X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614151410003

Well Details

Well ID: 0614151410003
Loading map...
Location: 00/10-14-061-15W4/3
Location Alias: 00/10-14-61-15 W4M
Location Alias 2: 00/10-14-061-15 W4/03
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 15
Section: 14
County/Municipality: Smoky Lake County
Well Name: BP BELLIS 10-14-61-15
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0081018
License Date: 1980-02-11
License Status: RecCertified
Spud Date: 1980-02-25
Final Drill Date: 1980-02-28
Well Total Depth: 633.00 m
Surface Hole Latitude: 54.278296
Surface Hole Longitude: -112.133236

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-11 Obtained License
1980-02-28 Finished Drilling
1980-03-02 Production Casing Operation Performed
1984-02-24 Perforation Treatment Performed - Jet Perforation
1989-01-02 Well Log Performed
1989-01-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-01-03 Plug Back Performed
1989-01-04 Perforation Treatment Performed - Jet Perforation
1989-01-04 Well Mode changed to Drilled and Cased
1989-01-13 Well Mode changed to Drilled and Cased
1989-02-01 Well Began Production
1989-02-01 Well Fluid changed to Gas
1989-02-01 Well Mode changed to Flowing
1998-01-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-26 Plug Back Performed
1998-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-01-27 Plug Back Performed
1998-01-27 Well Fluid changed to Gas
1998-01-27 Well Log Performed
1998-01-27 Well Mode changed to Abandoned Zone
1998-07-31 Well Abandoned
1998-07-31 Well Fluid changed to Gas
1998-07-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-02-24 Perforation 553.50 555.00 13
1984-02-24 Perforation 508.00 509.00 13
1984-02-24 Perforation 514.00 517.00 13
1989-01-03 Packing Device Capped w/Cement 534.00 542.00 0
1989-01-04 Perforation 467.40 468.80 13
1998-01-26 Packing Device Capped w/Cement 494.00 502.00 0
1998-01-27 Packing Device Capped w/Cement 449.00 457.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 7639 0.0 0.0 0.0
1990 4847 0.0 0.0 0.0
1992 2877 0.0 0.0 0.0
1993 4614 0.0 0.0 0.0
1994 3769 0.0 0.0 0.0
1995 1994 0.0 0.0 0.0
1996 4544 0.0 0.0 0.0

For data sources see[5]

References