X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615191013020

Well Details

Well ID: 0615191013020
Loading map...
Location: 02/13-10-061-19W5/0
Location Alias: 02/13-10-61-19 W5M
Location Alias 2: 02/13-10-061-19 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 19
Section: 10
County/Municipality: Municipal District of Greenview No. 16
Well Name: TANGLE CREEK HZ KAYBOBS 13-10-61-19
Operator Name: Tangle Creek Energy Ltd.
License Number: 0436927
License Date: 2011-09-19
License Status: Issued
Spud Date: 2011-09-30
Final Drill Date: 2011-10-14
Well Total Depth: 3300.00 m
Surface Hole Latitude: 54.251995
Surface Hole Longitude: -116.773365

For data sources see[1][2]

Well History

Date Event
2011-09-19 Obtained License
2011-10-03 Surface Casing Operation Performed
2011-10-05 Direction Drilling Operation Performed - Horizontal
2011-10-09 Intermediate Casing Operation Performed
2011-10-14 Finished Drilling
2011-10-14 Well Mode changed to Drilled and Cased
2011-10-16 Liner Casing Operation Performed
2011-10-17 Rig Released
2011-10-20 Perforation Treatment Performed - Open-Hole Completion
2011-10-20 Well Began Production
2011-10-20 Well Fluid changed to Crude Oil
2011-10-20 Well Log Performed
2011-10-20 Well Mode changed to Flowing
2011-10-25 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-26 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-20 Well Fluid changed to Crude Oil
2011-11-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-05 1363.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-20 Open Hole/Barefoot Completion 1949.00 3300.00 0
2011-10-26 Multi-Stage Fracture 2627.00 2699.90 0
2011-10-26 Multi-Stage Fracture 2553.90 2627.00 0
2011-10-26 Multi-Stage Fracture 2480.50 2553.90 0
2011-10-26 Multi-Stage Fracture 2396.30 2480.50 0
2011-10-26 Multi-Stage Fracture 2323.00 2396.30 0
2011-10-26 Multi-Stage Fracture 2249.10 2323.00 0
2011-10-26 Multi-Stage Fracture 2175.70 2249.10 0
2011-10-26 Multi-Stage Fracture 2102.80 2175.70 0
2011-10-26 Multi-Stage Fracture 2028.90 2102.80 0
2011-10-26 Multi-Stage Fracture 1949.00 2028.90 0
2011-10-25 Multi-Stage Fracture 3235.00 3300.00 0
2011-10-25 Multi-Stage Fracture 3146.30 3219.00 0
2011-10-25 Multi-Stage Fracture 3074.10 3146.30 0
2011-10-25 Multi-Stage Fracture 3001.30 3074.10 0
2011-10-25 Multi-Stage Fracture 2929.00 3001.30 0
2011-10-25 Multi-Stage Fracture 2844.70 2929.00 0
2011-10-25 Multi-Stage Fracture 2772.30 2844.70 0
2011-10-26 Multi-Stage Fracture 2699.90 2772.30 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 8 0.0 0.0 0.0
2012 4780 0.0 0.0 0.0
2013 7344 0.0 0.0 0.0
2014 7819 0.0 0.0 0.0
2015 8370 0.0 0.0 0.0
2016 8367 0.0 0.0 0.0
2017 7747 0.0 0.0 0.0
2018 6544 0.0 0.0 0.0
2019 8035 0.0 0.0 0.0
2020 1571 0.0 0.0 0.0

For data sources see[6]

References