X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615273316000

Well Details

Well ID: 0615273316000
Loading map...
Location: 00/16-33-061-27W5/0
Location Alias: 00/16-33-61-27 W5M
Location Alias 2: 00/16-33-061-27 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 27
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE 12-26 HZ SMOKY 16-33-61-27
Operator Name: Cequence Energy Ltd.
License Number: 0477331
License Date: 2015-10-22
License Status: Issued
Spud Date: 2015-11-16
Final Drill Date: 2015-12-15
Well Total Depth: 6100.00 m
Surface Hole Latitude: 54.306536
Surface Hole Longitude: -117.944671

For data sources see[1][2]

Well History

Date Event
2015-10-22 Obtained License
2015-11-17 Surface Casing Operation Performed
2015-11-23 Direction Drilling Operation Performed - Deviate
2015-11-27 Intermediate Casing Operation Performed
2015-11-29 Direction Drilling Operation Performed - Horizontal
2015-12-15 Finished Drilling
2015-12-15 Well Log Performed
2015-12-15 Well Mode changed to Drilled and Cased
2015-12-17 Liner Casing Operation Performed
2015-12-18 Rig Released
2015-12-23 Perforation Treatment Performed - Open-Hole Completion
2015-12-27 Perforation Treatment Performed - Abrasa-Jet Perforation
2015-12-27 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-28 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-29 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-30 Perforation Treatment Performed - Multi-Stage Fracture
2015-12-31 Perforation Treatment Performed - Multi-Stage Fracture
2016-01-01 Well Began Production
2016-01-01 Well Fluid changed to Gas
2016-01-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-11-16 Precision Drilling Corporation 382 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-11-23 2627.70 Deviate (5 - 79 degrees)
2015-11-29 3141.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-12-23 Open Hole/Barefoot Completion 6093.50 6100.00 0
2015-12-27 Multi-Stage Fracture 5698.90 5700.40 0
2015-12-27 Multi-Stage Fracture 5656.90 5658.40 0
2015-12-28 Multi-Stage Fracture 5615.10 5616.70 0
2015-12-28 Multi-Stage Fracture 5574.90 5576.40 0
2015-12-28 Multi-Stage Fracture 5534.50 5536.00 0
2015-12-28 Multi-Stage Fracture 5492.20 5493.70 0
2015-12-28 Multi-Stage Fracture 5449.70 5451.30 0
2015-12-28 Multi-Stage Fracture 5407.70 5409.20 0
2015-12-28 Multi-Stage Fracture 5367.10 5368.70 0
2015-12-28 Multi-Stage Fracture 5327.20 5328.70 0
2015-12-27 Hydra Jet Perforation 6029.40 6055.90 0
2015-12-28 Multi-Stage Fracture 5285.40 5286.90 0
2015-12-28 Multi-Stage Fracture 5243.70 5245.20 0
2015-12-28 Multi-Stage Fracture 5202.10 5203.60 0
2015-12-29 Multi-Stage Fracture 5161.10 5162.70 0
2015-12-29 Multi-Stage Fracture 5119.60 5121.20 0
2015-12-29 Multi-Stage Fracture 5078.70 5080.20 0
2015-12-29 Multi-Stage Fracture 5036.50 5038.00 0
2015-12-29 Multi-Stage Fracture 4995.70 4997.20 0
2015-12-29 Multi-Stage Fracture 4953.50 4955.10 0
2015-12-29 Multi-Stage Fracture 4911.20 4912.70 0
2015-12-27 Multi-Stage Fracture 5989.70 5991.20 0
2015-12-29 Multi-Stage Fracture 4871.50 4873.00 0
2015-12-29 Multi-Stage Fracture 4831.10 4832.60 0
2015-12-29 Multi-Stage Fracture 4791.10 4792.70 0
2015-12-29 Multi-Stage Fracture 4748.30 4749.80 0
2015-12-29 Multi-Stage Fracture 4705.30 4706.80 0
2015-12-29 Multi-Stage Fracture 4663.00 4664.60 0
2015-12-29 Multi-Stage Fracture 4621.40 4622.90 0
2015-12-29 Multi-Stage Fracture 4578.50 4580.00 0
2015-12-29 Multi-Stage Fracture 4536.30 4537.90 0
2015-12-29 Multi-Stage Fracture 4493.80 4495.30 0
