X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615202010002

Well Details

Well ID: 0615202010002
Loading map...
Location: 00/10-20-061-20W5/2
Location Alias: 00/10-20-61-20 W5M
Location Alias 2: 00/10-20-061-20 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL KAYBOBS 10-20-61-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0185555
License Date: 1996-02-08
License Status: Issued
Spud Date: 1996-03-15
Final Drill Date: 1996-03-26
Well Total Depth: 2173.00 m
Surface Hole Latitude: 54.290653
Surface Hole Longitude: -116.960310

For data sources see[1][2]

Well History

Date Event
1996-02-08 Obtained License
1996-03-17 Surface Casing Operation Performed
1996-03-26 Finished Drilling
1996-03-26 Well Log Performed
1996-03-26 Well Mode changed to Drilled and Cased
1996-03-27 Drill Stem Test Performed
1996-03-27 Well Log Performed
1996-03-29 Production Casing Operation Performed
1996-03-29 Rig Released
1996-04-02 Perforation Treatment Performed - Jet Perforation
1996-04-02 Well Log Performed
1996-04-03 Perforation Treatment Performed - Fractured
1996-11-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-11-24 Plug Back Performed
1996-11-26 Perforation Treatment Performed - Jet Perforation
1996-11-26 Well Log Performed
1996-11-27 Perforation Treatment Performed - Fractured
1997-02-06 Well Began Production
1997-02-06 Well Fluid changed to Gas
1997-02-06 Well Mode changed to Flowing
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-04-02 Perforation 2085.00 2091.00 18
1996-04-03 Fracture 2085.00 2091.00 0
1996-11-24 Packing Device Capped w/Cement 2072.00 2080.00 0
1996-11-26 Perforation 1834.50 1836.50 18
1996-11-26 Perforation 1838.00 1840.50 18
1996-11-27 Fracture 1834.50 1840.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 7731 0.0 0.0 0.0
1998 8605 0.0 0.0 0.0
1999 7944 0.0 0.0 0.0
2000 7338 0.0 0.0 0.0
2001 7390 0.0 0.0 0.0
2002 6663 0.0 0.0 0.0
2003 7693 0.0 0.0 0.0
2004 8579 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8735 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8759 0.0 0.0 0.0
2009 8735 0.0 0.0 0.0
2010 8399 0.0 0.0 0.0
2011 8557 0.0 0.0 0.0
2012 8758 0.0 0.0 0.0
2013 8302 0.0 0.0 0.0
2014 8425 0.0 0.0 0.0
2015 8736 0.0 0.0 0.0
2016 8496 0.0 0.0 0.0
2017 8376 0.0 0.0 0.0
2018 6241 0.0 0.0 0.0
2019 6544 0.0 0.0 0.0
2020 2111 0.0 0.0 0.0

For data sources see[5]

References