X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606042107032

Well Details

Well ID: 0606042107032
Loading map...
Location: 03/07-21-060-04W6/2
Location Alias: 03/07-21-60-04 W6M
Location Alias 2: 03/07-21-060-04 W6/02
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 04
Section: 21
County/Municipality: Municipal District of Greenview No. 16
Well Name: STRATH SMOKY 16-28-60-4
Operator Name: Strath Resources Ltd.
License Number: 0469453
License Date: 2014-08-28
License Status: Suspension
Spud Date: 2014-11-18
Final Drill Date: 2017-01-28
Well Total Depth: 5374.00 m
Surface Hole Latitude: 54.225228
Surface Hole Longitude: -118.530278

For data sources see[1][2]

Well History

Date Event
2014-08-28 Obtained License
2014-11-22 Surface Casing Operation Performed
2016-12-22 Intermediate Casing Operation Performed
2017-01-07 Intermediate Casing Operation Performed
2017-01-28 Direction Drilling Operation Performed - Horizontal
2017-01-28 Finished Drilling
2017-01-28 Well Log Performed
2017-01-28 Well Mode changed to Drilled and Cased
2017-02-01 Well Log Performed
2017-02-08 Liner Casing Operation Performed
2017-02-10 Rig Released
2017-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-01 Well Began Production
2017-03-01 Well Fluid changed to Gas
2017-03-01 Well Mode changed to Flowing
2017-05-01 Well Fluid changed to Gas
2017-05-01 Well Mode changed to Suspended
2018-02-01 Well Fluid changed to Gas
2018-02-01 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-01-28 604.30 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-02-24 Multi-Stage Fracture 5348.20 5348.30 0
2017-02-25 Multi-Stage Fracture 4707.10 4707.20 0
2017-02-25 Multi-Stage Fracture 4636.20 4636.30 0
2017-02-25 Multi-Stage Fracture 4565.30 4565.40 0
2017-02-25 Multi-Stage Fracture 4494.40 4494.50 0
2017-02-25 Multi-Stage Fracture 4423.50 4423.60 0
2017-02-25 Multi-Stage Fracture 4352.60 4352.70 0
2017-02-26 Multi-Stage Fracture 4282.30 4282.40 0
2017-02-26 Multi-Stage Fracture 4211.50 4211.60 0
2017-02-26 Multi-Stage Fracture 4140.60 4140.70 0
2017-02-26 Multi-Stage Fracture 4069.80 4069.90 0
2017-02-24 Multi-Stage Fracture 5273.50 5273.60 0
2017-02-26 Multi-Stage Fracture 3999.00 3999.10 0
2017-02-26 Multi-Stage Fracture 3928.10 3928.20 0
2017-02-26 Multi-Stage Fracture 3857.20 3857.30 0
2017-02-26 Multi-Stage Fracture 3786.70 3786.80 0
2017-02-26 Multi-Stage Fracture 3715.90 3716.00 0
2017-02-26 Multi-Stage Fracture 3665.00 3665.10 0
2017-02-26 Multi-Stage Fracture 3574.10 3574.20 0
2017-02-26 Multi-Stage Fracture 3503.30 3503.40 0
2017-02-26 Multi-Stage Fracture 3432.40 3432.50 0
2017-02-26 Multi-Stage Fracture 3361.80 3361.90 0
2017-02-24 Multi-Stage Fracture 5202.80 5202.90 0
2017-02-26 Multi-Stage Fracture 3291.30 3291.40 0
2017-02-26 Multi-Stage Fracture 3220.50 3220.60 0
2017-02-26 Multi-Stage Fracture 3149.60 3149.70 0
2017-02-25 Multi-Stage Fracture 5132.00 5132.10 0
2017-02-25 Multi-Stage Fracture 5061.00 5061.10 0
2017-02-25 Multi-Stage Fracture 4990.30 4990.40 0
2017-02-25 Multi-Stage Fracture 4920.00 4920.10 0
2017-02-25 Multi-Stage Fracture 4849.00 4849.10 0
2017-02-25 Multi-Stage Fracture 4778.10 4778.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-02-24 2017-02-26 2,955 11,827 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 85.25 N/A
40/70 Prime Plus Calfrac Quartz 14808-60-7 100 3.7559 N/A
40/70 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 9.3133 N/A
50/140 Sand (Domestic) Calfrac Crystalline silica (Quartz) 14808-60-7 100 1.3984 N/A
DWP-944 Calfrac Bactericide/Biocide Acetamide. 2.2-dibromo-2-cyano 10222-01-2 100 0.0109 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0109 N/A
DWP-913 Calfrac Clay Control Non-Hazardous Ingredients Trade Secret 100 0.0773 N/A
DWP-959 Calfrac Demulsifier Methanol 67-56-1 100 0.0826 N/A
Non-Hazardous Ingredients Trade Secret 100 0.0826 N/A
CalVisc Calfrac Friction Reducer Non-Hazardous Ingredients Trade Secret 100 0.0905 N/A
DAP-902 Calfrac Scale Inhibitor Non-Hazardous Ingredients Trade Secret 100 0.0207 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 528 0.0 0.0 0.0
2018 7523 0.0 0.0 0.0
2019 8433 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-12 No Incident Encountered 0.00 0.00
2017-02-26 No Incident Encountered 0.00 0.00

For data sources see[8]

References