X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615082505000

Well Details

Well ID: 0615082505000
Loading map...
Location: 00/05-25-061-08W5/0
Location Alias: 00/05-25-61-08 W5M
Location Alias 2: 00/05-25-061-08 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 08
Section: 25
County/Municipality: Woodlands County
Well Name: MOBIL OIL-CORBETT CREEK #25-5
Operator Name: ExxonMobil Canada Ltd.
License Number: 0009983
License Date: 1955-08-12
License Status: RecExempt
Spud Date: 1955-08-20
Final Drill Date: 1955-10-17
Well Total Depth: 2139.70 m
Surface Hole Latitude: 54.302693
Surface Hole Longitude: -115.072984

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-08-12 Obtained License
1955-08-28 Drill Stem Test Performed
1955-08-29 Drill Stem Test Performed
1955-09-01 Drill Stem Test Performed
1955-09-03 Drill Stem Test Performed
1955-09-09 Drill Stem Test Performed
1955-09-11 Drill Stem Test Performed
1955-09-12 Drill Stem Test Performed
1955-09-13 Drill Stem Test Performed
1955-09-15 Drill Stem Test Performed
1955-09-16 Drill Stem Test Performed
1955-09-21 Drill Stem Test Performed
1955-09-25 Drill Stem Test Performed
1955-09-29 Drill Stem Test Performed
1955-10-01 Drill Stem Test Performed
1955-10-17 Finished Drilling
1955-10-17 Well Mode changed to Drilled and Cased
1955-10-21 Drill Stem Test Performed
1955-10-23 Production Casing Operation Performed
1955-10-24 Perforation Treatment Performed - Bullet Perforation
1955-10-24 Perforation Treatment Performed - Jet Perforation
1955-10-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-10-29 Perforation Treatment Performed - Cement Squeeze
1955-11-01 Perforation Treatment Performed - Bullet Perforation
1955-11-01 Perforation Treatment Performed - Jet Perforation
1955-11-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-11-04 Perforation Treatment Performed - Bullet Perforation
1955-11-04 Perforation Treatment Performed - Jet Perforation
1955-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1955-11-06 Perforation Treatment Performed - Bullet Perforation
1955-11-06 Perforation Treatment Performed - Jet Perforation
1955-11-08 Perforation Treatment Performed - Bullet Perforation
1955-11-08 Perforation Treatment Performed - Jet Perforation
1955-11-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1955-11-13 Perforation Treatment Performed - Bullet Perforation
1955-11-15 Perforation Treatment Performed - Fractured
1955-11-15 Perforation Treatment Performed - Jet Perforation
1955-12-04 Well Fluid changed to Crude Oil
1955-12-04 Well Mode changed to Potential
1955-12-05 Perforation Treatment Performed - Cement Squeeze
1955-12-05 Well Abandoned
1955-12-05 Well Fluid changed to Crude Oil
1955-12-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1955-10-24 Bullet Perforation 1317.00 1318.60 7
1955-11-04 Perforation 1091.80 1094.80 13
1955-11-06 Packing Device Capped w/Cement 1088.10 1088.10 0
1955-11-06 Bullet Perforation 1069.20 1071.40 7
1955-11-06 Perforation 1069.20 1071.40 13
1955-11-08 Bullet Perforation 1046.70 1051.00 7
1955-11-08 Perforation 1046.70 1051.00 13
1955-11-10 Acid Treatment 1046.70 1051.00 0
1955-11-11 Acid Treatment 1046.70 1051.00 0
1955-11-13 Bullet Perforation 1041.50 1043.30 7
1955-11-15 Perforation 1041.50 1043.30 13
1955-10-24 Perforation 1317.00 1318.60 13
1955-11-15 Fracture 1041.50 1043.30 0
1955-12-05 Cement Squeeze 1041.50 1071.40 0
1955-10-27 Acid Treatment 1317.00 1318.60 0
1955-10-29 Cement Squeeze 1317.00 1318.60 0
1955-11-01 Bullet Perforation 1307.30 1309.10 7
1955-11-01 Perforation 1307.30 1309.10 13
1955-11-02 Acid Treatment 1307.30 1309.10 0
1955-11-04 Packing Device Capped w/Cement 1161.90 1309.10 0
1955-11-04 Bullet Perforation 1091.80 1094.80 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References