X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615200211000

Well Details

Well ID: 0615200211000
Loading map...
Location: 00/11-02-061-20W5/0
Location Alias: 00/11-02-61-20 W5M
Location Alias 2: 00/11-02-061-20 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 20
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: XTO G06 KAYBOBS 11-2-61-20
Operator Name: XTO Energy Canada ULC
License Number: 0492085
License Date: 2018-11-15
License Status: Issued
Spud Date: 2018-12-06
Final Drill Date: 2018-12-29
Well Total Depth: 4915.00 m
Surface Hole Latitude: 54.234833
Surface Hole Longitude: -116.892914

For data sources see[1][2]

Well History

Date Event
2018-11-15 Obtained License
2018-12-07 Surface Casing Operation Performed
2018-12-10 Direction Drilling Operation Performed - Deviate
2018-12-11 Lost Circulation Occurred
2018-12-19 Direction Drilling Operation Performed - Horizontal
2018-12-19 Intermediate Casing Operation Performed
2018-12-29 Finished Drilling
2018-12-29 Production Casing Operation Performed
2018-12-29 Well Mode changed to Drilled and Cased
2018-12-30 Well Log Performed
2018-12-31 Rig Released
2019-09-24 Perforation Treatment Performed - Jet Perforation
2019-10-01 Well Fluid changed to Gas
2019-10-01 Well Mode changed to Testing
2019-10-04 Perforation Treatment Performed - Fractured
2019-10-04 Perforation Treatment Performed - Jet Perforation
2019-10-05 Perforation Treatment Performed - Fractured
2019-10-05 Perforation Treatment Performed - Jet Perforation
2019-10-07 Perforation Treatment Performed - Fractured
2019-10-07 Perforation Treatment Performed - Jet Perforation
2019-10-08 Perforation Treatment Performed - Fractured
2019-10-08 Perforation Treatment Performed - Jet Perforation
2019-10-10 Perforation Treatment Performed - Fractured
2019-10-10 Perforation Treatment Performed - Jet Perforation
2019-10-11 Perforation Treatment Performed - Fractured
2019-10-11 Perforation Treatment Performed - Jet Perforation
2019-10-12 Perforation Treatment Performed - Fractured
2019-10-12 Perforation Treatment Performed - Jet Perforation
2019-10-13 Perforation Treatment Performed - Fractured
2019-10-13 Perforation Treatment Performed - Jet Perforation
2019-10-14 Perforation Treatment Performed - Fractured
2019-10-14 Perforation Treatment Performed - Jet Perforation
2019-10-15 Perforation Treatment Performed - Fractured
2019-10-15 Perforation Treatment Performed - Jet Perforation
2019-10-16 Perforation Treatment Performed - Fractured
2019-10-16 Perforation Treatment Performed - Jet Perforation
2019-10-17 Perforation Treatment Performed - Fractured
2019-10-17 Perforation Treatment Performed - Jet Perforation
2019-10-18 Perforation Treatment Performed - Fractured
2019-10-18 Perforation Treatment Performed - Jet Perforation
2019-10-19 Perforation Treatment Performed - Fractured
2019-10-19 Perforation Treatment Performed - Jet Perforation
2019-10-20 Perforation Treatment Performed - Fractured
2019-10-20 Perforation Treatment Performed - Jet Perforation
2019-11-30 Well Fluid changed to Gas
2019-11-30 Well Mode changed to Test Completed
2019-12-01 Well Began Production
2019-12-01 Well Fluid changed to Gas
2019-12-01 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-12-06 Trinidad Drilling Ltd. 56 N/A Set Surface

