If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0615150411000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.248913,"lon":-116.1929,"icon":""}]} |
Location: 00/11-04-061-15W5/0 | |
Location Alias: 00/11-04-61-15 W5M | |
Location Alias 2: 00/11-04-061-15 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 5 | |
Range: 15 | |
Section: 04 | |
County/Municipality: Woodlands County | |
Well Name: TIDEWATER WIND 11-4-61-15 | |
Operator Name: Tidewater Midstream and Infrastructure Ltd. | |
License Number: 0056757 | |
License Date: 1976-01-23 | |
License Status: Abandoned | |
Spud Date: 1976-02-18 | |
Final Drill Date: 1976-03-17 | |
Well Total Depth: 2728.30 m | |
Surface Hole Latitude: 54.248913 | |
Surface Hole Longitude: -116.192900 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1976-01-23 | Obtained License |
1976-02-19 | Lost Circulation Occurred |
1976-03-10 | Lost Circulation Occurred |
1976-03-15 | Drill Stem Test Performed |
1976-03-17 | Finished Drilling |
1976-03-17 | Well Mode changed to Drilled and Cased |
1976-03-19 | Drill Stem Test Performed |
1976-03-20 | Drill Stem Test Performed |
1976-03-21 | Drill Stem Test Performed |
1976-03-23 | Production Casing Operation Performed |
1976-06-03 | Perforation Treatment Performed - Jet Perforation |
1976-06-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1976-06-13 | Well Began Production |
1976-06-13 | Well Fluid changed to Crude Oil |
1976-06-13 | Well Mode changed to Flowing |
1976-06-21 | Perforation Treatment Performed - Condensate Squeeze |
1976-06-21 | Well Fluid changed to Crude Oil |
1976-06-21 | Well Mode changed to Suspended |
1977-02-18 | Well Fluid changed to Crude Oil |
1977-02-18 | Well Mode changed to Flowing |
1977-03-31 | Well Fluid changed to Crude Oil |
1977-03-31 | Well Mode changed to Suspended |
1978-08-15 | Well Fluid changed to Crude Oil |
1978-08-15 | Well Mode changed to Gas Lift |
1985-05-01 | Well Fluid changed to Crude Oil |
1985-05-01 | Well Mode changed to Suspended |
1991-11-05 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-11-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1991-11-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1991-11-14 | Perforation Treatment Performed - Cement Squeeze |
1991-11-14 | Plug Back Performed |
1991-11-14 | Well Abandoned |
1991-11-14 | Well Fluid changed to Crude Oil |
1991-11-14 | Well Mode changed to Abandoned |
1996-03-31 | Perforation Treatment Performed - Jet Perforation |
1996-03-31 | Well Log Performed |
1996-04-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-04-01 | Perforation Treatment Performed - Remedial Casing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1976-06-03 | Perforation | 2670.00 | 2671.00 | 7 |
1996-04-01 | Remedial Casing Cementing | 625.00 | 626.00 | 0 |
1996-04-01 | Packing Device Capped w/Cement | 594.00 | 609.00 | 0 |
1976-06-03 | Perforation | 2671.60 | 2672.50 | 7 |
1976-06-08 | Acid Treatment | 2670.00 | 2672.50 | 0 |
1976-06-21 | Condensate Squeeze | 2670.00 | 2672.50 | 0 |
1991-11-05 | Acid Treatment | 2670.00 | 2672.50 | 0 |
1991-11-13 | Acid Treatment | 2670.00 | 2672.50 | 0 |
1991-11-14 | Cement Squeeze | 2670.00 | 2672.50 | 0 |
1991-11-14 | Packing Device Capped w/Cement | 2531.00 | 2650.00 | 0 |
1996-03-31 | Perforation | 625.00 | 626.00 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1976 | 97 | 0.0 | 0.0 | 0.0 |
1977 | 240 | 0.0 | 0.0 | 0.0 |
1978 | 1856 | 0.0 | 0.0 | 0.0 |
1979 | 7051 | 0.0 | 0.0 | 0.0 |
1980 | 7516 | 0.0 | 0.0 | 0.0 |
1981 | 7499 | 0.0 | 0.0 | 0.0 |
1982 | 5102 | 0.0 | 0.0 | 0.0 |
1983 | 4369 | 0.0 | 0.0 | 0.0 |
1984 | 1488 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1976-02-19 | Lost Circulation | 75.00 | 135.60 |
1976-03-10 | Lost Circulation | 2671.00 | 2671.00 |
For data sources see[6]