X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615231601002

Well Details

Well ID: 0615231601002
Loading map...
Location: 00/01-16-061-23W5/2
Location Alias: 00/01-16-61-23 W5M
Location Alias 2: 00/01-16-061-23 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 23
Section: 16
County/Municipality: Municipal District of Greenview No. 16
Well Name: AOSC HZ PLACID 1-16-61-23
Operator Name: Athabasca Oil Corporation
License Number: 0441560
License Date: 2011-12-16
License Status: Suspension
Spud Date: 2012-02-23
Final Drill Date: 2012-03-18
Well Total Depth: 3992.00 m
Surface Hole Latitude: 54.283145
Surface Hole Longitude: -117.380100

For data sources see[1][2]

Well History

Date Event
2011-12-16 Obtained License
2012-02-24 Surface Casing Operation Performed
2012-03-04 Well Log Performed
2012-03-05 Direction Drilling Operation Performed - Deviate
2012-03-07 Direction Drilling Operation Performed - Horizontal
2012-03-18 Finished Drilling
2012-03-18 Well Mode changed to Drilled and Cased
2012-03-21 Production Casing Operation Performed
2012-03-22 Rig Released
2013-01-23 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-24 Perforation Treatment Performed - Multi-Stage Fracture
2013-01-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-10 Well Fluid changed to Gas
2017-02-10 Well Mode changed to Testing
2017-02-15 Well Type changed to Observation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2012-03-05 2378.00 Deviate (5 - 79 degrees)
2012-03-07 2758.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-01-23 Multi-Stage Fracture 3921.90 3922.00 0
2013-01-25 Multi-Stage Fracture 3173.30 3173.40 0
2013-01-25 Multi-Stage Fracture 3103.10 3103.20 0
2013-01-25 Multi-Stage Fracture 3032.30 3032.90 0
2013-01-25 Multi-Stage Fracture 2961.60 2961.70 0
2013-01-25 Multi-Stage Fracture 2903.40 2903.50 0
2013-01-23 Multi-Stage Fracture 3826.60 3826.70 0
2013-01-23 Multi-Stage Fracture 3742.80 3742.90 0
2013-01-23 Multi-Stage Fracture 3659.90 3660.00 0
2013-01-23 Multi-Stage Fracture 3575.30 3575.40 0
2013-01-24 Multi-Stage Fracture 3491.80 3491.90 0
2013-01-24 Multi-Stage Fracture 3411.10 3411.20 0
2013-01-25 Multi-Stage Fracture 3327.90 3328.00 0
2013-01-25 Multi-Stage Fracture 3243.20 3243.30 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-01-23 2013-01-25 2,655 1,529 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 N2 7727-37-9 100 22.7606 N/A
water 7732-18-5 100 43.3998 N/A
PR-6000 (20/40) bulk Trican silica crystalline 14808-60-7 100 9.428 N/A
Sand (30/50) Trican silica crystalline 14808-60-7 100 22.3747 N/A
Sand (50/140) Trican silica crystalline 14808-60-7 100 0.4405 N/A
FCB-1 Trican Breaker severely refined mineral oil Trade Secret 100 0.0327 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0755 N/A
water 7732-18-5 100 0.0755 N/A
FC-1 Trican Surfactant isopropanol 67-63-0 100 0.6547 N/A
N.N.N-dimethyl-1-octadecanamine 124-28-7 100 0.6547 N/A
N.N.N-dimethyl-1-octadecanamine-HCL Not Available 100 0.6547 N/A
N.N.N-trimethyl-1-octadecaminium chloride 112-03-8 100 0.6547 N/A
FC-2 Trican Surfactant organic salt 7947 100 0.5368 N/A
water 7732-18-5 100 0.5368 N/A
MS-6 Trican Surfactant non-hazardous ingredients Not Available 100 0.3189 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-01-16 2013-01-24 Surface Water - Runoff 1380
2013-01-15 2013-01-18 Recycled Fracturing Water (treated at well site) 350

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 70 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-18 No Incident Encountered 0.00 0.00
2013-01-30 No Incident Encountered 0.00 0.00

For data sources see[9]

References