X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615160103000

Well Details

Well ID: 0615160103000
Loading map...
Location: 00/03-01-061-16W5/0
Location Alias: 00/03-01-61-16 W5M
Location Alias 2: 00/03-01-061-16 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 16
Section: 01
County/Municipality: Woodlands County
Well Name: TIDEWATER WIND 3-1-61-16
Operator Name: Tidewater Midstream and Infrastructure Ltd.
License Number: 0030873
License Date: 1966-08-25
License Status: Abandoned
Spud Date: 1966-09-03
Final Drill Date: 1966-09-28
Well Total Depth: 2567.90 m
Surface Hole Latitude: 54.241489
Surface Hole Longitude: -116.267119

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-25 Obtained License
1966-09-11 Drill Stem Test Performed
1966-09-28 Finished Drilling
1966-09-28 Well Mode changed to Drilled and Cased
1966-09-29 Production Casing Operation Performed
1966-10-06 Perforation Treatment Performed - Selective Jet Perforations
1966-10-12 Perforation Treatment Performed - Jet Perforation
1966-10-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-12-12 Perforation Treatment Performed - Jet Perforation
1966-12-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1967-02-01 Well Fluid changed to Gas
1967-02-01 Well Mode changed to Testing
1974-11-01 Well Began Production
1974-11-01 Well Fluid changed to Gas
1974-11-01 Well Mode changed to Flowing
1974-11-06 Well Fluid changed to Gas
1974-11-06 Well Mode changed to Suspended
1975-10-21 Perforation Treatment Performed - Jet Perforation
1975-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-22 Perforation Treatment Performed - Acid Wash - No Pressure
2000-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-05 Plug Back Performed
2000-07-05 Well Fluid changed to Gas
2000-07-05 Well Log Performed
2000-07-05 Well Mode changed to Abandoned Zone
2000-07-08 Well Log Performed
2000-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-10 Perforation Treatment Performed - Cement Squeeze
2000-07-10 Perforation Treatment Performed - Jet Perforation
2000-07-10 Plug Back Performed
2000-07-10 Well Log Performed
2000-07-14 Perforation Treatment Performed - Jet Perforation
2000-07-14 Well Log Performed
2000-07-18 Perforation Treatment Performed - Jet Perforation
2000-07-18 Well Log Performed
2000-07-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-07-19 Plug Back Performed
2000-07-19 Well Log Performed
2002-03-23 Well Log Performed
2002-03-25 Perforation Treatment Performed - Jet Perforation
2002-03-25 Well Log Performed
2002-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-26 Perforation Treatment Performed - Remedial Casing
2002-03-27 Perforation Treatment Performed - Jet Perforation
2002-03-27 Well Log Performed
2002-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-03-28 Perforation Treatment Performed - Remedial Casing
2002-06-08 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-06 Selective Jet Perforations 2521.00 2521.60 0
1966-12-15 Acid Treatment 2521.00 2533.80 0
1975-10-21 Perforation 1451.20 1452.40 7
1975-10-21 Perforation 1453.60 1455.70 7
1975-10-22 Acid Wash 1451.20 1455.70 0
1975-10-22 Acid Treatment 1451.20 1455.70 0
2000-07-05 Packing Device Capped w/Cement 2482.00 2490.00 0
2000-07-10 Packing Device Capped w/Cement 1435.00 1443.00 0
2000-07-10 Perforation 870.00 871.00 20
2000-07-10 Cement Squeeze 870.00 871.00 0
2000-07-14 Perforation 823.10 832.10 20
1966-10-06 Selective Jet Perforations 2522.20 2522.80 0
2000-07-18 Perforation 777.00 788.00 20
2000-07-19 Packing Device Capped w/Cement 764.00 772.00 0
2002-03-25 Perforation 468.00 469.00 14
2002-03-26 Remedial Casing Cementing 468.00 469.00 0
2002-03-26 Packing Device Capped w/Cement 449.00 458.00 0
2002-03-27 Perforation 306.00 307.00 14
2002-03-28 Remedial Casing Cementing 306.00 307.00 0
2002-03-28 Packing Device Capped w/Cement 291.00 300.00 0
1966-10-06 Selective Jet Perforations 2523.40 2523.70 0
1966-10-06 Selective Jet Perforations 2525.00 2525.30 0
1966-10-12 Perforation 2521.00 2521.90 7
1966-10-12 Perforation 2525.00 2526.20 7
1966-10-14 Acid Treatment 2521.00 2526.20 0
1966-10-20 Acid Treatment 2521.00 2526.20 0
1966-12-12 Perforation 2527.40 2533.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1967 0 0.0 0.0 0.0
1974 101 0.0 0.0 0.0

For data sources see[5]

References