If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615262213000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.282739,"lon":-117.808069,"icon":""}]} |
Location: 00/13-22-061-26W5/0 | |
Location Alias: 00/13-22-61-26 W5M | |
Location Alias 2: 00/13-22-061-26 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 26 | |
Section: 22 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: CEQUENCE 100 HZ SIMON 13-22-61-26 | |
Operator Name: Cequence Energy Ltd. | |
License Number: 0437769 | |
License Date: 2011-10-18 | |
License Status: Issued | |
Spud Date: 2012-01-24 | |
Final Drill Date: 2012-02-28 | |
Well Total Depth: 4821.50 m | |
Surface Hole Latitude: 54.282739 | |
Surface Hole Longitude: -117.808069 |
Date | Event |
---|---|
2011-10-18 | Obtained License |
2012-01-27 | Surface Casing Operation Performed |
2012-02-03 | Direction Drilling Operation Performed - Horizontal |
2012-02-10 | Well Log Performed |
2012-02-13 | Well Log Performed |
2012-02-16 | Intermediate Casing Operation Performed |
2012-02-28 | Finished Drilling |
2012-02-28 | Well Log Performed |
2012-02-28 | Well Mode changed to Drilled and Cased |
2012-03-01 | Liner Casing Operation Performed |
2012-03-01 | Well Log Performed |
2012-03-04 | Rig Released |
2012-03-10 | Perforation Treatment Performed - Open-Hole Completion |
2012-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-14 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-27 | Well Began Production |
2012-03-27 | Well Fluid changed to Gas |
2012-03-27 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-01-24 | Canelson Drilling Inc. | 18 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-03 | 2712.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-03-10 | Open Hole/Barefoot Completion | 4815.50 | 4821.50 | 0 |
2012-03-12 | Multi-Stage Fracture | 3947.70 | 3947.80 | 0 |
2012-03-13 | Multi-Stage Fracture | 3847.30 | 3847.40 | 0 |
2012-03-13 | Multi-Stage Fracture | 3747.50 | 3747.60 | 0 |
2012-03-13 | Multi-Stage Fracture | 3647.00 | 3647.10 | 0 |
2012-03-13 | Multi-Stage Fracture | 3546.70 | 3546.80 | 0 |
2012-03-13 | Multi-Stage Fracture | 3447.10 | 3447.20 | 0 |
2012-03-14 | Multi-Stage Fracture | 3346.90 | 3347.00 | 0 |
2012-03-14 | Multi-Stage Fracture | 3246.50 | 3246.60 | 0 |
2012-03-14 | Multi-Stage Fracture | 3160.00 | 3160.10 | 0 |
2012-03-14 | Multi-Stage Fracture | 3060.30 | 3060.40 | 0 |
2012-03-11 | Multi-Stage Fracture | 4764.10 | 4766.60 | 0 |
2012-03-11 | Multi-Stage Fracture | 4649.90 | 4650.00 | 0 |
2012-03-11 | Multi-Stage Fracture | 4549.40 | 4549.50 | 0 |
2012-03-12 | Multi-Stage Fracture | 4449.90 | 4450.00 | 0 |
2012-03-12 | Multi-Stage Fracture | 4349.40 | 4349.50 | 0 |
2012-03-12 | Multi-Stage Fracture | 4248.80 | 4248.90 | 0 |
2012-03-12 | Multi-Stage Fracture | 4148.30 | 4148.40 | 0 |
2012-03-12 | Multi-Stage Fracture | 4047.90 | 4048.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5593 | 0.0 | 0.0 | 0.0 |
2013 | 7923 | 0.0 | 0.0 | 0.0 |
2014 | 8570 | 0.0 | 0.0 | 0.0 |
2015 | 5042 | 0.0 | 0.0 | 0.0 |
2016 | 7045 | 0.0 | 0.0 | 0.0 |
2017 | 8437 | 0.0 | 0.0 | 0.0 |
2018 | 8471 | 0.0 | 0.0 | 0.0 |
2019 | 7481 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]