If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0614042113AB0 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.293492,"lon":-110.549952,"icon":""}]} |
Location: AB/13-21-061-04W4/0 | |
Location Alias: AB/13-21-61-04 W4M | |
Location Alias 2: AB/13-21-061-04 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 061 | |
Meridian: 4 | |
Range: 04 | |
Section: 21 | |
County/Municipality: Municipal District of Bonnyville No. 87 | |
Well Name: CNRL H6E FTKENT EX 13-21-61-4 | |
Operator Name: Canadian Natural Resources Limited | |
License Number: 0096915 | |
License Date: 1982-08-04 | |
License Status: RecExempt | |
Spud Date: 1982-08-16 | |
Final Drill Date: 1982-08-18 | |
Well Total Depth: 411.00 m | |
Surface Hole Latitude: 54.293492 | |
Surface Hole Longitude: -110.549952 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-08-04 | Obtained License |
1982-08-18 | Finished Drilling |
1982-08-18 | Perforation Treatment Performed - Jet Perforation |
1982-08-18 | Production Casing Operation Performed |
1982-08-18 | Well Mode changed to Drilled and Cased |
1984-08-02 | Well Began Production |
1984-08-02 | Well Fluid changed to Crude Bitumen |
1984-08-02 | Well Type changed to Cyclical |
1988-12-21 | Well Fluid changed to Crude Bitumen |
1988-12-21 | Well Mode changed to Suspended |
1988-12-21 | Well Type changed to Cyclical |
1995-08-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1995-08-25 | Plug Back Performed |
1995-08-25 | Well Abandoned |
1995-08-25 | Well Fluid changed to Crude Bitumen |
1995-08-25 | Well Mode changed to Abandoned |
1995-08-25 | Well Type changed to Cyclical |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-08-18 | Perforation | 351.00 | 357.50 | 13 |
1982-08-18 | Perforation | 360.50 | 365.00 | 13 |
1982-08-18 | Perforation | 371.00 | 376.00 | 13 |
1995-08-25 | Packing Device Capped w/Cement | 290.00 | 340.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1982 | 0 | 0.0 | 0.0 | 0.0 |
1983 | 5184 | 0.0 | 0.0 | 0.0 |
1984 | 5790 | 0.0 | 0.0 | 0.0 |
1985 | 6720 | 0.0 | 0.0 | 0.0 |
1986 | 1880 | 0.0 | 0.0 | 0.0 |
For data sources see[5]