2015-12-27 Multi-Stage Fracture 5948.00 5949.50 0
2015-12-29 Multi-Stage Fracture 4453.20 4454.80 0
2015-12-29 Multi-Stage Fracture 4411.20 4412.70 0
2015-12-29 Multi-Stage Fracture 4368.70 4370.30 0
2015-12-29 Multi-Stage Fracture 4326.00 4327.60 0
2015-12-29 Multi-Stage Fracture 4284.50 4286.00 0
2015-12-30 Multi-Stage Fracture 4243.10 4244.60 0
2015-12-30 Multi-Stage Fracture 4202.00 4203.60 0
2015-12-30 Multi-Stage Fracture 4158.20 4159.70 0
2015-12-30 Multi-Stage Fracture 4117.20 4118.70 0
2015-12-30 Multi-Stage Fracture 4074.90 4076.40 0
2015-12-27 Multi-Stage Fracture 5907.50 5909.00 0
2015-12-30 Multi-Stage Fracture 4033.30 4034.80 0
2015-12-30 Multi-Stage Fracture 3991.10 3992.60 0
2015-12-30 Multi-Stage Fracture 3947.60 3949.20 0
2015-12-30 Multi-Stage Fracture 3905.20 3906.70 0
2015-12-30 Multi-Stage Fracture 3862.20 3863.70 0
2015-12-30 Multi-Stage Fracture 3820.30 3821.80 0
2015-12-30 Multi-Stage Fracture 3775.80 3777.40 0
2015-12-30 Multi-Stage Fracture 3731.40 3732.90 0
2015-12-30 Multi-Stage Fracture 3687.70 3689.20 0
2015-12-30 Multi-Stage Fracture 3642.50 3644.10 0
2015-12-27 Multi-Stage Fracture 5866.20 5867.80 0
2015-12-30 Multi-Stage Fracture 3598.70 3600.20 0
2015-12-30 Multi-Stage Fracture 3555.30 3556.80 0
2015-12-30 Multi-Stage Fracture 3514.50 3516.10 0
2015-12-30 Multi-Stage Fracture 3470.40 3471.90 0
2015-12-30 Multi-Stage Fracture 3426.30 3427.80 0
2015-12-30 Multi-Stage Fracture 3380.90 3382.40 0
2015-12-31 Multi-Stage Fracture 3337.20 3338.80 0
2015-12-31 Multi-Stage Fracture 3293.40 3294.90 0
2015-12-31 Multi-Stage Fracture 3248.50 3250.10 0
2015-12-31 Multi-Stage Fracture 3204.10 3205.70 0
2015-12-27 Multi-Stage Fracture 5824.30 5825.80 0
2015-12-31 Multi-Stage Fracture 3159.70 3161.30 0
2015-12-31 Multi-Stage Fracture 3119.00 3120.50 0
2015-12-27 Multi-Stage Fracture 5783.10 5784.60 0
2015-12-27 Multi-Stage Fracture 5741.30 5742.80 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-12-27 2015-12-31 3,050 12,336 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 77.9097 N/A
30/50 Atlas CRC-E Calfrac Non-Hazardous Ingredients Trade Secret 100 2.2194 N/A
Phenolic Resin 37337-65-8 100 2.2194 N/A
Phenolic Resin 9003-35-4 100 2.2194 N/A
Quartz (SiO2) 14808-60-7 100 2.2194 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 15.5007 N/A
50/140 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 2.2167 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 0.3256 N/A
Water 7732-18-5 100 0.3256 N/A
DWP-966 Calfrac Bactericide/Biocide Bronopol 52-51-7 100 0.0654 N/A
Methanol 67-56-1 100 0.0636 N/A
Water 7732-18-5 100 0.0635 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.1091 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.124 N/A
Ethoxylated phenolic resin 8300 100 0.126 N/A
Isobutyl ketone 8300 100 0.1242 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1351 N/A
Organic acid salts 1 8300 100 0.124 N/A
Organic acid salts 2 8300 100 0.1251 N/A
Organic acid salts 3 8300 100 0.126 N/A
Nitrogen Calfrac Energizing Fluid Nitrogen 7727-37-9 100 1.7803 N/A
DWP-621 Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.128 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-12-07 2015-12-31 Oilfield Produced Water 14296

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 8376 0.0 0.0 0.0
2017 8549 0.0 0.0 0.0
2018 8717 0.0 0.0 0.0
2019 8639 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-18 No Incident Encountered 0.00 0.00
2016-01-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References