If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0615271610000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.268997,"lon":-117.945574,"icon":""}]} |
| Location: 00/10-16-061-27W5/0 | |
| Location Alias: 00/10-16-61-27 W5M | |
| Location Alias 2: 00/10-16-061-27 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 061 | |
| Meridian: 5 | |
| Range: 27 | |
| Section: 16 | |
| County/Municipality: Municipal District of Greenview No. 16 | |
| Well Name: CEQUENCE 4-14 HZ WANYAN 10-16-61-27 | |
| Operator Name: Cequence Energy Ltd. | |
| License Number: 0447774 | |
| License Date: 2012-08-15 | |
| License Status: Issued | |
| Spud Date: 2012-08-28 | |
| Final Drill Date: 2012-09-27 | |
| Well Total Depth: 5634.00 m | |
| Surface Hole Latitude: 54.268997 | |
| Surface Hole Longitude: -117.945574 |
| Date | Event |
|---|---|
| 2012-08-15 | Obtained License |
| 2012-08-25 | Well Log Performed |
| 2012-08-30 | Surface Casing Operation Performed |
| 2012-09-05 | Direction Drilling Operation Performed - Deviate |
| 2012-09-13 | Intermediate Casing Operation Performed |
| 2012-09-15 | Direction Drilling Operation Performed - Horizontal |
| 2012-09-25 | Well Log Performed |
| 2012-09-27 | Finished Drilling |
| 2012-09-27 | Well Mode changed to Drilled and Cased |
| 2012-09-28 | Liner Casing Operation Performed |
| 2012-09-30 | Rig Released |
| 2012-10-06 | Well Log Performed |
| 2012-10-09 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-10-10 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-11 | Well Began Production |
| 2012-10-11 | Well Fluid changed to Gas |
| 2012-10-11 | Well Mode changed to Flowing |
| 2012-10-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-10-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-11-12 | Perforation Treatment Performed - Multi-Stage Fracture |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-08-28 | Canelson Drilling Inc. | 19 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-09-05 | 2804.70 | Deviate (5 - 79 degrees) |
| 2012-09-15 | 3321.30 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-10-09 | Open Hole/Barefoot Completion | 5624.50 | 5634.00 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 4920.30 | 4920.40 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 4833.60 | 4833.70 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 4747.40 | 4747.50 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 4659.50 | 4659.60 | 0 |
| 2012-10-12 | Multi-Stage Fracture | 4537.60 | 4537.70 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 4486.60 | 4486.70 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 4399.80 | 4399.90 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 4314.30 | 4314.40 | 0 |
| 2012-10-13 | Multi-Stage Fracture | 4241.90 | 4242.00 | 0 |
| 2012-11-12 | Multi-Stage Fracture | 3985.90 | 3986.00 | 0 |
| 2012-10-10 | Multi-Stage Fracture | 5559.70 | 5588.40 | 0 |
| 2012-11-12 | Multi-Stage Fracture | 3812.80 | 3812.90 | 0 |
| 2012-10-10 | Multi-Stage Fracture | 5515.40 | 5515.50 | 0 |
| 2012-10-10 | Multi-Stage Fracture | 5417.80 | 5417.90 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 5334.60 | 5334.70 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 5250.10 | 5250.20 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 5156.60 | 5156.70 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 5080.10 | 5080.20 | 0 |
| 2012-10-11 | Multi-Stage Fracture | 5006.90 | 5007.00 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 1417 | 0.0 | 0.0 | 0.0 |
| 2013 | 8184 | 0.0 | 0.0 | 0.0 |
| 2014 | 8519 | 0.0 | 0.0 | 0.0 |
| 2015 | 4704 | 0.0 | 0.0 | 0.0 |
| 2016 | 8160 | 0.0 | 0.0 | 0.0 |
| 2017 | 8184 | 0.0 | 0.0 | 0.0 |
| 2018 | 8736 | 0.0 | 0.0 | 0.0 |
| 2019 | 8615 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-09-30 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-24 | No Incident Encountered | 0.00 | 0.00 |
| 2012-11-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]