X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614151816000

Well Details

Well ID: 0614151816000
Loading map...
Location: 00/16-18-061-15W4/0
Location Alias: 00/16-18-61-15 W4M
Location Alias 2: 00/16-18-061-15 W4/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 15
Section: 18
County/Municipality: Smoky Lake County
Well Name: CNRL EDWAND 16-18-61-15
Operator Name: Canadian Natural Resources Limited
License Number: 0081278
License Date: 1980-02-22
License Status: Abandoned
Spud Date: 1980-03-01
Final Drill Date: 1980-03-04
Well Total Depth: 674.00 m
Surface Hole Latitude: 54.279205
Surface Hole Longitude: -112.231316

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-22 Obtained License
1980-03-04 Drill Stem Test Performed
1980-03-04 Finished Drilling
1980-03-05 Drill Stem Test Performed
1980-03-06 Drill Stem Test Performed
1980-03-07 Production Casing Operation Performed
1980-03-07 Well Mode changed to Drilled and Cased
1980-03-24 Perforation Treatment Performed - Jet Perforation
1980-03-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-02-24 Well Began Production
1998-02-24 Well Fluid changed to Gas
1998-02-24 Well Mode changed to Flowing
2003-07-31 Well Fluid changed to Gas
2003-07-31 Well Mode changed to Suspended
2010-11-16 Perforation Treatment Performed - Cement Squeeze
2010-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-17 Plug Back Performed
2010-11-17 Well Fluid changed to Gas
2010-11-17 Well Mode changed to Abandoned Zone
2010-11-19 Perforation Treatment Performed - Jet Perforation
2010-11-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-20 Perforation Treatment Performed - Remedial Casing
2011-06-01 Well Abandoned
2011-06-01 Well Fluid changed to Gas
2011-06-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-03-24 Perforation 642.00 646.00 13
1980-03-24 Perforation 646.00 648.00 13
1980-03-28 Acid Treatment 642.00 648.00 0
2010-11-16 Cement Squeeze 642.00 648.00 0
2010-11-17 Packing Device Capped w/Cement 628.00 636.00 0
2010-11-19 Perforation 281.00 284.00 14
2010-11-20 Remedial Casing Cementing 281.00 284.00 0
2010-11-20 Packing Device Capped w/Cement 265.00 273.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1998 7007 0.0 0.0 0.0
1999 8747 0.0 0.0 0.0
2000 8750 0.0 0.0 0.0
2001 6678 0.0 0.0 0.0

For data sources see[5]

References