X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615183313020

Well Details

Well ID: 0615183313020
Loading map...
Location: 02/13-33-061-18W5/0
Location Alias: 02/13-33-61-18 W5M
Location Alias 2: 02/13-33-061-18 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 18
Section: 33
County/Municipality: Municipal District of Greenview No. 16
Well Name: SDEL HZ 102 FOXCK 13-33-61-18
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0446724
License Date: 2012-06-22
License Status: Suspension
Spud Date: 2012-07-24
Final Drill Date: 2012-08-04
Well Total Depth: 3500.00 m
Surface Hole Latitude: 54.323889
Surface Hole Longitude: -116.624905

For data sources see[1][2]

Well History

Date Event
2012-06-22 Obtained License
2012-07-24 Lost Circulation Occurred
2012-07-27 Surface Casing Operation Performed
2012-07-27 Well Log Performed
2012-07-29 Direction Drilling Operation Performed - Deviate
2012-07-31 Direction Drilling Operation Performed - Horizontal
2012-08-04 Finished Drilling
2012-08-04 Well Log Performed
2012-08-04 Well Mode changed to Drilled and Cased
2012-08-05 Well Log Performed
2012-08-06 Production Casing Operation Performed
2012-08-06 Rig Released
2012-09-16 Well Log Performed
2012-09-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-09-23 Perforation Treatment Performed - Open-Hole Completion
2012-09-24 Perforation Treatment Performed - Multi-Stage Fracture
2013-04-19 Well Began Production
2013-04-19 Well Fluid changed to Gas
2013-04-19 Well Mode changed to Flowing
2015-02-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-02-19 Plug Back Performed
2015-02-19 Well Fluid changed to Gas
2015-02-19 Well Mode changed to Abandoned Zone

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-24 Savanna Drilling Corp. 614 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-07-29 1807.60 Deviate (5 - 79 degrees)
2012-07-31 2158.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-09-23 Open Hole/Barefoot Completion 3495.00 3500.00 0
2012-09-23 Multi-Stage Fracture 2747.20 2747.30 0
2012-09-23 Multi-Stage Fracture 2649.00 2649.10 0
2012-09-23 Multi-Stage Fracture 2565.00 2565.10 0
2012-09-23 Multi-Stage Fracture 2480.40 2480.50 0
2012-09-24 Multi-Stage Fracture 2382.20 2382.30 0
2012-09-24 Multi-Stage Fracture 2297.30 2297.40 0
2012-09-24 Multi-Stage Fracture 2198.60 2198.70 0
2015-02-19 Packing Device Capped w/Cement 2119.00 2141.00 0
2012-09-23 Multi-Stage Fracture 3457.00 3457.10 0
2012-09-23 Multi-Stage Fracture 3378.40 3378.50 0
2012-09-23 Multi-Stage Fracture 3280.50 3280.60 0
2012-09-23 Multi-Stage Fracture 3196.00 3196.10 0
2012-09-23 Multi-Stage Fracture 3111.40 3111.50 0
2012-09-23 Multi-Stage Fracture 3013.60 3013.70 0
2012-09-23 Multi-Stage Fracture 2928.90 2929.00 0
2012-09-23 Multi-Stage Fracture 2831.80 2831.90 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 4538 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-07-24 Lost Circulation 75.00 82.00
2012-09-29 No Incident Encountered 0.00 0.00
2015-02-21 No Incident Encountered 0.00 0.00

For data sources see[8]

References