X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615112912000

Well Details

Well ID: 0615112912000
Loading map...
Location: 00/12-29-061-11W5/0
Location Alias: 00/12-29-61-11 W5M
Location Alias 2: 00/12-29-061-11 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 11
Section: 29
County/Municipality: Woodlands County
Well Name: 1976082 CARSONN 12-29-61-11
Operator Name: Razor Energy Corp.
License Number: 0112921
License Date: 1985-01-29
License Status: Suspension
Spud Date: 1985-02-14
Final Drill Date: 1985-03-05
Well Total Depth: 2660.00 m
Surface Hole Latitude: 54.305584
Surface Hole Longitude: -115.624794

For data sources see[1][2]

Well History

Date Event
1985-01-29 Obtained License
1985-02-15 Surface Casing Operation Performed
1985-03-05 Finished Drilling
1985-03-05 Well Mode changed to Drilled and Cased
1985-03-06 Well Log Performed
1985-03-08 Drill Stem Test Performed
1985-03-09 Drill Stem Test Performed
1985-03-10 Lost Circulation Occurred
1985-03-14 Production Casing Operation Performed
1985-03-14 Rig Released
1985-03-14 Well Log Performed
1985-07-16 Well Log Performed
1985-07-20 Perforation Treatment Performed - Open-Hole Completion
1985-07-20 Plug Back Performed
1985-07-22 Perforation Treatment Performed - Jet Perforation
1985-08-01 Well Began Production
1985-08-01 Well Fluid changed to Crude Oil
1985-08-01 Well Mode changed to Pumping
1986-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-02-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-01-19 Well Fluid changed to Crude Oil
1999-01-19 Well Mode changed to Suspended
1999-03-01 Well Fluid changed to Crude Oil
1999-03-01 Well Mode changed to Pumping
1999-07-01 Well Fluid changed to Crude Oil
1999-07-01 Well Mode changed to Suspended
2000-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-10 Plug Back Performed
2000-09-10 Well Fluid changed to Crude Oil
2000-09-10 Well Mode changed to Abandoned Zone
2000-09-11 Perforation Treatment Performed - Jet Perforation
2000-09-11 Well Log Performed
2000-09-13 Perforation Treatment Performed - Fractured
2011-02-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-20 Open Hole/Barefoot Completion 2629.00 2634.50 0
1985-07-22 Perforation 2630.00 2633.00 13
1986-12-08 Acid Treatment 2629.00 2634.50 0
1993-02-17 Acid Treatment 2629.00 2634.50 0
2000-09-10 Packing Device Capped w/Cement 2599.00 2607.00 0
2000-09-11 Perforation 1636.00 1638.50 17
2000-09-13 Fracture 1636.00 1638.50 0
2011-02-04 Packing Device Capped w/Cement 1618.00 1626.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3516 0.0 0.0 0.0
1986 6890 0.0 0.0 0.0
1987 7519 0.0 0.0 0.0
1988 6355 0.0 0.0 0.0
1989 6828 0.0 0.0 0.0
1990 8256 0.0 0.0 0.0
1991 8488 0.0 0.0 0.0
1992 8586 0.0 0.0 0.0
1993 8263 0.0 0.0 0.0
1994 7055 0.0 0.0 0.0
1995 8759 0.0 0.0 0.0
1996 963 0.0 0.0 0.0
1997 456 0.0 0.0 0.0
1998 1562 0.0 0.0 0.0
1999 1224 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1985-03-10 Lost Circulation 2660.00 2660.00

For data sources see[6]

References