X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615200415002

Well Details

Well ID: 0615200415002
Loading map...
Location: 00/15-04-061-20W5/2
Location Alias: 00/15-04-61-20 W5M
Location Alias 2: 00/15-04-061-20 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 04
County/Municipality: Municipal District of Greenview No. 16
Well Name: TALISMAN ET AL KAYBOBS 15-4-61-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0157688
License Date: 1993-04-06
License Status: Suspension
Spud Date: 1993-05-12
Final Drill Date: 1993-06-09
Well Total Depth: 2595.00 m
Surface Hole Latitude: 54.256978
Surface Hole Longitude: -116.920945

For data sources see[1][2]

Well History

Date Event
1993-04-06 Obtained License
1993-05-13 Lost Circulation Occurred
1993-05-15 Surface Casing Operation Performed
1993-05-19 Direction Drilling Operation Performed - Deviate
1993-05-30 Lost Circulation Occurred
1993-06-09 Finished Drilling
1993-06-09 Well Mode changed to Drilled and Cased
1993-06-10 Well Log Performed
1993-06-12 Production Casing Operation Performed
1993-06-12 Rig Released
1993-06-28 Well Log Performed
1993-06-29 Well Log Performed
1993-07-02 Perforation Treatment Performed - Jet Perforation
1993-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-07-08 Well Log Performed
1993-07-12 Perforation Treatment Performed - Fractured
1994-08-22 Perforation Treatment Performed - Fractured
1995-03-01 Well Log Performed
1995-03-02 Well Log Performed
1995-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-03-03 Plug Back Performed
1995-03-04 Perforation Treatment Performed - Jet Perforation
1995-03-04 Well Mode changed to Drilled and Cased
1995-03-06 Perforation Treatment Performed - Fractured
1995-03-19 Well Log Performed
1995-03-20 Well Log Performed
1995-03-21 Perforation Treatment Performed - Jet Perforation
1995-03-21 Well Mode changed to Drilled and Cased
1995-03-22 Perforation Treatment Performed - Fractured
1996-07-30 Perforation Treatment Performed - Cement Squeeze
1996-07-30 Plug Back Performed
1996-07-30 Well Mode changed to Drilled and Cased
1996-08-08 Perforation Treatment Performed - Jet Perforation
1996-08-08 Well Log Performed
1996-08-08 Well Mode changed to Drilled and Cased
1996-08-10 Perforation Treatment Performed - Fractured
2012-03-16 Perforation Treatment Performed - Bridge Plug No Cement Required

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-05-19 600.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-07-02 Perforation 2536.50 2538.00 14
1995-03-21 Perforation 1956.50 1962.00 18
1995-03-22 Fracture 1956.50 1962.00 0
1996-07-30 Cement Squeeze 1956.50 1962.00 0
1996-08-08 Perforation 2150.50 2170.00 18
1996-08-10 Fracture 2150.50 2170.00 0
2012-03-16 Bridge Plug, No Cement 1890.00 1891.00 0
1993-07-02 Perforation 2540.00 2548.00 14
1993-07-02 Perforation 2549.00 2552.00 14
1993-07-07 Acid Treatment 2536.50 2552.00 0
1993-07-12 Fracture 2536.50 2552.00 0
1994-08-22 Fracture 2536.50 2552.00 0
1995-03-03 Packing Device Capped w/Cement 2502.00 2510.00 0
1995-03-04 Perforation 2116.00 2121.00 16
1995-03-06 Fracture 2116.00 2121.00 0

For data sources see[5]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1993-05-13 Lost Circulation 80.00 254.00
1993-05-30 Lost Circulation 1861.00 2595.00
2012-03-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References