X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615263101002

Well Details

Well ID: 0615263101002
Loading map...
Location: 00/01-31-061-26W5/2
Location Alias: 00/01-31-61-26 W5M
Location Alias 2: 00/01-31-061-26 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 26
Section: 31
County/Municipality: Municipal District of Greenview No. 16
Well Name: CEQUENCE HZ SIMON 1-31-61-26
Operator Name: Cequence Energy Ltd.
License Number: 0428910
License Date: 2010-12-23
License Status: Amended
Spud Date: 2011-01-19
Final Drill Date: 2011-02-13
Well Total Depth: 4667.00 m
Surface Hole Latitude: 54.302076
Surface Hole Longitude: -117.860475

For data sources see[1][2]

Well History

Date Event
2010-12-23 Obtained License
2011-01-21 Surface Casing Operation Performed
2011-02-01 Direction Drilling Operation Performed - Horizontal
2011-02-06 Intermediate Casing Operation Performed
2011-02-13 Finished Drilling
2011-02-13 Well Log Performed
2011-02-13 Well Mode changed to Drilled and Cased
2011-02-16 Liner Casing Operation Performed
2011-02-16 Rig Released
2011-03-07 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-08 Perforation Treatment Performed - Multi-Stage Fracture
2011-03-08 Well Fluid changed to Gas
2011-03-08 Well Mode changed to Testing
2011-03-09 Perforation Treatment Performed - Multi-Stage Fracture
2011-04-06 Well Began Production
2011-04-06 Well Fluid changed to Gas
2011-04-06 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-02-01 2702.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-03-07 Multi-Stage Fracture 4630.70 4653.50 0
2011-03-08 Multi-Stage Fracture 3753.40 3753.50 0
2011-03-08 Multi-Stage Fracture 3666.50 3666.60 0
2011-03-09 Multi-Stage Fracture 3579.40 3579.50 0
2011-03-09 Multi-Stage Fracture 3465.80 3465.90 0
2011-03-09 Multi-Stage Fracture 3365.20 3365.30 0
2011-03-09 Multi-Stage Fracture 3264.70 3264.80 0
2011-03-09 Multi-Stage Fracture 3137.30 3137.40 0
2011-03-07 Multi-Stage Fracture 4530.20 4530.30 0
2011-03-07 Multi-Stage Fracture 4429.80 4429.90 0
2011-03-08 Multi-Stage Fracture 4329.30 4329.40 0
2011-03-08 Multi-Stage Fracture 4228.70 4228.80 0
2011-03-08 Multi-Stage Fracture 4128.40 4128.50 0
2011-03-08 Multi-Stage Fracture 4028.00 4028.10 0
2011-03-08 Multi-Stage Fracture 3940.90 3941.00 0
2011-03-08 Multi-Stage Fracture 3483.80 3483.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 6375 0.0 0.0 0.0
2012 8328 0.0 0.0 0.0
2013 6802 0.0 0.0 0.0
2014 7296 0.0 0.0 0.0
2015 6576 0.0 0.0 0.0
2016 4369 0.0 0.0 0.0
2017 8088 0.0 0.0 0.0
2018 8447 0.0 0.0 0.0
2019 8711 0.0 0.0 0.0
2020 1464 0.0 0.0 0.0

For data sources see[6]

References