If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0606040306025 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":54.14859,"lon":-118.503553,"icon":""}]} |
Location: 02/06-03-060-04W6/5 | |
Location Alias: 02/06-03-60-04 W6M | |
Location Alias 2: 02/06-03-060-04 W6/05 | |
Country: Canada | |
Province: Alberta | |
Township: 060 | |
Meridian: 6 | |
Range: 04 | |
Section: 03 | |
County/Municipality: Municipal District of Greenview No. 16 | |
Well Name: JUPITER 102 SMOKY 6-3-60-4 | |
Operator Name: Jupiter Resources Inc. | |
License Number: 0420531 | |
License Date: 2010-05-19 | |
License Status: Issued | |
Spud Date: 2010-06-13 | |
Final Drill Date: 2010-07-05 | |
Well Total Depth: 3940.00 m | |
Surface Hole Latitude: 54.148590 | |
Surface Hole Longitude: -118.503553 |
Date | Event |
---|---|
2010-05-19 | Obtained License |
2010-06-13 | Lost Circulation Occurred |
2010-06-14 | Direction Drilling Operation Performed - Deviate |
2010-06-17 | Surface Casing Operation Performed |
2010-06-27 | Intermediate Casing Operation Performed |
2010-07-05 | Finished Drilling |
2010-07-05 | Well Log Performed |
2010-07-05 | Well Mode changed to Drilled and Cased |
2010-07-07 | Production Casing Operation Performed |
2010-07-07 | Rig Released |
2010-11-27 | Well Log Performed |
2010-12-02 | Perforation Treatment Performed - Jet Perforation |
2010-12-02 | Well Log Performed |
2010-12-03 | Perforation Treatment Performed - Fractured |
2010-12-08 | Perforation Treatment Performed - Jet Perforation |
2010-12-08 | Well Log Performed |
2010-12-10 | Perforation Treatment Performed - Fractured |
2010-12-10 | Perforation Treatment Performed - Jet Perforation |
2010-12-10 | Well Log Performed |
2010-12-11 | Perforation Treatment Performed - Fractured |
2010-12-11 | Perforation Treatment Performed - Jet Perforation |
2011-01-02 | Well Log Performed |
2011-01-03 | Perforation Treatment Performed - Jet Perforation |
2011-01-03 | Well Log Performed |
2011-01-04 | Perforation Treatment Performed - Jet Perforation |
2011-01-04 | Well Log Performed |
2011-01-05 | Perforation Treatment Performed - Fractured |
2011-01-05 | Perforation Treatment Performed - Jet Perforation |
2011-01-05 | Well Log Performed |
2011-01-06 | Perforation Treatment Performed - Fractured |
2011-01-20 | Well Structure changed to Commingled |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2010-06-14 | 138.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-12-02 | Perforation | 3914.00 | 3915.00 | 10 |
2010-12-10 | Fracture | 3859.00 | 3886.50 | 0 |
2010-12-11 | Fracture | 3632.00 | 3711.00 | 0 |
2010-12-11 | Perforation | 3632.00 | 3633.00 | 7 |
2011-01-03 | Perforation | 3483.50 | 3485.50 | 20 |
2011-01-04 | Perforation | 3483.50 | 3485.50 | 20 |
2011-01-05 | Perforation | 3298.00 | 3299.00 | 7 |
2011-01-05 | Perforation | 3282.00 | 3282.50 | 7 |
2011-01-05 | Perforation | 3303.00 | 3304.00 | 7 |
2011-01-05 | Fracture | 3483.50 | 3485.50 | 0 |
2011-01-05 | Perforation | 3306.50 | 3308.00 | 7 |
2010-12-02 | Perforation | 3919.00 | 3920.00 | 10 |
2011-01-06 | Fracture | 3282.00 | 3308.00 | 0 |
2010-12-02 | Perforation | 3929.50 | 3930.50 | 10 |
2010-12-03 | Fracture | 3914.00 | 3915.00 | 0 |
2010-12-03 | Fracture | 3919.00 | 3930.50 | 0 |
2010-12-08 | Perforation | 3859.00 | 3860.00 | 10 |
2010-12-08 | Perforation | 3879.50 | 3880.50 | 10 |
2010-12-08 | Perforation | 3885.50 | 3886.50 | 10 |
2010-12-10 | Perforation | 3709.00 | 3711.00 | 7 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-06-13 | Lost Circulation | 120.00 | 120.00 |
For data sources see[6]