X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615221006002

Well Details

Well ID: 0615221006002
Loading map...
Location: 00/06-10-061-22W5/2
Location Alias: 00/06-10-61-22 W5M
Location Alias 2: 00/06-10-061-22 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 22
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: ACL BIGSTONE 6-10-61-22
Operator Name: Paramount Resources Ltd.
License Number: 0018891
License Date: 1960-03-23
License Status: Abandoned
Spud Date: 1960-07-13
Final Drill Date: 1960-09-26
Well Total Depth: 3475.00 m
Surface Hole Latitude: 54.259915
Surface Hole Longitude: -117.216835

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-03-23 Obtained License
1960-08-08 Drill Stem Test Performed
1960-08-18 Drill Stem Test Performed
1960-08-24 Drill Stem Test Performed
1960-08-26 Drill Stem Test Performed
1960-09-25 Drill Stem Test Performed
1960-09-26 Finished Drilling
1960-10-28 Production Casing Operation Performed
1964-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-10-24 Perforation Treatment Performed - Jet Perforation
1964-10-29 Perforation Treatment Performed - Cement Squeeze
1964-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-11-04 Perforation Treatment Performed - Jet Perforation
1964-11-07 Perforation Treatment Performed - Cement Squeeze
1964-11-07 Perforation Treatment Performed - Jet Perforation
1964-11-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-12-13 Perforation Treatment Performed - Abrasa-Jet Perforation
1969-12-13 Perforation Treatment Performed - Cement Squeeze
1969-12-16 Perforation Treatment Performed - Cement Plug
1969-12-17 Perforation Treatment Performed - Jet Perforation
1969-12-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-12-20 Well Mode changed to Drilled and Cased
1970-10-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1970-10-24 Perforation Treatment Performed - Jet Perforation
1970-10-25 Perforation Treatment Performed - Cement Squeeze
1970-11-07 Well Began Injection
1970-11-07 Well Fluid changed to Water
1970-11-07 Well Type changed to Disposal
1982-03-31 Well Fluid changed to Water
1982-03-31 Well Mode changed to Suspended
1982-03-31 Well Type changed to Disposal
1992-03-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-03-17 Perforation Treatment Performed - Jet Perforation
1992-03-17 Plug Back Performed
1992-03-18 Perforation Treatment Performed - Remedial Casing
1992-03-19 Well Abandoned
1992-03-19 Well Fluid changed to Water
1992-03-19 Well Mode changed to Abandoned
1992-03-19 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-10-24 Perforation 2430.20 2434.70 7
1964-11-07 Perforation 2366.50 2367.40 7
1964-11-07 Perforation 2367.70 2368.30 7
1964-11-07 Perforation 2369.20 2369.80 7
1964-11-07 Perforation 2370.70 2371.60 7
1964-11-07 Perforation 2373.20 2375.90 7
1964-11-08 Acid Treatment 2364.30 2375.90 0
1969-12-12 Packing Device Capped w/Cement 2347.00 2347.00 0
1969-12-13 Hydra Jet Perforation 1345.70 1345.70 26
1969-12-13 Cement Squeeze 1345.70 1345.70 0
1969-12-16 Cement Plug 1339.60 1339.60 0
1964-10-24 Perforation 2429.60 2434.10 7
1969-12-17 Perforation 1319.20 1333.80 7
1969-12-18 Acid Treatment 1319.20 1333.80 0
1970-10-24 Packing Device Capped w/Cement 1246.60 1246.60 0
1970-10-24 Perforation 1234.40 1234.70 13
1970-10-25 Cement Squeeze 1234.40 1234.70 0
1992-03-17 Packing Device Capped w/Cement 1166.10 1175.00 0
1992-03-17 Perforation 445.00 446.00 20
1992-03-18 Remedial Casing Cementing 445.00 446.00 0
1964-10-24 Acid Treatment 2429.60 2434.70 0
1964-10-29 Cement Squeeze 2429.60 2434.70 0
1964-11-04 Perforation 2415.20 2420.10 0
1964-11-04 Perforation 2421.90 2425.00 0
1964-11-04 Acid Treatment 2421.90 2425.00 0
1964-11-07 Cement Squeeze 2421.90 2425.00 0
1964-11-07 Perforation 2364.30 2365.20 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0

For data sources see[5]

References