X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0606032001006

Well Details

Well ID: 0606032001006
Loading map...
Location: 00/01-20-060-03W6/6
Location Alias: 00/01-20-60-03 W6M
Location Alias 2: 00/01-20-060-03 W6/06
Country: Canada
Province: Alberta
Township: 060
Meridian: 6
Range: 03
Section: 20
County/Municipality: Municipal District of Greenview No. 16
Well Name: ECA ECOG RESTHA 1-20-60-3
Operator Name: Jupiter Resources Inc.
License Number: 0327558
License Date: 2005-03-04
License Status: Amended
Spud Date: 2005-04-07
Final Drill Date: 2005-05-16
Well Total Depth: 3455.00 m
Surface Hole Latitude: 54.198028
Surface Hole Longitude: -118.402982

For data sources see[1][2]

Well History

Date Event
2005-03-04 Obtained License
2005-04-09 Surface Casing Operation Performed
2005-04-29 Well Log Performed
2005-04-30 Intermediate Casing Operation Performed
2005-05-14 Well Log Performed
2005-05-15 Production Casing Operation Performed
2005-05-16 Finished Drilling
2005-05-16 Rig Released
2005-05-16 Well Mode changed to Drilled and Cased
2005-08-27 Well Log Performed
2005-08-31 Perforation Treatment Performed - Jet Perforation
2005-08-31 Well Log Performed
2005-09-04 Perforation Treatment Performed - Fractured
2005-09-08 Perforation Treatment Performed - Jet Perforation
2005-09-08 Well Log Performed
2005-10-10 Perforation Treatment Performed - Fractured
2005-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-20 Well Log Performed
2005-10-21 Perforation Treatment Performed - Jet Perforation
2005-10-21 Well Log Performed
2005-10-25 Perforation Treatment Performed - Fractured
2005-10-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-31 Well Log Performed
2005-11-01 Perforation Treatment Performed - Jet Perforation
2005-11-11 Perforation Treatment Performed - Fractured
2005-11-17 Perforation Treatment Performed - Jet Perforation
2005-11-20 Well Log Performed
2005-11-21 Perforation Treatment Performed - Jet Perforation
2005-11-23 Well Log Performed
2005-11-24 Well Log Performed
2005-11-25 Well Log Performed
2005-11-28 Perforation Treatment Performed - Cement Squeeze
2005-12-04 Well Log Performed
2005-12-05 Well Log Performed
2005-12-07 Well Log Performed
2005-12-13 Perforation Treatment Performed - Fractured
2005-12-18 Perforation Treatment Performed - Jet Perforation
2005-12-18 Well Log Performed
2006-01-04 Perforation Treatment Performed - Cement Squeeze
2006-01-07 Well Log Performed
2006-01-08 Well Log Performed
2006-01-09 Perforation Treatment Performed - Jet Perforation
2006-01-09 Well Log Performed
2006-01-13 Perforation Treatment Performed - Fractured
2006-01-19 Well Log Performed
2006-02-28 Perforation Treatment Performed - Jet Perforation
2006-03-01 Perforation Treatment Performed - Jet Perforation
2006-03-02 Well Log Performed
2006-03-03 Well Log Performed
2006-03-10 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-08-31 Perforation 3421.00 3422.00 17
2005-10-25 Fracture 3296.00 3301.00 0
2005-10-31 Packing Device Capped w/Cement 3269.60 3279.50 0
2005-11-01 Perforation 3128.00 3130.00 17
2005-11-11 Fracture 3128.00 3130.00 0
2005-11-17 Perforation 2960.00 2960.50 70
2005-11-21 Perforation 2983.00 2987.00 17
2005-11-28 Cement Squeeze 2960.00 2960.50 0
2005-12-13 Fracture 2983.00 2987.00 0
2005-12-18 Perforation 2706.00 2706.50 70
2005-12-18 Perforation 2650.00 2650.50 70
2005-08-31 Perforation 3411.00 3412.00 17
2006-01-04 Cement Squeeze 2706.00 2706.30 0
2006-01-04 Cement Squeeze 2650.00 2650.30 0
2006-01-09 Perforation 2696.00 2700.00 17
2006-01-13 Fracture 2696.00 2700.00 0
2006-02-28 Perforation 3296.00 3301.00 17
2006-03-01 Perforation 3329.00 3331.00 17
2006-03-01 Perforation 3395.00 3422.00 17
2005-08-31 Perforation 3405.00 3405.50 17
2005-08-31 Perforation 3395.00 3396.00 17
2005-09-04 Fracture 3395.00 3422.00 0
2005-09-08 Perforation 3329.00 3331.00 17
2005-10-10 Fracture 3329.00 3331.00 0
2005-10-20 Packing Device Capped w/Cement 3314.00 3316.50 0
2005-10-21 Perforation 3296.00 3301.00 17

For data sources see[4]



References