X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0614030916000

Well Details

Well ID: 0614030916000
Loading map...
Location: 00/16-09-061-03W4/0
Location Alias: 00/16-09-61-03 W4M
Location Alias 2: 00/16-09-061-03 W4/00
Country: Canada
Province: Alberta
Township: 061
Meridian: 4
Range: 03
Section: 09
County/Municipality: Municipal District of Bonnyville No. 87
Well Name: CNRES CHARLOTTE LAKE 16-9-61-3
Operator Name: Canadian Natural Resources Limited
License Number: 0186732
License Date: 1996-03-12
License Status: Abandoned
Spud Date: 1996-03-16
Final Drill Date: 1996-03-18
Well Total Depth: 510.00 m
Surface Hole Latitude: 54.264839
Surface Hole Longitude: -110.385181

For data sources see[1][2]

Well History

Date Event
1996-03-12 Obtained License
1996-03-17 Surface Casing Operation Performed
1996-03-18 Finished Drilling
1996-03-18 Well Log Performed
1996-03-18 Well Mode changed to Drilled and Cased
1996-03-19 Production Casing Operation Performed
1996-03-19 Rig Released
1996-03-21 Well Log Performed
1996-03-22 Perforation Treatment Performed - Jet Perforation
1996-03-22 Well Log Performed
1996-05-01 Well Began Production
1996-05-01 Well Fluid changed to Crude Bitumen
1996-05-01 Well Mode changed to Pumping
1996-08-18 Well Log Performed
1996-08-22 Perforation Treatment Performed - Jet Perforation
1996-08-26 Perforation Treatment Performed - Remedial Casing
2000-09-01 Well Fluid changed to Crude Bitumen
2000-09-01 Well Mode changed to Suspended
2012-04-09 Perforation Treatment Performed - Cement Plug
2012-04-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-04-10 Plug Back Performed
2012-04-10 Well Fluid changed to Crude Bitumen
2012-04-10 Well Mode changed to Abandoned Zone
2012-04-16 Well Abandoned
2012-04-16 Well Fluid changed to Crude Bitumen
2012-04-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-03-22 Perforation 362.00 364.00 26
1996-08-22 Perforation 375.00 377.00 13
1996-08-26 Remedial Casing Cementing 375.00 377.00 0
2012-04-09 Cement Plug 377.00 497.00 0
2012-04-10 Packing Device Capped w/Cement 364.00 372.00 0
2012-04-10 Packing Device Capped w/Cement 300.00 355.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2987 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-04-16 No Incident Encountered 0.00 0.00

For data sources see[6]

References