X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615122807000

Well Details

Well ID: 0615122807000
Loading map...
Location: 00/07-28-061-12W5/0
Location Alias: 00/07-28-61-12 W5M
Location Alias 2: 00/07-28-061-12 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 12
Section: 28
County/Municipality: Woodlands County
Well Name: ACCEL HOLDINGS CARSON 7-28-61-12
Operator Name: ACCEL Canada Holdings Limited
License Number: 0021175
License Date: 1961-08-09
License Status: Suspension
Spud Date: 1961-08-09
Final Drill Date: 1961-09-07
Well Total Depth: 2672.20 m
Surface Hole Latitude: 54.303167
Surface Hole Longitude: -115.735486

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1961-08-09 Lost Circulation Occurred
1961-08-09 Obtained License
1961-09-07 Finished Drilling
1961-09-08 Drill Stem Test Performed
1961-09-09 Drill Stem Test Performed
1961-09-11 Production Casing Operation Performed
1961-10-05 Well Mode changed to Drilled and Cased
1961-11-03 Perforation Treatment Performed - Jet Perforation
1961-11-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-12-11 Perforation Treatment Performed - Jet Perforation
1962-12-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1962-12-21 Perforation Treatment Performed - Jet Perforation
1963-01-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-01-25 Well Began Production
1963-01-25 Well Fluid changed to Gas
1963-01-25 Well Mode changed to Flowing
1966-12-28 Well Fluid changed to Gas
1966-12-28 Well Mode changed to Suspended
1968-10-08 Well Began Injection
1968-10-08 Well Fluid changed to Water
1968-10-08 Well Type changed to Disposal
1970-05-06 Well Fluid changed to Water
1970-05-06 Well Mode changed to Suspended
1970-05-06 Well Type changed to Disposal
1977-01-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-01-02 Perforation Treatment Performed - Jet Perforation
1978-07-31 Perforation Treatment Performed - Jet Perforation
1978-08-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-08-12 Perforation Treatment Performed - Cement Squeeze
1978-08-12 Perforation Treatment Performed - Jet Perforation
1978-08-19 Perforation Treatment Performed - Jet Perforation
1978-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-08-01 Well Fluid changed to Gas
1979-08-01 Well Mode changed to Flowing
1980-01-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-12-12 Perforation Treatment Performed - Cement Squeeze
1980-12-21 Well Log Performed
1981-01-04 Perforation Treatment Performed - Jet Perforation
1981-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-10-12 Perforation Treatment Performed - Jet Perforation
1989-10-12 Well Log Performed
1993-08-24 Perforation Treatment Performed - Acid Wash - No Pressure
1993-08-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-11-01 Well Fluid changed to Gas
1993-11-01 Well Mode changed to Suspended
2001-09-15 Well Log Performed
2001-10-02 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-10-02 Perforation Treatment Performed - Cement Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1961-11-03 Perforation 2575.00 2578.00 7
1963-01-04 Acid Treatment 2575.00 2590.20 0
1977-01-02 Perforation 2609.10 2611.20 7
1977-01-02 Perforation 2613.40 2615.50 7
1977-01-02 Perforation 2624.30 2629.20 7
1977-01-02 Acid Treatment 2609.10 2615.50 0
1978-07-31 Perforation 2603.90 2606.00 7
1978-08-03 Acid Treatment 2603.90 2606.00 0
1978-08-12 Cement Squeeze 2603.90 2615.50 0
1978-08-12 Perforation 2604.20 2605.40 13
1978-08-12 Acid Treatment 2604.20 2605.40 0
1961-11-03 Perforation 2579.20 2583.50 7
1978-08-19 Perforation 2609.10 2611.20 13
1978-08-20 Acid Treatment 2604.20 2611.20 0
1980-01-01 Acid Treatment 2575.00 2590.20 0
1980-12-12 Cement Squeeze 2604.20 2611.20 0
1981-01-04 Perforation 2575.00 2578.00 7
1981-01-04 Perforation 2579.20 2583.80 7
1981-01-04 Perforation 2585.30 2586.50 7
1981-01-04 Perforation 2587.80 2590.20 7
1981-01-06 Acid Treatment 2575.00 2590.20 0
1989-10-12 Perforation 2575.00 2578.00 7
1961-11-03 Perforation 2585.30 2586.20 7
1989-10-12 Perforation 2579.20 2585.30 7
1993-08-24 Acid Wash 2575.00 2590.20 0
1993-08-25 Acid Treatment 2575.00 2590.20 0
2001-10-02 Cement Squeeze 2575.00 2578.00 0
2001-10-02 Cement Squeeze 2579.20 2583.80 0
2001-10-02 Cement Squeeze 2585.30 2586.50 0
2001-10-02 Cement Squeeze 2587.80 2590.20 0
2001-10-02 Bridge Plug, No Cement 2554.50 2556.60 0
1961-11-03 Perforation 2587.80 2590.20 7
1961-11-04 Acid Treatment 2575.00 2590.20 0
1962-12-11 Perforation 2609.10 2611.20 7
1962-12-11 Perforation 2613.40 2615.50 7
1962-12-21 Perforation 2624.30 2629.20 7
1962-12-21 Packing Device Capped w/Cement 2600.90 2600.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1979 361 0.0 0.0 0.0
1980 4166 0.0 0.0 0.0
1981 3197 0.0 0.0 0.0
1982 7326 0.0 0.0 0.0
1983 6769 0.0 0.0 0.0
1984 7802 0.0 0.0 0.0
1985 7348 0.0 0.0 0.0
1986 8356 0.0 0.0 0.0
1987 8073 0.0 0.0 0.0
1988 8494 0.0 0.0 0.0
1989 7809 0.0 0.0 0.0
1990 5766 0.0 0.0 0.0
1991 8020 0.0 0.0 0.0
1992 5176 0.0 0.0 0.0
1993 523 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1961-08-09 Lost Circulation 50.30 50.30

For data sources see[6]

References