.0 0.0 0.0
2017 6204 0.0 0.0 0.0
2018 5698 0.0 0.0 0.0
2019 5739 0.0 0.0 0.0
2020 1910 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-28 No Incident Encountered 0.00 0.00
2012-12-12 No Incident Encountered 0.00 0.00

For data sources see[8]

References