X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615160201002

Well Details

Well ID: 0615160201002
Loading map...
Location: 00/01-02-061-16W5/2
Location Alias: 00/01-02-61-16 W5M
Location Alias 2: 00/01-02-061-16 W5/02
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 16
Section: 02
County/Municipality: Municipal District of Greenview No. 16
Well Name: TIDEWATER WIND 1-2-61-16
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0065593
License Date: 1977-09-07
License Status: Suspension
Spud Date: 1977-09-27
Final Drill Date: 1977-12-10
Well Total Depth: 2709.70 m
Surface Hole Latitude: 54.244905
Surface Hole Longitude: -116.288151

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-09-07 Obtained License
1977-09-27 Direction Drilling Operation Performed - 98
1977-12-10 Finished Drilling
1977-12-10 Lost Circulation Occurred
1977-12-10 Well Mode changed to Drilled and Cased
1977-12-14 Production Casing Operation Performed
1978-01-06 Perforation Treatment Performed - Jet Perforation
1978-01-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-01-10 Perforation Treatment Performed - Jet Perforation
1978-01-11 Perforation Treatment Performed - Jet Perforation
1978-01-12 Perforation Treatment Performed - Acid Wash - No Pressure
1991-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-10-19 Perforation Treatment Performed - Cement Squeeze
1991-10-19 Plug Back Performed
1991-10-22 Perforation Treatment Performed - Jet Perforation
1991-10-22 Well Log Performed
1992-10-20 Well Began Production
1992-10-20 Well Fluid changed to Gas
1992-10-20 Well Mode changed to Flowing
2007-12-01 Well Fluid changed to Gas
2007-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1977-09-27 2142.40 Conversion

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-01-06 Perforation 2653.60 2654.80 7
1991-10-22 Perforation 1920.00 1930.00 13
1978-01-07 Acid Treatment 2653.60 2654.80 0
1978-01-10 Perforation 2645.10 2647.50 7
1978-01-10 Perforation 2633.50 2635.30 7
1978-01-10 Perforation 2636.50 2637.40 7
1978-01-11 Perforation 2625.90 2628.90 7
1978-01-12 Acid Wash 2625.90 2647.50 0
1991-10-19 Cement Squeeze 2625.90 2654.80 0
1991-10-19 Packing Device Capped w/Cement 2602.00 2611.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 342 0.0 0.0 0.0
1993 1359 0.0 0.0 0.0
2006 4155 0.0 0.0 0.0
2007 6732 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-12-10 Lost Circulation 2636.50 2636.50

For data sources see[7]

References