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-12-10 713.80 Deviate (5 - 79 degrees)
2018-12-19 3421.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-09-24 Perforation 4848.50 4849.00 20
2019-10-04 Perforation 4709.50 4710.00 20
2019-10-05 Fracture 4709.50 4750.00 0
2019-10-05 Perforation 4690.00 4690.50 20
2019-10-05 Perforation 4670.00 4670.50 20
2019-10-05 Perforation 4650.00 4650.50 20
2019-10-07 Fracture 4650.00 4690.50 0
2019-10-07 Perforation 4630.50 4631.00 20
2019-10-07 Perforation 4610.50 4611.00 20
2019-10-07 Perforation 4590.50 4591.00 20
2019-10-08 Fracture 4590.50 4631.00 0
2019-09-24 Perforation 4828.50 4829.00 20
2019-10-08 Perforation 4571.00 4571.50 20
2019-10-08 Perforation 4551.00 4551.50 20
2019-10-08 Perforation 4531.00 4531.50 20
2019-10-10 Fracture 4531.00 4571.50 0
2019-10-10 Perforation 4511.50 4512.00 20
2019-10-10 Perforation 4491.50 4492.00 20
2019-10-10 Perforation 4471.50 4472.00 20
2019-10-10 Fracture 4471.50 4512.00 0
2019-10-10 Perforation 4452.00 4452.50 20
2019-10-10 Perforation 4432.00 4432.50 20
2019-10-04 Fracture 4828.50 4849.00 0
2019-10-10 Perforation 4412.00 4412.50 20
2019-10-11 Fracture 4412.00 4452.50 0
2019-10-11 Perforation 4392.50 4393.00 20
2019-10-11 Perforation 4372.50 4373.00 20
2019-10-11 Perforation 4352.50 4353.00 20
2019-10-12 Fracture 4352.50 4393.00 0
2019-10-12 Perforation 4333.00 4333.50 20
2019-10-12 Perforation 4313.00 4313.50 20
2019-10-12 Perforation 4293.00 4293.50 20
2019-10-13 Fracture 4293.00 4333.50 0
2019-10-04 Perforation 4809.00 4809.50 20
2019-10-13 Perforation 4273.50 4274.00 20
2019-10-13 Perforation 4253.50 4254.00 20
2019-10-13 Perforation 4233.50 4234.00 20
2019-10-14 Fracture 4233.50 4274.00 0
2019-10-14 Perforation 4214.00 4214.50 20
2019-10-14 Perforation 4194.00 4194.50 20
2019-10-14 Perforation 4174.00 4174.50 20
2019-10-14 Fracture 4174.00 4214.50 0
2019-10-14 Perforation 4154.50 4155.00 20
2019-10-14 Perforation 4134.50 4135.00 20
2019-10-04 Perforation 4789.00 4789.50 20
2019-10-14 Perforation 4114.50 4115.00 20
2019-10-14 Fracture 4114.50 4155.00 0
2019-10-14 Perforation 4095.00 4095.50 20
2019-10-14 Perforation 4075.00 4075.50 20
2019-10-14 Perforation 4055.00 4055.50 20
2019-10-15 Fracture 4055.00 4095.50 0
2019-10-15 Perforation 4035.50 4036.00 20
2019-10-15 Perforation 4015.50 4016.00 20
2019-10-15 Perforation 3995.50 3996.00 20
2019-10-15 Fracture 3995.50 4036.00 0
2019-10-04 Perforation 4769.00 4769.50 20
2019-10-15 Perforation 3976.00 3976.50 20
2019-10-15 Perforation 3956.00 3956.50 20
2019-10-15 Perforation 3936.00 3936.50 20
2019-10-16 Fracture 3936.00 3976.50 0
2019-10-16 Perforation 3916.50 3917.00 20
2019-10-16 Perforation 3896.50 3897.00 20
2019-10-16 Perforation 3876.50 3877.00 20
2019-10-17 Fracture 3876.50 3917.00 0
2019-10-17 Perforation 3857.00 3857.50 20
2019-10-17 Perforation 3837.00 3837.50 20
2019-10-04 Fracture 4769.00 4809.50 0
2019-10-17 Perforation 3817.00 3817.50 20
2019-10-17 Fracture 3817.00 3857.50 0
2019-10-17 Perforation 3797.50 3798.00 20
2019-10-17 Perforation 3777.50 3778.00 20
2019-10-17 Perforation 3757.50 3758.00 20
2019-10-18 Fracture 3757.50 3798.00 0
2019-10-18 Perforation 3738.00 3738.50 20
2019-10-18 Perforation 3718.00 3718.50 20
2019-10-18 Perforation 3698.00 3698.50 20
2019-10-18 Fracture 3698.00 3738.50 0
2019-10-04 Perforation 4749.50 4750.00 20
2019-10-18 Perforation 3678.50 3679.00 20
2019-10-18 Perforation 3658.50 3659.00 20
2019-10-18 Perforation 3638.50 3639.00 20
2019-10-18 Fracture 3638.50 3679.00 0
2019-10-18 Perforation 3619.00 3619.50 20
2019-10-18 Perforation 3599.00 3599.50 20
2019-10-18 Perforation 3579.00 3579.50 20
2019-10-19 Fracture 3579.00 3619.50 0
2019-10-19 Perforation 3559.50 3560.00 20
2019-10-19 Perforation 3539.50 3540.00 20
2019-10-04 Perforation 4729.50 4730.00 20
2019-10-19 Perforation 3519.50 3520.00 20
2019-10-19 Fracture 3519.50 3560.00 0
2019-10-19 Perforation 3500.00 3500.50 20
2019-10-19 Perforation 3480.00 3480.50 20
2019-10-19 Perforation 3460.00 3460.50 20
2019-10-20 Fracture 3460.00 3500.50 0
2019-10-20 Perforation 3440.50 3441.00 20
2019-10-20 Perforation 3420.50 3421.00 20
2019-10-20 Perforation 3400.50 3401.00 20
2019-10-20 Fracture 3400.50 3441.00 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-10-04 2019-10-20 3,318 30,928 N/A
2 2019-10-04 2019-10-15 3,318 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric acid 7647-01-0 100 0.3935 N/A
Water 7732-18-5 100 48.9543 N/A
100 Mesh Halliburton Crystalline silica. quartz 14808-60-7 100 0.3667 N/A
40/70 Premium Halliburton Crystalline silica. quartz 14808-60-7 100 10.6101 N/A
MC B-8510 Mutli-Chem Bactericide/Biocide 2.2 Dibromo-3-nitrilopropionamide 10222-01-2 100 0.0087 N/A
2.2-Dibromomalonamide 73003-80-2 100 0.0087 N/A
2-Monobromo-3-nitrilopropionamide 1113-55-9 100 0.0087 N/A
Dibromoacetonitrile 3252-43-5 100 0.0087 N/A
Inert Ingredient(s) Not Available 100 0.0087 N/A
FightR EC-1 Halliburton Friction Reducer Inert Ingredient(s) Not Available 100 0.0738 N/A
2 FDP-S1346-18 Halliburton Friction Reducer Inert Ingredient(s) Not Available 100 0.0448 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-09-29 2019-10-20 Surface Water - River 31301

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 298 0.0 0.0 0.0
2020 2112 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-11 Lost Circulation 1100.00 1649.00
2019-11-10 No Incident Encountered 0.00 0.00

For data sources see[10]

References