X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614223406000

Well Details

Well ID: 0614223406000
Loading map...
Location: 00/06-34-061-22W4/0
Location Alias: 00/06-34-61-22 W4M
Location Alias 2: 00/06-34-061-22 W4/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 22
Section: 34
County/Municipality: Thorhild County
Well Name: BONANZA(89) ET AL ABEE 6-34-61-22
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0085249
License Date: 1980-08-27
License Status: Abandoned
Spud Date: 1980-08-31
Final Drill Date: 1980-09-07
Well Total Depth: 855.00 m
Surface Hole Latitude: 54.317111
Surface Hole Longitude: -113.216492

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-08-27 Obtained License
1980-09-04 Drill Stem Test Performed
1980-09-05 Drill Stem Test Performed
1980-09-07 Finished Drilling
1980-09-07 Well Log Performed
1980-09-07 Well Mode changed to Drilled and Cased
1980-09-08 Drill Stem Test Performed
1980-09-09 Production Casing Operation Performed
1980-10-23 Perforation Treatment Performed - Jet Perforation
1980-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1980-10-28 Perforation Treatment Performed - Jet Perforation
1981-01-31 Well Began Production
1981-01-31 Well Fluid changed to Gas
1981-01-31 Well Mode changed to Flowing
1987-05-08 Well Fluid changed to Gas
1987-05-08 Well Mode changed to Suspended
1999-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-07-22 Plug Back Performed
1999-07-22 Well Log Performed
1999-08-04 Well Abandoned
1999-08-04 Well Fluid changed to Gas
1999-08-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-10-23 Perforation 823.50 824.70 7
1980-10-27 Packing Device Capped w/Cement 812.30 817.00 0
1980-10-28 Perforation 794.00 796.50 7
1999-07-22 Packing Device Capped w/Cement 781.00 789.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 7212 0.0 0.0 0.0
1982 5957 0.0 0.0 0.0
1983 4018 0.0 0.0 0.0
1984 3974 0.0 0.0 0.0
1985 4181 0.0 0.0 0.0
1986 685 0.0 0.0 0.0
1987 629 0.0 0.0 0.0

For data sources see[5]

References