If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616020409000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.248903,"lon":-118.250923,"icon":""}]} |
Location: 00/09-04-061-02W6/0 | |
Location Alias: 00/09-04-61-02 W6M | |
Location Alias 2: 00/09-04-061-02 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 02 | |
Section: 04 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: STRATH RESTHA 9-4-61-2 | |
Operator Name: Strath Resources Ltd. | |
License Number: 0436000 | |
License Date: 2011-08-12 | |
License Status: Issued | |
Spud Date: 2011-08-22 | |
Final Drill Date: 2011-09-20 | |
Well Total Depth: 4244.00 m | |
Surface Hole Latitude: 54.248903 | |
Surface Hole Longitude: -118.250923 |
Date | Event |
---|---|
2011-08-12 | Obtained License |
2011-08-22 | Lost Circulation Occurred |
2011-08-27 | Surface Casing Operation Performed |
2011-09-05 | Well Log Performed |
2011-09-06 | Direction Drilling Operation Performed - Horizontal |
2011-09-12 | Intermediate Casing Operation Performed |
2011-09-12 | Well Log Performed |
2011-09-14 | Well Log Performed |
2011-09-20 | Finished Drilling |
2011-09-20 | Well Mode changed to Drilled and Cased |
2011-09-21 | Well Log Performed |
2011-09-23 | Liner Casing Operation Performed |
2011-09-23 | Perforation Treatment Performed - Open-Hole Completion |
2011-09-25 | Rig Released |
2011-10-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-10-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-01-11 | Well Began Production |
2012-01-11 | Well Fluid changed to Gas |
2012-01-11 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-09-06 | 2395.40 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-09-23 | Open Hole/Barefoot Completion | 4239.00 | 4244.00 | 0 |
2011-10-22 | Multi-Stage Fracture | 3697.70 | 3698.50 | 0 |
2011-10-22 | Multi-Stage Fracture | 3625.30 | 3626.10 | 0 |
2011-10-22 | Multi-Stage Fracture | 3566.30 | 3567.10 | 0 |
2011-10-22 | Multi-Stage Fracture | 3494.20 | 3495.00 | 0 |
2011-10-22 | Multi-Stage Fracture | 3421.70 | 3422.50 | 0 |
2011-10-22 | Multi-Stage Fracture | 3349.30 | 3350.10 | 0 |
2011-10-22 | Multi-Stage Fracture | 3276.80 | 3277.60 | 0 |
2011-10-22 | Multi-Stage Fracture | 3217.80 | 3218.60 | 0 |
2011-10-23 | Multi-Stage Fracture | 3145.40 | 3146.20 | 0 |
2011-10-23 | Multi-Stage Fracture | 3086.20 | 3087.00 | 0 |
2011-10-21 | Multi-Stage Fracture | 4229.70 | 4231.00 | 0 |
2011-10-23 | Multi-Stage Fracture | 3013.80 | 3014.60 | 0 |
2011-10-23 | Multi-Stage Fracture | 2954.70 | 2955.50 | 0 |
2011-10-23 | Multi-Stage Fracture | 2895.70 | 2896.50 | 0 |
2011-10-21 | Multi-Stage Fracture | 4190.80 | 4191.60 | 0 |
2011-10-21 | Multi-Stage Fracture | 4118.70 | 4119.50 | 0 |
2011-10-21 | Multi-Stage Fracture | 4046.70 | 4047.50 | 0 |
2011-10-21 | Multi-Stage Fracture | 3974.20 | 3975.00 | 0 |
2011-10-21 | Multi-Stage Fracture | 3915.20 | 3916.00 | 0 |
2011-10-22 | Multi-Stage Fracture | 3842.70 | 3843.50 | 0 |
2011-10-22 | Multi-Stage Fracture | 3770.20 | 3771.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 8332 | 0.0 | 0.0 | 0.0 |
2013 | 5952 | 0.0 | 0.0 | 0.0 |
2014 | 7469 | 0.0 | 0.0 | 0.0 |
2015 | 7780 | 0.0 | 0.0 | 0.0 |
2016 | 6071 | 0.0 | 0.0 | 0.0 |
2017 | 7500 | 0.0 | 0.0 | 0.0 |
2018 | 7100 | 0.0 | 0.0 | 0.0 |
2019 | 8360 | 0.0 | 0.0 | 0.0 |
2020 | 2159 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2011-08-22 | Lost Circulation | 145.60 | 254.00 |
For data sources see[7]