If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0616012705000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.302183,"lon":-118.068925,"icon":""}]} |
Location: 00/05-27-061-01W6/0 | |
Location Alias: 00/05-27-61-01 W6M | |
Location Alias 2: 00/05-27-061-01 W6/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 6 | |
Range: 01 | |
Section: 27 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: DOME ET AL LATOR 5-27-61-1 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0077148 | |
License Date: 1979-07-27 | |
License Status: RecCertified | |
Spud Date: 1979-08-14 | |
Final Drill Date: 1979-10-03 | |
Well Total Depth: 3092.00 m | |
Surface Hole Latitude: 54.302183 | |
Surface Hole Longitude: -118.068925 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-05-19 | Lost Circulation Occurred |
1979-07-27 | Obtained License |
1979-10-03 | Finished Drilling |
1979-10-11 | Production Casing Operation Performed |
1979-10-12 | Well Mode changed to Drilled and Cased |
1979-11-14 | Perforation Treatment Performed - Jet Perforation |
1979-11-15 | Perforation Treatment Performed - Cement Squeeze |
1979-11-20 | Perforation Treatment Performed - Jet Perforation |
1979-11-23 | Perforation Treatment Performed - Fractured |
1979-11-27 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1979-11-29 | Perforation Treatment Performed - Jet Perforation |
1979-12-03 | Perforation Treatment Performed - Fractured |
1981-02-16 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1981-02-16 | Well Abandoned |
1981-02-16 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-11-14 | Perforation | 3042.50 | 3043.00 | 13 |
1979-11-15 | Cement Squeeze | 3042.50 | 3043.00 | 0 |
1979-11-20 | Perforation | 3053.30 | 3056.30 | 13 |
1979-11-23 | Fracture | 3053.30 | 3056.30 | 0 |
1979-11-27 | Packing Device Capped w/Cement | 3030.00 | 3030.00 | 0 |
1979-11-29 | Perforation | 2035.00 | 2040.00 | 7 |
1979-12-03 | Fracture | 2035.00 | 2040.00 | 0 |
1981-02-16 | Packing Device Capped w/Cement | 2025.00 | 2025.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1979-05-19 | Lost Circulation | 454.00 | 454.00 |
For data sources see[5]