X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0615022611000

Well Details

Well ID: 0615022611000
Loading map...
Location: 00/11-26-061-02W5/0
Location Alias: 00/11-26-61-02 W5M
Location Alias 2: 00/11-26-061-02 W5/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 5
Range: 02
Section: 26
County/Municipality: Westlock County
Well Name: VIKING GOODRIDGE 11-26-61-2
Operator Name: Tamarack Acquisition Corp.
License Number: 0067013
License Date: 1977-11-25
License Status: Re-Entered
Spud Date: 1977-12-05
Final Drill Date: 1977-12-11
Well Total Depth: 944.90 m
Surface Hole Latitude: 54.307927
Surface Hole Longitude: -114.195172

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-11-25 Obtained License
1977-12-11 Finished Drilling
1977-12-11 Lost Circulation Occurred
1977-12-12 Kick Occurred
1977-12-13 Production Casing Operation Performed
1977-12-13 Well Mode changed to Drilled and Cased
1982-06-17 Perforation Treatment Performed - Jet Perforation
1982-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-19 Perforation Treatment Performed - Jet Perforation
1983-11-01 Well Began Production
1983-11-01 Well Fluid changed to Gas
1983-11-01 Well Mode changed to Flowing
1990-10-16 Well Fluid changed to Gas
1990-10-16 Well Mode changed to Suspended
1991-07-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-07-10 Plug Back Performed
1991-07-10 Well Abandoned
1991-07-10 Well Fluid changed to Gas
1991-07-10 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-06-17 Perforation 745.20 746.70 10
1982-06-18 Packing Device Capped w/Cement 728.00 732.00 0
1982-06-19 Perforation 716.20 718.70 10
1991-07-10 Packing Device Capped w/Cement 699.00 709.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1983 1451 0.0 0.0 0.0
1984 2791 0.0 0.0 0.0
1985 4266 0.0 0.0 0.0
1986 4042 0.0 0.0 0.0
1987 3595 0.0 0.0 0.0
1988 5897 0.0 0.0 0.0
1989 4125 0.0 0.0 0.0
1990 2192 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1977-12-11 Lost Circulation 944.80 944.80
1977-12-12 Kick 944.90 944.90

For data sources see[6]

References